Reissue - Monticello Nuclear Generating Plant - Integrated Inspection Report 05000263/2022003
ML22321A223
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/17/2022
From: Laura Kozak
NRC/RGN-III/DORS/RPB3
To: Domingos C
Northern States Power Company, Minnesota
References
IR 2022003
Download: ML22321A223 (21)


Text

SUBJECT:

REISSUE - MONTICELLO NUCLEAR GENERATING PLANT - INTEGRATED INSPECTION REPORT 05000263/2022003

Dear Christopher Domingos:

The NRC identified that the inspection report sent to you dated November 14, 2022, (ML22307A182) inadvertently omitted an inspection finding that was identified during the inspection period and discussed at the exit meeting. As a result, the NRC has re-issued the report in its entirety to contain the details of the inspection finding.

On September 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Monticello Nuclear Generating Plant. On October 6, 2022, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Monticello Nuclear Generating Plant.

November 17, 2022 If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Monticello Nuclear Generating Plant.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Laura L. Kozak, Acting Branch Chief Reactor Projects Branch 3 Division of Operating Reactor Safety Docket No. 05000263 License No. DPR-22

Enclosure:

As stated

Inspection Report

Docket Number:

05000263

License Number:

DPR-22

Report Number:

05000263/2022003

Enterprise Identifier:

I-2022-003-0050

Licensee:

Northern States Power Company, Minnesota

Facility:

Monticello Nuclear Generating Plant

Location:

Monticello, MN

Inspection Dates:

July 01, 2022 to September 30, 2022

Inspectors:

J. Corujo-Sandin, Senior Reactor Inspector

T. McGowan, Senior Resident Inspector

D. Melendez-Colon, Reactor Inspector

V. Myers, Senior Health Physicist

C. Norton, Senior Resident Inspector

L. Rodriguez, Senior Reactor Inspector

Approved By:

Laura L. Kozak, Acting Branch Chief

Reactor Projects Branch 3

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Monticello Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Maintain FLEX Equipment Consistent with the Requirements of 10 CFR 50.155(c)(2)

Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000263/2022003-01 Open/Closed

[H.14] -

Conservative Bias 71111.15 The inspectors identified a Green, very low safety significance, non-cited violation of 10 CFR 50.155(c)(2), mitigation of beyond-design-basis (BDB) events, in that the licensee failed to reasonably protect equipment relied on for the mitigation of BDB events from the effects of natural phenomena that are equivalent in magnitude to the phenomena assumed in developing the design basis of the facility. Specifically, in a misapplication FP-BDB-EQP-01,

Equipment Important to BDB Compliance, the FLEX forklift and FLEX front-end loader were routinely left unprotected from the effects of natural phenomena events for longer than allowed.

Additional Tracking Items

None.

PLANT STATUS

Monticello began the inspection period at rated thermal power. At 7:00 pm on August 29, 2022, the licensee lowered power to 95 percent of rated thermal power to accommodate wind and solar generation and returned to rated thermal power at 8:00 pm on August 29, 2022. At 2:00 am on September 25, 2022, the licensee lowered power to 85 percent of rated thermal power to accommodate wind and solar generation and returned to rated thermal power at 6:00 am on September 25, 2022. The unit remained at or near rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

External Flooding Sample (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated that flood protection barriers, mitigation plans, procedures, and equipment are consistent with the licensees design requirements and risk analysis assumptions for coping with external flooding on August 24, 2022.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Division 1 250-volt dc system, protected train, containing battery 13 associated battery charger and dc distribution panel on July 26, 2022
(2) High pressure coolant injection system (HPCI) during work week window: 2238 on September 22, 2022

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of emergency diesel generator (EDG) 12 system on September 16, 2022

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire zone 13-B, reactor feed pump and lube oil reservoir room on July 05, 2022
(2) Fire zone 3-A, recirculation motor generator set room on July 05, 2022
(3) Fire zone 31-A, emergency filtration building (EFT) first floor, division 1 on July 05, 2022
(4) Fire zone 5-C, fuel pool skimmer tank room on July 06, 2022
(5) Fire zone 13-C, turbine building 911' elevation east MCC area on July 06, 2022

