August 3, 2020
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT - INTEGRATED INSPECTION REPORT 05000263/2020002
Dear Mr. Conboy:
On June 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Monticello Nuclear Generating Plant. On July 7, 2020, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Hironori Peterson, Chief Branch 3 Division of Reactor Projects
Docket No. 05000263 License No. DPR-22
Enclosure:
As stated
Inspection Report
Docket Number:
05000263
License Number:
Report Number:
Enterprise Identifier: I-2020-002-0032
Licensee:
Northern States Power Company, Minnesota
Facility:
Monticello Nuclear Generating Plant
Location:
Monticello, MN
Inspection Dates:
April 01, 2020 to June 30, 2020
Inspectors:
R. Elliott, Acting Senior Resident Inspector
N. Feliz-Adorno, Branch Chief
T. Go, Health Physicist
G. Hansen, Sr. Emergency Preparedness Inspector
M. Holmberg, Senior Reactor Inspector
D. Krause, Resident Inspector
J. Robbins, Acting Sr. Resident Inspector
N. Shah, Project Engineer
A. Shaikh, Senior Reactor Inspector
D. Szwarc, Senior Reactor Inspector
J. Weigandt, Resident Inspector
Approved By:
Hironori Peterson, Chief
Branch 3
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Monticello Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
Type Issue Number Title Report Section Status URI 05000263/2020002-01 Partial Sample of FZ-08,
Cable Spreading Room Past Operability due to Installation of Heat Detectors with Incorrect Setpoint 71152 Open
PLANT STATUS
Monticello began the inspection period operating at approximately 100 percent power and, with the following exceptions, remained at that level throughout the inspection period. The plant reduced power to 75 percent, on June 17, 2020, for quarterly turbine valve testing and control rod drive scram insertion time testing, returning to 100 percent power prior to midnight.
Monticello performed multiple flexible power operations over the quarter, for electric grid efficiencies in the early mornings, reducing power to approximately 80 percent then returning to 100 percent power.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week and during that time conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)
The inspectors evaluated readiness for seasonal extreme weather conditions.
- (1) Ice storm preparations
External Flooding Sample (IP Section 03.03) (1 Sample)
The inspectors evaluated site readiness to cope with external flooding due to forecast high river levels from spring ice melt and rain
- (1) Intake basin and discharge canal and circulating water (CW) water house, including emergency service water, and diesel fire pump areas
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
(1)12 diesel generator emergency service water system - protected, on April 15, 2020
- (3) Hardened pipe vent on May 4, 2020
- (4) Circulating water bay traveling screens post diving activities on May 12, 2020
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Fire Zone (FZ) 09, control room, on April 10, 2020
- (2) FZ-02-B, east HCU on June 30, 2020
- (3) FZ-16, turbine building corridor east & west 911' & 931' on June 30, 2020
- (4) FZ-17, turbine building north cable corridor on June 30, 2020
- (5) FZ-19-C, feedwater pipe chase on June 30, 2020
71111.07A - Heat Sink Performance
Annual Review (IP Section 03.01) (1 Sample)
The inspectors evaluated readiness and performance of:
- (1) 1136-01 [Residual Heat Removal] RHR Division 1 heat exchanger efficiency on April 1, 2020
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
The inspectors observed and evaluated licensed operator performance in the control room during quarterly review of licensed operator requalification performance.
