Recently irradiated fuel is fuel that was contained in the critical reactor core.
This term comes from TS requirements for when LCO are applicable. Because one of the postulated accidents, plant systems have to react to prevent its consequence. Specifically a fuel drop could release radioactive material that needs to be contained. The emphasis was placed on "hot" fuel or recently irradiated fuel.
Topic |
|---|
|
|
| All by date | | | Start date | Site | Title |
|---|
| ML25213A183 | 27 August 2025 | Comanche Peak | – Issuance of Amendment Nos. 193 and 193, Respectively, to Change Technical Specifications Consistent with TSTF-51, TSTF-471-A and TSTF-571 | | RA-25-0075, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 19 August 2025 | Oconee | License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | | ML25218A145 | 18 August 2025 | Waterford | – Issuance of Amendment Nos. 337 and 276, Respectively Related to Adoption of TSTF-589 | | RS-25-110, Constellation Energy Generation, Llc., Application to Revise Technical Specifications to Adopt TSTF-599, Revision 1, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators | 5 August 2025 | Dresden Peach Bottom Nine Mile Point Byron Braidwood Limerick Clinton Quad Cities LaSalle | Constellation Energy Generation, Llc., Application to Revise Technical Specifications to Adopt TSTF-599, Revision 1, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators | | NLS2025003, Application to Revise Technical Specification to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 | 24 June 2025 | Cooper | Application to Revise Technical Specification to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 | | ML25098A308 | 28 May 2025 | Diablo Canyon | Issuance of Amendment Nos. 250 and 252 Revise Technical Specifications to Adopt TSTF-541 | | LR-N25-0015, License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 2 | 4 April 2025 | Hope Creek | License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 2 | | ML25079A225 | 20 March 2025 | Millstone | License Amendment Request to Revise Technical Specifications Related to Control Building Isolation, Accident Monitoring Instrumentation Accumulator and Refueling Water Storage Tank Boron Concentration | | ML25077A247 | 18 March 2025 | FitzPatrick | 2025 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal | | RS-25-016, License Amendment Request to Adopt TSTF-286, TSTF-471, TSTF-571-T | 14 March 2025 | Byron Braidwood | License Amendment Request to Adopt TSTF-286, TSTF-471, TSTF-571-T |
|
|---|