June 30, 2020
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT - LICENSE RENEWAL PHASE IV REPORT 05000263/2020014
Dear Mr. Conboy:
On June 10, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Monticello Nuclear Generating Plant and discussed the results of this inspection with Ms. M. Kelly, Director of Site Performance and Support and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Ann Marie J. Stone, Chief Engineering Branch 1 Division of Reactor Safety
Docket No. 05000263 License No. DPR-22
Enclosure:
As stated
Inspection Report
Docket Number:
05000263
License Number:
Report Number:
Enterprise Identifier: I-2020-014-0002
Licensee:
Northern States Power Company, Minnesota
Facility:
Monticello Nuclear Generating Plant
Location:
Monticello, MN
Inspection Dates:
June 01, 2020 to June 10, 2020
Inspectors:
J. Corujo-Sandin, Reactor Inspector
G. O'Dwyer, Reactor Engineer
J. Park, Reactor Inspector
Approved By:
Ann Marie J. Stone, Chief
Engineering Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a License Renewal Phase IV at Monticello Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. For the inspection documented below, it was determined that the objectives and requirements stated in the IP could be performed remotely.
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
===71003 - Post-Approval Site Inspection for License Renewal
The team conducted this Phase IV license renewal inspection remotely. The team selected Aging Management Programs (AMPs) for evaluation considering risk insights and programs that were enhanced or new under the renewed operating license. The team also considered for selection those programs with monitoring results that were performed for the first time or those that identified examination or test results not experienced in the past. For the AMPs selected, the team reviewed records and interviewed plant staff to evaluate whether AMP elements were being implemented involving program scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, corrective actions, confirmation process, administrative controls, and operating experience.
The following aging management programs were evaluated by the team:
Post-Approval Site Inspection for License Renewal===
- (1) EWI-11.01.11; Fuel Oil Chemistry
- (2) EWI-11.01.14; Buried Piping & Tanks Inspection
- (3) EWI-11.01.19; Compressed Air Monitoring
- (4) EWI-11.01.31; Protective Coating Monitoring & Maintenance Program
- (5) EWI-11.01.33; Bolting Integrity
- (6) EWI-11.01.35; Selective Leaching of Materials
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On June 10, 2020, the inspectors presented the License Renewal Phase IV results to Ms. M. Kelly, Director of Site Performance and Support and other members of the licensee staff.
- On June 10, 2020, the inspectors presented the Technical Debrief inspection results to Mr. J. Madden, Engineering Manager and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71003
Corrective Action
Documents
226439
Corrosion Discovered on Removed Fire Protection Valve
06/28/2010
228174
FP-13, License Renewal, Evidence of Selective Leaching
11/08/2010
232662
Add Note to MMP-008 to Clarify Requirements for Thread
Lubrication
05/23/2020
249063
Selective Leaching Identified on FP-7-2 Valve
09/09/2010
254764
Selective Leaching Identified on FP-199
10/19/2010
01356511
Selective Leaching Long Term Management Strategy
10/25/2012
01449311
Selective Leaching: Program Not Updated for New Strategy
10/03/2014
01475664
Torus Internal Coating Flaking Noted During 1132
04/22/2015
01475667
Torus Internal Corrosion Noted During 1132
04/22/2015
01477384
Numerous Small Areas of PCT Coatings Failed Acceptance
Criteria
05/28/2015
01558080
Numerous Small Areas of PCT Coatings Failed Acceptance
Criteria
05/05/2017
501000002818
1R XFMR - Moisture Found in 13.8KV Bus
09/22/2017
501000002848
1R XFMR - Enclosed Buses Need Sealing
09/20/2017
501000012494
PM 4159 Air Leaks Identified
05/25/2018
501000026573
4159-PM -3 Air Leaks Identified in the Drywell and 1 Minor Air
Leak in Steam Chase
04/30/2019
501000026876
Small Areas of Unsat PCT Coating
05/04/2019
501000028542
1362 Air Quality Test for IA System under WO 700042064
Single Benign Particle Detected
06/14/2019
501000032327
LR FSA AMP Ownership Needs Improvement
09/26/2019
501000032338
LR FSA: AMP Documents Outdated/Incorrect
09/26/2019
501000032354
LR FSA: Sel. Leaching Strategy Unclear
09/26/2019
501000032360
LR FSA: Bus Duct Inspection Criteria
09/26/2019
501000032360
LR FSA-Bus Duct Procedures Correct but USAR Not Updated
10/31/2019
501000036476
01/13/2020
501000036529
GAP Review for EWI-11.01.33 vs GALL 2
01/15/2020
501000038263-
200421-000
USAR-K Update Needed for ASME XI ISI Programs
03/01/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
501000038783
App J AMP Doc Issue
03/13/2020
501000039741
Unable to Find Form 3839 Records
04/16/2020
501000039871