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Flood zone PAB-1

71111.07T - Heat Exchanger/Sink Performance Heat Exchanger (Service Water Cooled) (IP Section 03.02)

The inspectors evaluated heat exchanger performance on the following:

(1)13 Residual Heat Removal Service Water Pump Cooler (P-109C)

(2)

'A' Residual Heat Removal Room Air Cooling Unit (V-AC-5)

Ultimate Heat Sink (IP Section 03.04) (1 Sample)

The inspectors evaluated the ultimate heat sink performance on the following:

(1) The ultimate heat sink, specifically Sections 03.04.b and 03.04.c were completed

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during testing and the return to service of the HPCI system on September 22, 2022.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated integrated scenarios during shift 2 simulator training on August 11, 2022

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (4 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Electric fire pump discharge air vent on August 10, 2022
(2) Secondary containment isolation dampers on August 31, 2022
(3) Core spray pump 11 relay maintenance, calibration, and testing on September 13, 2022
(4) HPCI turbine speed governor EG-M replacement on September 21, 2022

Aging Management (IP Section 03.03) (1 Sample)

The inspectors evaluated the effectiveness of the aging management program for the following SSCs that did not meet their inspection or test acceptance criteria:

(1) Steam jet air ejector valve failure on May 13, 2022

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Emergent work activity to address water found in the residual heat removal (RHR)14 pump upper bearing oil reservoir sample on July 8, 2022
(2) Initial implementation of the FLEX maintenance provisions of FP-WM-SCH-01, online scheduling process, to repair shaft seal leak on P-902A, off gas recombiner condensate cooling pump 11 on July 14, 2022
(3) Emergent work activity to address steam leaks on HPCI system, root valves on July 27, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1)

===501000066143, SW21-1 & SW22-1, residual heat removal service water (RHRSW) system to service water system check valves, failed inservice testing (2)501000066330, unable to dial out on phone system (3)501000066684, vibration data bad P109D, RHRSW pump 14 (4)501000065942, flex forklift storage improvement

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)

=

The inspectors evaluated the following temporary or permanent modifications:

(1) Instrument air compressors controller upgrade

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (9 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:

(1) RHR 11 service water pump following pump replacement on July 1, 2022
(2) RHR 14 pump following motor upper bearing cooling water leak repair on July 8, 2022
(3) EDG 11 following planned preventive maintenance on July 13, 2022
(4) HPCI steam leak repairs (root isolation valves) on July 25, 2022
(5) Secondary containment isolation dampers on August 31, 2022
(6) Hydraulic control unit for CRD 10-39 (accumulator replacement) on September 06, 2022
(7) HPCI turbine stop valve on September 22, 2022
(8) HPCI turbine water induction protection system exhaust drain hi-hi level switch on September 22, 2022
(9) HPCI solenoid valve (CV-2043) on September 22, 2022

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (4 Samples)

(1) Recombiner train outlet hydrogen analyzer surveillance on July 07, 2022
(2) Security system emergency diesel generator operability check on July 07, 2022
(3) Fire detection and instrumentation detector sensitivity check for battery rooms and cable spreading room on July 20, 2022
(4) HPCI system surveillance testing on September 22, 2022

Inservice Testing (IP Section 03.01) (1 Sample)

(1) HPCI quarterly pump and valve tests on July 08, 2022

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) Licensed operator retraining scenario with graded emergency action level classification on September 26,

RADIATION SAFETY

71124.07 - Radiological Environmental Monitoring Program

Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples.

Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.

GPI Implementation (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative program to identify incomplete or discontinued program elements.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05)===

(1) July 1, 2021 through June 30, 2022

MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)

(1) July 1, 2021 through June 30, 2022

MS08: Heat Removal Systems (IP Section 02.07) (1 Sample)

(1) July 1, 2021 through June 30, 2022

71152A - Annual Follow-Up Problem Identification and Resolution Annual Follow-Up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) The inspectors reviewed the effectiveness of corrective actions associated with power to security equipment on July 7, 2022
(2) The inspectors reviewed the effectiveness of corrective actions associated with documentation annotation and the failure to follow own process governing documenting results in various field records on August 03, 2022

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in documentation that might be indicative of a more significant safety issue
(2) The inspectors reviewed the licensees corrective action program for potential adverse trends in status control (i.e., bump sensitive equipment) that might be indicative of a more significant safety issue

