Past operability
From kanterella
Jump to navigation
Jump to search
A past operabilty evaluation determines when a condition existed prior to time of discovery. This type of review is most relevant to the prohibited by TS reporting criteria because a single train may have been inoperable due to a condition without it being known.
Topic | |||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Region 1
Region 2
Region 3
Region 4
| |||||||||||||||||||||||||||||||||||||||||||||||||
All by date |
|