- (1) Downpower to 75 percent for quarterly turbine valve testing, reactivity maneuvering, and control rod drive scram insertion time testing
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
The inspectors observed and evaluated Resident Inspector Quarterly Review of Licensed Operator Requalification:
- (1) Licensed operator requalification cycle MT-LOR-20C-001V simulator evolution on June 8, 2020
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
(1)4KV breaker performance/maintenance on June 12, 2020
- (2) Residual heat removal on June 12, 2020
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed;
(1)15B feedwater heater transient on May 28, 2020
- (2) Loss of 11 cooling tower fans on June 2, 2020 (3)
'C' main steam drain tank controller on June 3, 2020
- (4) Division 1 RHR pump vibrations in alert range on June 9, 2020
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) DPIS-2-129C, recirculation loop DP LPCI [low pressure coolant injection] loop select interlock operability questioned on May 15, 2020
- (2) CRD system anchor bolts loose or missing on May 29, 2020
- (3) Weak link error, valve thrust assessment 10" anchor darling gate valves on June 12, 2020 (4)
'A' RHR room cable trays not fastened per MPS-2096 on June 19, 2020
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)
(1 Sample 1 Partial)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Moisture separator high level trip SPV on June 12, 2020 (2)
(Partial)
Remove RFP Start Interlock POS-2375 and POS-2376
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (8 Samples)
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
- (1) OPS-B2210, Perform V-EF-22 Reactor Building Main Exhaust Fan 480 VAC Supply PMT on April 2, 2020
- (6) RV-1523, P-160A Discharge Relief Valve PMT on April 17, 2020
- (8) P-202C - 13 RHR Pump PMT/RTS on June 9, 2020
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
(1)0032 [Emergency Core Cooling System] ECCS Pump Start Permissive Sensor Test on April 2, 2020
- (2) IC-PPS 0006 Scram Discharge Volume Hi Level Scram Tests on April 7, 2020 (3)1052-05 Diesel Fuel Transfer Pump Quarterly Pump and Valve Test on April 14, 2020
- (4) P-160A Diesel Fuel Transfer Pump Quarterly Pump and Valve Test on April 16, 2020
Inservice Testing (IP Section 03.01) (1 Sample)
- (1) MO2061 and MO2062 Torus to [High Pressure Coolant Injection] HPCI Suction Isolation Valves on March 23, 2020
RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)
- (1) B.04.01-05 H.4, Rise in Unidentified Leakage on June 19, 2020
FLEX Testing (IP Section 03.02) (1 Sample)
- (1) OSP-FIR-0611, G-507 Flex Portable Diesel Generator Test on April 23, 2020
71114.02 - Alert and Notification System Testing
Inspection Review (IP Section 02.01-02.04) (1 Sample)
- (1) The inspectors evaluated the following maintenance and testing of the alert and notification system:
- Annual siren inspection and maintenance records for the period from May 2018 to May 2020
- Monthly alert notification system (siren) tests for the period from May 2018 to May 2020
71114.03 - Emergency Response Organization Staffing and Augmentation System
Inspection Review (IP Section 02.01-02.02) (1 Sample)
- (1) The inspectors evaluated the readiness of the Emergency Preparedness Organization
71114.05 - Maintenance of Emergency Preparedness
Inspection Review (IP Section 02.01 - 02.11) (1 Sample)
- (1) The inspectors evaluated the maintenance of the Emergency Preparedness Program
71114.06 - Drill Evaluation
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)
The inspectors evaluated:
- (1) Emergency Plan Table-top Drill coordinating Emergency Operations Facility, Technical Support Center, and off-site organization on June 30,
RADIATION SAFETY
71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
Transportation
Waste Characterization and Classification (IP Section 03.03) (2 Samples)
- (1) The inspectors evaluated the licensees characterization and classification of radioactive waste shipment No. 20-32; Exclusive Use Shipment; UN-3321, LSA-II to UniTech Services, Oak Ridge, Tennessee.
- (2) The inspectors evaluated the licensees characterization and classification of radioactive waste shipment No. 19-76; Exclusive Use Shipment; UN-3321; LSA-II to Energy Solution Clive Facility, Clive, Utah.