INSPECTION RESULTS

Failure to Maintain FLEX Equipment Consistent with the Requirements of 10 CFR 50.155(c)(2)

Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000263/2022003-01 Open/Closed

[H.14] -

Conservative Bias 71111.15 The inspectors identified a Green, very low safety significance, non-cited violation of 10 CFR 50.155(c)(2), mitigation of beyond-design-basis (BDB) events, in that the licensee failed to reasonably protect equipment relied on for the mitigation of BDB events from the effects of natural phenomena that are equivalent in magnitude to the phenomena assumed in developing the design basis of the facility. Specifically, in a misapplication FP-BDB-EQP-01, Equipment Important to BDB Compliance, the FLEX forklift and FLEX front-end loader were routinely left unprotected from the effects of natural phenomena events for longer than allowed.

Description:

The FLEX debris removal equipment was routinely left unprotected from the effects of natural phenomena events for longer than the one shift allowed by FP-BDB-EQP-01, Equipment Important to BDB Compliance, which states, "Debris removal equipment must be returned to their designated storage location after use or by the end of shift." Vehicles and tools are stored in either the FLEX building or Warehouse 6 which meet ASCE-7

(37) requirements.

The licensee justified that as long as the work was going to continue the next day or the next week, the equipment need not be returned to BDB protective storage at the end of shift. On July 27, 2022, the FLEX forklift was removed from BDB protective storage and returned on August 3, 2022. On August 11, 2022, the FLEX forklift was removed from BDB protective storage and returned on August 15, 2022. On August 17, 2022, the FLEX forklift was removed from BDB protective storage for preventive maintenance and was returned on August 30, 2022. On August 28, 2022, the licensee documented that while performing the severe weather checklist, the step requiring verification that all FLEX equipment was in its storage location could not be performed. On September 7, 2022, the FLEX front-end loader was removed from BDB protective storage for preventative maintenance. On September 15, 2022, a rental front end loader was obtained as corrective action for not having the FLEX front-end loader available. The FLEX front-end loader was repaired and returned to its storage location on September 30, 2022.

Corrective Actions: This issue was entered into the licensee corrective action program.

Corrective Action References: 501000065942, 501000066382, 501000066386

Performance Assessment:

Performance Deficiency: The licensee failed to reasonably protect equipment relied on for the mitigation of beyond-design-basis-events from the effects of natural phenomena that are equivalent in magnitude to the phenomena assumed in developing the design basis of the facility.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Protection Against External Factors attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensee failed to protect equipment relied on for the mitigation strategies and guidelines from the effects of natural phenomena that are equivalent in magnitude to the phenomena assumed in developing the design basis of the facility.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The finding screened to green because, although it involved equipment credited in the FLEX strategy such that FLEX functions might not be completed in accordance with existing plant procedures within the time allotted, each exposure period was less than 21 days.

Cross-Cutting Aspect: H.14 - Conservative Bias: Individuals use decision making-practices that emphasize prudent choices over those that are simply allowable. A proposed action is determined to be safe in order to proceed, rather than unsafe in order to stop. Specifically, the inspectors determined that the licensee non-conservatively interpreted the FLEX debris removal equipment requirements of FP-BDB-EQP-01, Equipment Important to BDB Compliance, which states that the front-end loader and forklift can be removed from storage for non-FLEX use but must be returned to their storage location after use or by the end of shift. The licensee justified that as long as the work was going to continue the next day or the next week, the equipment did not need to be returned to storage at the end of shift.

Enforcement:

Violation: 10 CFR 50.155 (c)(2) requires that the equipment relied on for the mitigation strategies required to mitigate beyond-design-basis external events from natural phenomena be reasonably protected from the effects of natural phenomena that are equivalent in magnitude to the phenomena assumed for developing the design basis of the facility.

Contrary to this requirement, the licensee routinely left the FLEX forklift and the FLEX front-end loader unprotected for extended periods.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Observation: Follow-Up Review of Corrective Actions Associated with Past Documentation Annotation Pertaining to Maintenance and Surveillance Activities 71152A During the inspection period, the inspectors reviewed various documentation on recent preventive maintenance procedures and surveillance activities performed by site maintenance and operations personnel. The inspectors did not observe any issues pertaining to improper usage of markings for non-applicable steps, changing steps without appropriate approvals, or failure to perform independent verifications when required.

