ML23150A172
| ML23150A172 | |
| Person / Time | |
|---|---|
| Site: | Monticello, Prairie Island |
| Issue date: | 05/30/2023 |
| From: | Domingos C Northern States Power Company, Minnesota, Xcel Energy |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| L-XE-23-006, RIS 2023-01 | |
| Download: ML23150A172 (1) | |
Text
fl Xcel Energy*
May 30, 2023 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 414 Nicollet Mall Minneapolis, MN 55401 L-XE-23-006 RIS 2023-01 NRC Regulatory Issue Summary 2023 Preparation and Scheduling of Operator Licensing Examinations As requested by NRC Regulatory Issue Summary 2023-01, "Preparation and Scheduling of Operator Licensing Examinations," dated April 19, 2023, Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, hereby submits the operator licensing examination data for calendar years 2024 through 2027 for the Monticello and Prairie Island Nuclear Generating Plants. Enclosed is the corresponding NRC Form 536 which provides the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.
Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
(
Christopher P. Domingos Site Vice President, Monticello and Prairie Island Nuclear Generating Plants Northern States Power Company - Minnesota Enclosures Cc:
Administrator, Region Ill, USNRC Region Ill, ATTN: Operations Branch, USNRC Project Manager, Monticello and Prairie Island, USNRC Resident Inspectors, Monticello and Prairie Island, USNRC
ENCLOSURES NRC FORM 536 OPERATING LICENSING EXAMINATION DATA FOR CY 2024 THROUGH 2027 FOR MONTICELLO NUCLEAR GENERATING PLANT AND PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNIT 1 AND 2 2 Pages to Follow
NRC FORM 536 (01-2021)
U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 01/31/2024 Estimated burden per response to comply with this voluntary information collection request: 45 minutes.
This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; e-mail: oira_submission@omb.eop.gov. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY CY CY CY CY CY CY NRC FORM 536 (01-2021)
Monticello Nuclear Generating Plant III 24 1
25 26 1
27 24 6
10 2
10/14/2024 11/4/2024 25 26 8
10 2
9/21/2026 10/19/2026 27
~AAEGt,(
~"
~~¥%
i
~
C
~
~
~o~
I I
NRC FORM 536 (01-2021)
U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 01/31/2024 Estimated burden per response to comply with this voluntary information collection request: 45 minutes.
This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; e-mail: oira_submission@omb.eop.gov. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY CY CY CY CY CY CY NRC FORM 536 (01-2021)
Prairie Island Nuclear Generating Plant III 24 1
25 1
26 27 1
24 6
10 2
0 8/12/2024 8/26/2024 25 6
10 2
0 11/10/2025 10/13/2025 26 27 6
10 2
0 10/11/2027 10/25/2027
~RAEGc,<
- ,)(.,
"f;.
l¥\\
0
~
C
~
~
I,;
~+..,
+-0.e, I
I