Shipping Records (IP Section 03.05) (5 Samples)
The inspectors evaluated the following non-excepted radioactive material shipments through a record review:
- (1) Shipment No. 20-32; Exclusive Use Shipment; LSA-II, UN-3321, Dry Active Waste (DAW) Plant Trash to UniTech Services, Waste Processor, Oak Ridge, Tennessee
- (2) Shipment No. 19-77; Exclusive Use Shipment; LSA-II, UN-3321, Condensate Resin Liner to Energy Solution Clive Facility, Clive, Utah for Disposal
- (3) Shipment No. 19-75; Exclusive Use Shipment, LSA-II, UN-3321, Condensate Resin Liner to Energy Solution Clive Facility, Clive, Utah for Disposal
- (4) Shipment No. 19-55; Exclusive Use Shipment; SCO-II, UN-2913, Westinghouse Equipment to Westinghouse Facility, Madison, Pennsylvania
- (5) Shipment No. 19-74; Exclusive Use Shipment; LSA-II, UN-3321, Condensate Resin Liner to Energy Solution Clive Facility, Clive, Utah for Disposal
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (IP Section 02.12)===
- (1) Unit 1 (07/01/2019 - 03/31/2020)
EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)
- (1) Unit 1 (07/01/2019 - 03/31/2020)
EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)
- (1) Unit 1 (07/01/2019 - 03/31/2020)
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (1 Sample)
Safety System Functional Failures (SSFFs)
- (1) Unit 1 (April 2019 - March 2020)
BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (1 Sample)
- (1) Unit 1 (01/01/2019 -12/31/2019)
BI02: RCS Leak Rate Sample (IP Section 02.11) (1 Sample)
RCS Leak Rate Sample
- (1) Unit 1 (April 2019 - March 2020)
OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)
- (1) Unit 1 (01/01/2019 - 12/31/2019)
71152 - Problem Identification and Resolution
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Partial)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
(1)
(Partial)
FZ-08, Cable Spreading Room past Operability due to installation of heat detectors with incorrect setpoint
INSPECTION RESULTS
Unresolved Item (Open)
Partial Sample of FZ-08, Cable Spreading Room past operability due to installation of heat detectors with incorrect setpoint.
Description:
On March 5, 2020, the licensee identified that the set points for the cable spreading room fire detectors were incorrect. These detectors had been installed in 2018. The correct set point was 140 Fahrenheit (F), however, the licensee identified that the replaced detectors actually had a set point of 275 F. This would have resulted in a delayed response to a fire occurring in the room, potentially resulting in conditions outside the design basis analysis. The licensees preliminary investigation identified that the incorrect set point likely resulted from the wrong detectors being ordered from the supplier; however, this was still being confirmed through the investigation. Additionally, the licensee was still evaluating the actual impact to the design basis analysis. The inspectors were monitoring the licensees investigation including the actual risk impact. The licensee replaced the detectors with ones having the correct set point upon discovery and therefore the inspectors had no immediate safety concerns. This is considered a partial sample which is being continued in the third quarter.
Planned Closure Actions: This finding was determined to require further risk evaluation and this evaluation continues into the third quarter.
Licensee Actions: Cable Spreading Room (CSR) thermal detectors have been replaced with the correct setpoint detectors and an extent of conditions evaluation of other heat detectors has been performed.
Corrective Action References: 501000038446, Replaced CSR Thermal Detector Issue
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On July 7, 2020, the inspectors presented the integrated inspection results to Mr. T. Conboy, Site Vice President and other members of the licensee staff.
- On May 21, 2020, the inspectors presented the Emergency Preparedness Inspection results to Mr. T. Conboy, Site Vice President and other members of the licensee staff.
- On June 12, 2020, the inspectors presented the Radiation Protection Baseline Inspection results to Ms. M. Kelly, Director Site Performance and Operation Support and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
