L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report

From kanterella
Jump to navigation Jump to search
2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report
ML23212A991
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 07/31/2023
From: Brown G
Northern States Power Company, Minnesota, Xcel Energy
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-MT-23-028
Download: ML23212A991 (1)


Text

fl Xcel Energy 2807 West County Road 75 Monticello, MN 55362 July 31,2023 L-MT-23-028 10 CFR 50.55a ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington,DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 2023 Refueling Outage 90-Day lnservice Inspection (ISi) Summary Report Pursuant to 10 CFR 50.55a,Northern States Power Company - a Minnesota corporation (NSPM),doing business as Xcel Energy,hereby submits the enclosed lnservice Inspection (ISi) Summary Report and Form OAR-1 "Owner's Activity Report" (Enclosure 1) for the Monticello Nuclear Generating Plant (MNGP).

The Owner's Activity Report has been prepared in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code,Section XI Code Case N-532-5,"Alternative Requirements to Repair and Replacement Documentation Requirements and lnservice Summary Report Preparation and Submissions as Required by IWA-4000 and IWA-6000,Section XI,Division 1".

The Enclosure to this letter contains Form OAR-1,"Owner's Activity Report" for lnservice which includes inspections conducted during the MNGP refueling outage (1R31) that concluded on May 14th, 2023.

Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

L1--

Gregory D. Srown Plant Manager,Monticello Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure (1) cc: Administrator,Region Ill, USNRC Project Manager,Monticello,USNRC Resident Inspector,Monticello, USNRC

ENCLOSURE 1 Monticello Nuclear Generating Plant Owners Activity Report Form OAR-1 3 Pages Follow

Monticello Nuclear Generating Plant Cycle 31 Summary Report Inservice Inspection 2023 Refueling Outage FORMOAR-1 Page 1 of 1 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number_M=NGP1R310AR-1 _____________________________

Plant -Mon=ti=c=el=loNuc=l= ea=rG==en=e=r=a=tin=qP=lan=t.2=8=07Wes=tC=ou=n=tyR=o= ad7=5. =M=ont=ic=ell=o. M=in=n=e=s=ot=a5=53=6=2-------

Unit No.------ Commercial service date -J=u=n= e=3=01971__ Refueling outage no.__ 1R=31___

(if applicable)

Current inspection interval --'-'IS,,_,I"--: -"5'----th_,l-'--' n ..,_,ln.,_,t"'

o,.,.

ns,,..p,,.,e=c'-"ti"" erv a"-I _....,_/___,IWE=:_3 rd lns p ection In=terva=I __________ _

(1st, 2nd, 3rd, 4th, other)

Current inspection period ---"IS=I: 3rdlns=p=e=c=ti=o= nPeri=o= d-_IW nd

--'-E: =2 ln=sp=e=c=ti=o= n--'-Peri=o=d___________ _

(1st, 2nd, 3rd)

Edition and addenda of Section XI applicable to the inspection plans ISi: 2007 Edition. 2008 Addenda / IWE: 2013 Edition Date and revision of inspection plans ISi: 5 th Interval Plan, Rev.3, 3/22/2023 / IWE: 3rd Interval Plan, Rev. 0, 9/13/2019 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____ _

2017 Edition. IWA-4540(b)

Code Cases used for inspection and evaluation:_N'-----5=5=2=---'-1 N-61=3_, -2N-7 0 = 2N --'--_,_

7_,_1 6

=__________ _

(if applicable, including cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of __1=R=3 --'-1C2=0=23R '---- FO=)_

(refueling outage number) conform to the requirements of Section XI.

Signed: (  :,.-1,_,1/~ ' . ISi Pro ram Owner Date _7..._

/1'----7/Q..,__3,________________

---~'-o~- wer or Owner:,S

  1. ~*ftsignee,

,-,_ Title _____E_n- -

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford. Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in the report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

  • Jt:.

___ ._,,--*A, _* _/2_i_,i_<._k_,.../.-",;____

Inspector's Signature Commission -------N=B118=63 lN=R-------

(National Board Number and Endorsements)

J Date_-_7_/_/7 ---1/*-L_O<-- __

Monticello Nuclear Generating Plant Cycle 31 Summary Report Inservice Inspection 2023 Refueling Outage TABLE 1 Page 1 of 1 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description VT-3 identified relevant crack like indications in the weld area.

Indications do not appear to be service induced. Indications most SR-79, RHRSW Pipe Seismic likely due to inadequate workmanship during fabrication.

F-A, F1.30a Restraint Evaluated by Engineering for continued service. Reference QIM 501000072621 QIM / CAP AR - acronyms for "Quality Issue Management/ Corrective Action Program - Action Request"

Monticello Nuclear Generating Plant Cycle 31 Summary Report Inservice Inspection 2023 Refueling Outage TABLE 2 Page 1 of 1 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Plant Item Description of Work Completed Date R/R Plan #

Class ID # Description Completed 2 D15-3"- Segment of Replace section of pipe, due to 12/6/2022 2021-31-011 HE RCIC piping through-wall leakage.

1 XR-7-2 RECIRC Perform weld repair to restore 7/7/2022 2022-31-016 PMP LOOP gasket surface.

DRN Valve