Observation: Corrective Actions Associated with Bump Sensitive Equipment 71152S On April 21, 2022, both fuel oil (FO) pumps, P-160B and P-160-D, were found running for emergency diesel generator (EDG) 12. Vortex considerations with both FO pumps running resulted in the inoperability but not the non-functionality of EDG 12. A vortex formed in the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of diesel operation at rated load would not have interrupted the flow of fuel from the storage tank to the day tank. The licensee returned the FO pumps to a normal lineup and declared EDG 12 operable. The licensee entered this issue into the corrective action program as QIM 50100062468, EDG FO pumps found running, EDG 12 inoperable. The licensee determined that workers likely bumped the switches while climbing a scaffold approximately three feet from the FO pump switches. The licensee protected the switches with covers to preclude future bumping.

On July 21, 2022, Xcel identified in QIM 501000064902 that Monticello had issues with status control of plant equipment that directly impacted emergency systems relied upon to protect public health and safety. The QIM established that workers were not effectively identifying and eliminating bump-sensitive component risks, consistently applying verification practices, and that marked status control areas were under-utilized to notify workers of sensitive equipment.

In August 2022, the licensee formed a multidisciplinary team to identify and recommend solutions to eliminate or reduce the risk associated with bump sensitive equipment. The team identified and initiated corrective actions for dozens of items.

Observation: Corrective Actions Associated with Power to Security Equipment 71152S On July 7, 2021, while testing security equipment, a component in the power supply failed to properly respond. The licensee entered this event into their corrective action program as quality issue management (QIM) 501000053835.The licensee performed an apparent cause evaluation and identified that the station personnel did not demonstrate adequate troubleshooting and teamwork needed to identify that a system was not properly configured.

Contributing causes included a lack of system knowledge, a lack of sensitivity to security significance, and inadequate procedures.

The inspectors verified that corrective actions to address the apparent cause and contributing causes were addressed. Corrective actions included revising the troubleshooting process to include security, revising operator rounds to include the component, training operators on these components, training security on the impacts of inoperable security equipment, revising the applicable test procedure to include clear prerequisite verification steps, updating security procedures, creating alarm response procedures associated with these components, revising maintenance surveillance procedures. The inspectors observed the testing of the components on July 7, 2022, and verified corrective actions effectively prevented recurrence of the event.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 6, 2022, the inspectors presented the integrated inspection results to Mr. C. Domingos, Site Vice President, and other members of the licensee staff.

On July 28, 2022, the inspectors presented the radiation protection inspection results to Ms. M. Neal, Director Nuclear Fleet Operations, and other members of the licensee staff.

On August 26, 2022, the inspectors presented the triennial heat sink inspection results to Mr. S. Hafen, Plant Manager and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1478

External Flood Monthly and Annual Surveillance

EWI-08.19.01

Cable Condition Monitoring Program

Procedures

FP-PE-CBL-01

Cable Condition Monitoring Program

71111.01

Work Orders

700091077-010

Underground Vaults for Water - Inspection

08/23/2022

NH-36051 (M-

133)

P&ID Diesel Oil System

U

NH-36051-1 (M-

133)

P&ID Diesel Oil System

NH-36249 (M-

23)

P&ID (Steam Side), High Pressure Coolant Injection System

NH-36249-1 (M-

23-1)

P&ID HPCI Hydraulic Control & Lubrication System

NH-36250 (M-

24)

P&ID (Water Side), High Pressure Coolant Injection System

Drawings

NH-36664 (M-

2)

P&ID RHR Service Water & Emergency Service Water

Systems

Ops Man

B.09.08.05

Emergency Diesel Generators

Ops Man B.09.09-

(Description of

Equipment)

250 VDC System

71111.04

Procedures

Ops Man B.09.09-

250 VDC System (Figures)

Strategy A.3-03-A

Fire Zone 3-A, RECIRC MG Set Room

Strategy A.3-05-C

Fuel Pool Skimmer Tank Room

Strategy A.3-13-B

Fire Zone 13-B, RX Feed Pump and Lube Oil Reservoir

Room

Strategy A.3-13-C

Turbine Building 911' Elevation East MCC Area

71111.05

Fire Plans

Strategy A.3-31-A

EFT Building 1st Floor (Division 1)