SL AMP Procedures - Add Ductile Iron
04/20/2020
501000039968
1362 Air Quality Test for 17 AC Detected 10 Particles Greater
than 40 Microns
04/23/2020
Corrective Action
Documents
Resulting from
Inspection
501000039970
20 LR NRC Insp: LR-ISG-2012-02 OEE
04/22/2020
501000040540
20 LR NRC Insp: AMP Doc PM Lists
05/12/2020
501000041198
20 LR NRC Insp: Buried Pipe AMP PM
06/02/2020
501000041227
20 LR NRC Insp: Response >24 hrs
06/03/2020
501000041258
20 LR NRC Insp: USAR-K SL Outdated
06/03/2020
501000041281
20 LR NRC Insp: SL Valve Strategy
06/03/2020
501000041300
20 LR NRC Insp: SL Inspection Doc
06/03/2020
501000041300
20 LR NRC Insp: SL Inspection Doc
06/03/2020
501000041303
20 LR NRC Insp: Duct Iron SL Insp Proc
06/04/2020
501000041313
20 LR NRC Inspection: EWI-11.01.33 Should Be Enhanced
to Clarify Molybdenum Disulfide (MoS2) SHALL NOT Be Used
on Bolts in Scope of Bolting Integrity Program
06/04/2020
501000041313
20 LR NRC Insp: EWI-11.01.33 MoS2 Enh
06/04/2020
501000041316
20 LR NRC Insp: EWI-11.01.31 Enh
06/04/2020
501000041342
20 LR NRC Insp: Inadequate CAP Closure
06/05/2020
501000041351
Gap in RM Process for Lost Records
06/05/2020
501000041384
20 LR NRC Insp Questioned EWI-11.01.19 Pump Casing
Requirement
06/08/2020
501000041463
20 LR NRC Insp: Coatings Observation
06/11/2020
Miscellaneous
600000676449
Fermi Power Plant, Unit 2 - Special Inspection Reactive Report
05/01/2020
610000000867
EPRI Selective Leaching State of the Art Technical Update
(3002016057)
03/25/2020
610000000879
NUREG-2191 Vol 2, Generic Aging Lessons Learned for
Subsequent License Renewal (GALL-SLR) Report, Section
XI.M33 Selective Leaching
05/12/2020
Procedures
0140
Drywell Interior Surface Inspection
268
Fire Protection System Flow Test
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
AWI-08.11.03
Nuclear Coatings Program
4108-01-PM
Emergency Diesel Generator 6 Year Maintenance
EWI-08.26.02
Selective Leaching Inspection Process
EWI-11.01.01
Bus Duct Inspection Program
EWI-11.01.11
Fuel Oil Chemistry
EWI-11.01.14
Buried Piping & Tanks Inspection
EWI-11.01.19
Compressed Air Monitoring
EWI-11.01.31
Protective Coating Monitoring & Maintenance Program
EWI-11.01.33
Bolting Integrity
EWI-11.01.35
Selective Leaching of Materials
FP-G-RM-01
Quality Assurance Records Control
FP-G-RM-02
Records Processing
FP-PE-RLP-01
License Renewal Implementation
FP-PE-UPT-01
Underground Piping and Tanks Integrity Program
FP-WM-PLA-01
Work Order Planning Process
NSP-DOL-0598
Diesel Fuel Oil Tank Inspection
NSP-DOL-0598
Diesel Fuel Tank Inspection
2000015193-
200420-000
Procedure Change Request for EWI-11.01.33 Bolting Integrity
03/09/2020
2000015610
Procedure Change Request for MMP-008, Bolting Practices
2000015610
Procedure Change Request for MMP-008
PEI-03.01.03
Selective Leaching (Graphitic Corrosion) Inspection
Self-Assessments 01468275
Audit Aging Management Programs
03/02/2015
01533999
Aging Management SSA in Prep for 2016 P&IR
09/07/2016
6060000001098
SnapShot Report, Perform AMP Effectiveness Reviews in
Accordance with NEI 14-12
03/01/2020
606000000952
License Renewal Phase IV Self-Assessment Plan
09/26/2020
Work Orders
00453355
CONST - T-44, Transfer Fuel to FRAC Tanks and Clean T-44
06/12/2013
00453355
CONST - T-44, Transfer Fuel to Frac Tanks and Clean T-44
06/12/2013
00457542
Perform Elec PM
07/07/2013
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
00487027
OPS-FIR, 0268 3-Year Fire Protection System Flow Test
2/01/2015
00532393
EPRO - MRE, UPTI Inspection
01/22/2018
00552645
Const - T-45A, Clean and Inspect T-45A Day Tank
01/19/2018
490719
0135 Torus Painted Surface Internal Insp.
05/09/2015
490906
0140 Drywell Interior Surface Inspection
05/09/2015
500121
PM 4159 Leak Detection PM 3 ARs 5 WOs
05/10/2016
533733
0140 Drywell Interior Surface Inspection
05/10/2017
537441
CPF: Hydrant FP-192 AND FP-27; Install New Valves
04/22/2017
537441
CPF: Hydrant FP-192 and FP-27, Install New Valves
03/17/2017
700005790-0020
Perform UT and Visual Inspection of Tank, Inspect LIS-7259
06/08/2017
700009412
EDG G-3B Electrical Control Panel Bolt Broken
2/13/2019
700013462
Performed PM 4858-59 for 1R XFMR X03
10/26/2017
700017270
Walk Down Found No Problems in Air and AN2 Systems within
LR Scope
04/14/2019
700020823
0140 Drywell Interior Surface Inspection
05/10/2019
700023986
PM 4159 Leak Reduced to Less than Champagne Bubbles
05/29/2018
700031848
PM 4954 Air Dryers Leak Shows Elbow Needs to Be Replaced
QIM 501000016607 Written
09/07/2018
700047082
Walked Down Found No Problems in Air and AN2 Systems
within LR Scope
2/13/2019
700058662
PM 4953 Compressors Results All SAT
01/28/2020
700059432
1362 Test All Results SAT
09/10/2019
700062663
1362 Test All Results Were SAT
03/13/2020
700067605
Graphitic Corrosion Inspection Results Form 3839
01/08/2020
QF0571
Troubleshooting Plan for QIM 501000039968 10 Particles
Greater than 40 Microns
04/23/2020