Calculations07-035

Monticello Generating Plant Internal Flooding Analysis

71111.06

Procedures

C.4-I

Operations Manual Section: Abnormal Procedures, Plant

Flooding

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

08-085

Post LOCA Reactor Building Heatup Analyses for EPU

0F

Calculations97-083

Acceptance Criteria for RHRSW Flow Loop Checks in

Procedure 7070

Calibration

Records

FI-7189 Card 6

FI-7189: Division 1 RHR/RHR-SW/CS Systems Test

Instrument, Card 6

03/17/2021

501000049337

FI-7189 Indicating Higher Than Actual

03/09/2021

501000049639

FI-7189 Impact on 13 RSW Pump Baseline

03/17/2021

501000056747

ECCS Pump Availability Question

10/05/2021

501000057418

IST Annual Trending Review

10/19/2021

501000058725

Repeat - Condenser Fouling

2/02/2021

Corrective Action

Documents

501000062175

RHR RM Cooling Units PRA Model Concern

04/12/2022

501000065806

22 UHS: RHRSW IST Procedures ISTB-3550

08/24/2022

501000065812

2UHS: Unknown Flow Noise in A RHR Rm

08/24/2022

501000065826

2UHS: Enhancements to A.6, Acts of Nature

08/24/2022

501000065848

2UHS: Temp Gradient Across RHRSW-14

08/24/2022

501000065853

2UHS: RHRSW Flow Loop Cal Units

08/25/2022

501000065873

2UHS: Clarify GL 89-13 HX Criteria

08/25/2022

501000065884

2UHS: NRC Observations

08/25/2022

Corrective Action

Documents

Resulting from

Inspection

501000065901

2UHS: M&TE Process Post FI-7189 Failure

08/25/2022

NH-36664

P&ID RHR Service Water & Emergency Service Water

Systems

Drawings

NH-36665

P&ID Service Water System & Make-Up Intake Structure

109

601000003242

RHR Flow Loop Calibration

03/18/2022

Engineering

Changes

6EQVENG27783

Replace V-4AC-4 and V-AC-5 Cooling Coils

2/28/2020

A.6

Acts of Nature

B.08.01.04-05

Emergency Service Water

C.4-B.08.01.01.A

Loss of Service Water

C.6-020-A-17

Southeast Equip Rm V-AC-5 High Temp

C.6-CWT104

River Level - Low

C.6-CWT502

River Flow - Low

DBD-S.04

Intake Structure

DBD-T.19

Design Bases Document: External Considerations

D

71111.07T

Procedures

EWI-08.22.01

Generic Letter 89-13

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

I.05.25

Zebra Mussel Inspection

00449322

Mech - Replace 13 RHRSW Motor Cooling Coil

10/28/2013

00518804

Mech-P-109C, Clean 13 RHRSW Motor Cooler Per

4058-03-PM

01/18/2018

700039942-0010

RHR Service Water System Instrument Maintenance

Procedure

03/03/2020

700047296

4058-3 (Clean 13 RHRSW Motor Clr P-109C)

2/16/2021

700055078

PM 4126 (Inspect West Service Water Bay)

09/28/2021

700057971

PM 4125 (Inspect East Service Water Bay)

04/21/2021

700059226

4058-5 A RHR RM Air Cooling Unit V-AC-5

07/14/2020

700060484

Intake Bay/Traveling Screen Forebays Inspection

09/28/2021

700082689-0010

A RHR Room Air Cooling Unit V-AC-5 Internal Cleaning,

External Cleaning and Visual Inspection

05/12/2022

700087674

FI-7189, Replace Indicator

03/17/2021

700089703-0020

RHRSW-14/68, SAWA Valve Testing

08/16/2022

700091195-0010

P-109C, Generate Pump Curve

2/14/2021

700098226-0010

"A" RHRSW Quarterly Pump and Valve Tests

03/09/2022

700099950-0010

ESW Quarterly Pump and Valve Tests

04/19/2022

700102185-0010

"A" RHRSW Quarterly Pump and Valve Tests

06/10/2022

Work Orders

700103955-0010

SW-103 and SW-104 Valve Operability Test

07/20/2022

Miscellaneous

Simulator

Exercise Guide

(SEG) MT-LOR-

2D-001S

Licensed Operator Requalification, Cycle 22D Integrated

Scenario (Simulator)

08/02/2022

255-06-IA-1

HPCI Quarterly Pump and Valve Tests

109

1069

HPCI Flow Control System Dynamic Test Procedure

7136

HPCI System Instrumentation Maintenance

71111.11Q

Procedures

B.03.02-05

Opening HPCI Steam Line Isolation Valves, MO 2304 and

2305

Corrective Action

Documents

501000066352

4kVB-34 Kept Charging After Closing

09/12/2022

NE-36404-5

2-505 Elementary

71111.12

Drawings

NH-36808 (M-

P&ID - Air Flow Diagram Reactor Building Upper Part

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

157)

NX-8875-50-8

2-505 Internal

E

4048-PM

Secondary Containment Isolation Damper Maintenance

4115-PM

HPCI System Inspection

4850-505-PM

2-505, 11 CS Pump Relay Maintenance, Calibration and

Test Tripping

FP-MA-ES-01

Electrical Safety

Procedures

FP-PE-RLP-01

License Renewal Implementation

700074627-0020

Secondary Containment Isolation Damper

08/31/2022

700076209-0030

HPCI Turbine Speed Governor EGM

09/21/2022

Work Orders

700085022

Electric Fire Pump Air Vent Rebuild

08/10/2022

Corrective Action

Documents

501000065007

HPCI Steam Line De-Pressure Time

07/26/2022

Drawings

NH-54817-4

P&ID Off Gas Modification Train 'A'

1376-02

RHR Pump Motor Oil Sampling

FP-WM-SCH-01

Online Scheduling Process

Procedures

QF-2007

Planning and Approval of High Risk or Scheduled Work

Risk, Off Gas Recombiner Condensate Cooling Pump

700082311-0010

I-HPCI-R-7

07/27/2022

700106547-0010

I-HPCI-R-6

07/27/2022

700108898-0030

P-202D/MTR, Correct Oil Cooler Leakage

07/07/2202

71111.13

Work Orders

700108898-20

P-202D/MTR Pressure Test Installed Coil

07/07/2022

501000065942

FLEX Forklift Storage Improvement

501000066143

SW 21-1 and SW 22-1 Failed IST Testing

09/05/2022

501000066330

Unable to Dial Out on Phone System

0912/2022

501000066382

FLEX Equipment not Returned by End of Day

501000066386

Trend: Lack of Reverence for FLEX Equipment

Corrective Action

Documents

501000066684

Vibration Data Bad P-109D

09/23/2022

71111.15

Procedures

B.08.08-05

Plant Communications System

71111.18

Corrective Action

Documents

Resulting from

Inspection

501000065522

NRC identified Work Plan Typo (Wrong Component

Identified in Work Plan Title)

08/09/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Drawings

NH-36049-2

P&ID Instrument Air System

Engineering

Changes

601000002842

Commercial Change Package, Instrument Air Compressor

SEQC-1 Replacement

Work Orders

700087578-0017

IAC C-446 Elektronikon Installation

0074

Control Rod Drive Exercise

0187-01

Emergency Diesel Generator 11/Emergency Service Water

Quarterly Pump and Valve Tests

107

4048-PM

Secondary Containment Isolation Damper Maintenance

4115-PM

HPCI System Inspection

Procedures

7100

CRD-HCU Instrument Maintenance Procedure

700006422-0040

(PMT)

HPCI Turbine Stop Valve

700054643-0170

Post Maintenance Test/Return to Service Instructions

Emergency Diesel Generator 11

700082311-0020

LS-23-90 Lower Root Isolation Valve

07/25/2022

700106547-0020

LS-23-90-Upper Root Isolation Valve

07/25/2022

700107976-0090

PMT/RTS Instructions RHRSW 11 Pump

700108898-0040

P-202D/MTR, Cooling Coli PMT/RTS

07/07/2022

700109666-0020

Hydraulic Control Unit for Control Rod Drive 10-39

09/07/2022

7001111934-0020 LS-23-98 PMT

09/22/2022

71111.19

Work Orders

700112562-0030

(PMT)

SV-2043 Air Leaking Past Exhaust Port

NH-36249 (M-

23)

P&ID (Steam Side) High Pressure Cooling Injection System

Drawings

NH-3649-1 (M-

23-1)

P&ID HPCI Hydraulic Control & Lubrication System

211

Recombiner Train Outlet Hydrogen Analyzer Procedures

255-06-IA-1

HPCI Quarterly Pump and Valve Tests

109

298-02

Security System Emergency Generator Operability Check &

Alarm

ISP-FIR-1147-07

Fire Detection Instrumentation Detector Sensitivity Check for

Battery Rooms and Cable Spreading Room

71111.22

Procedures

NH-36250 (M-

P&ID (Water Side) High Pressure Coolant Injection System

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

24)

71114.06

Miscellaneous

RQ-SS-201

Scenario Evaluation Guide

Calibration

Records

29

Radiological Environmental Monitoring Air Sampler

Calibration

11/01/2021

545502

GEL Laboratories Analysis Report

06/22/2021

550647

GEL Laboratories Analysis Report

08/19/2021

550648

GEL Laboratories Analysis Report

08/19/2021

556389

GEL Laboratories Analysis Report

10/19/2021

558022

GEL Laboratories Analysis Report

11/03/2021

Miscellaneous

ODCM-07.01

Radiological Environmental Monitoring Program

I.05.33

Weekly Radiological Environmental Monitoring Procedures

I.05.36

Semiannual Shoreline Sediment and Fish Sampling

I.05.39

Monthly Radiological Environmental Analysis Report

Verification

I.05.43

Radiological Environmental Monitoring Air Sampler

Calibration and Maintenance

Procedures

I.05.51

Radiological Environmental Monitoring Vegetation Sampling

71124.07

Work Orders

700081451

Meteorological Tower Preventative Maintenance

10/22/2021

Corrective Action

Documents

501000063695

HPCI UA Not Entered into Phoenix

06/08/2022

QF0445 (FP-R-

PI-01)

NRC and MOR Data Collection and Submittal Forms; MSPI

High Pressure Injection System; 3rd Quarter 2021 through

2nd Quarter 2022

08/10/2022

QF0445 (FP-R-

PI-01)

NRC and MOR Data Collection and Submittal Forms; MSPI

Emergency AC Power Systems; 3rd Quarter 2021 through

2nd Quarter 2022

08/10/2022

Miscellaneous

QF0445 (FP-R-

PI-01)

NRC and MOR Data Collection and Submittal Forms; MSPI

Heat Removal Systems; 3rd Quarter 2021 through 2nd

Quarter 2022

08/10/2022

71151

Procedures

FP-R-PI-01

Preparation of NRC Performance Indicators

501000053835

Loss of Security Power during 0298-02

07/07/2021

Corrective Action

Documents

2000020940

Apparent Cause Evaluation, Loss of Security Power during

298-02

09/01/2021

71152A

Drawings

NF 85716

Security System Circuit Diagram 480 MCC-191, MCC-192,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

& MCC-193

501000062468

EDG FO Pumps Found Running, EDG 12 Inoperable

04/21/2022

501000064804

Water Gong Not Working

07/18/2022

501000065326

Switch Covers Needed for Status Control

08/05/2022

Corrective Action

Documents

501000065376

Evaluate Plexiglass Covers in the Plant

08/05/2022

Miscellaneous

Licensee Internal

Spreadsheet

Status Control Walkdown Work Sheet

08/08/2022

0000-A

Operations Daily Log - Mode 1

109

0010

Reactor SCRAM Functional Test

003

Drywell High Pressure SCRAM and Group 2, 3 & SCTMT

Isolation Test and Calibration Procedure

0030

ECCS High Drywell Pressure Sensor

0356

Stack/Vent Iodine/Particulate Sample

FP-G-DOC-4

Procedure Processing

Procedures

OSP-AN2-0567

Monitor ADS Pneumatic Supply

71152S

Work Orders

700093480-0010

Warehouse No.1/No.2 Fire Suppression

07/18/2022