1444
Pre and Post Severe Weather Inspection Checklist
A.6
Acts of Nature
Drawings
NF-36298
Electrical Load Flow One-Line Diagram
117
NX-16162-1-4
ATWS Elementary Diagram
Procedures
B.08.01.02-05
Operations Manual EDG Emergency Service Water
C.5-3505
Venting Primary Containment
NH-116629
Hard Pipe Vent System P&ID
NH-36664
Service Water System & Make-Up Intake Structure P&ID
NH-36665
Service Water System and Make-Up Intake Structure P&ID
104
Work Orders
7000040127
Electric ATWS Inverter B
04/21/2020
Fire Plans
Fire Zone
Strategy A.3-17, Cable Run Area
Fire Zone 16
Strategy A.3-16, Turbine Building Corridor East & West
Elevations 911 & 931
Fire Zone 19-C
Strategy A.3-19-C, Feedwater Pipe Chase
Fire Zone 2B
Strategy A.3.02-B, East HCU Area
FZ-Strategy A.3-
Control Room
Procedures
1136
RHR Heat Exchanger Efficiency Test
Work Orders
7000040033
RHR Heat Exchanger Efficiency Test
03/28/2020
71111.11Q Corrective Action
Documents
501000027283
HCU Position Indication Blank
501000041586
Delay Obtaining Scram Data for 1st Card
Miscellaneous
0081
Control Rod Drive Scram Insertion Time Test
2300
Reactivity Maneuvering Steps
06/17/2020
Procedures
RQ-SS-181
MT Simulator Exercise, Cycle MT-LOR-20C-001V
Corrective Action
Documents
500001195628
4kV BKR PM Interval may Exceed 125% of 4
500001309389
RFP Could not be Restarted
500001535749
CV-1995 Failed to Open when Required
500001547508
CV-1995 did not Open on a Shutdown of 12
500001556822
MO-2012 Margin Improvement
500001558431
MO-2012 Failed to Open during OSP-ECC-05
500001559586
MO-2030 Stall Event not Accounted For
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
501000000863
4KVB-36 Main Secondary Contact Issue
501000001252
On 4KVB-36 - Closed Latch Spacer Missing
501000001705
Component Tagged for >70 Days
501000003335
Nonconserv Accept Criteria for RHR Hx Test
501000003461
MO-2012 Stroke Against High Differential
501000006230
4KVB-23 As-Found Reduced Volt Trip UNSAT
501000007176
Higher Ohms - Aux 4-4T Contact - 4KVB-24
501000007403
Question during Ops Deepdive
501000007485
4KVB-25 - Striker Plate Weld Cracked
501000007504
4KVB-24 Possible Interlock Roller Measure not SAT
501000007755
4KVB-25 Power Switch Resistance is High
501000008018
4KVB-25 Wire Strands Found Broken
501000008040
4KVB-24 Wire Strands Broken
501000008318
4KVB-31 - Half Voltage TRIO Test UNSAT
501000008340
4KVB-31 Driving Pawl Support Weld Crack
501000008732
4KVB-20 - MG Sec Disc Support Broken
501000008762
4KVB-20 Eccentric Roller Bearing UNSAT
501000009265
4KVB-20 Main Mechanism Cam Hub Cracked
501000009901
RHR Pump Motor Heater >550 Degrees Fahrenheit
501000011907
MO-2007 Failed to Close
501000013020
4KVB-19 As-Found Half Volt Testing UNSAT
501000013128
4KVB-19 Cracked Throat Baffle Found
501000013655
4KVB-30 'C' Arc Chute Buffer Bulk Cracked
501000013759
4KVB-30 As-Found 'A' Resistance High
501000013941
4KVB-32 Half Volt. Trip Test - UNSAT
501000014057
4KVB-32 Cam Set Screw Stripped
501000014186
4KVB-32 Charging MTR Mount Hole Stripped
501000014422
4KVB-32 Phase B Percent PF Test UNSAT
501000014461
4KVB-32 Closing Spring Mount Damaged
501000015314
4KVB-38 6 Lower Bushing Tested UNSAT
501000015383
4KVB-38 Lower Mechanism Found Misaligned
501000015743
4KVB-34 - All Primary Contacts Pitted
501000015847
4KVB-34 - Sec Pin MF-4 Support Cracked
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
501000018660
EDG Failed to Load
501000019162
4KVB-52 B-Ph Top Bushing Doble UNSAT
501000019413
4KVB-52 Charging Motor Bolt Found Stripped
501000019657
4KVB-52 MG Secondary Disc Block
501000019681
4KBV-52 Broken Secondary Contacts
501000020431
4KVB-40 Half Volt Close Test - UNSAT
501000022322
MO-2012 Closed Bases
501000022899
4KVB-46 Eccentric Bearing Found Bad
501000022930
4KVB-46 Interlock Switch 152/IS UNSAT
501000025884
MO-2007 Trace Anomaly and Overthrust
501000025970
4KVB-02 Acrid Odor from Charging Motor
501000026915
4KVB-28 Roll Up of Minor 4858-PM
501000027372
4858-PM 4KVB-17
501000028145
POD Question with MO-2012 Closed
501000028281
PM Work Order was Incorrectly Cancelled
501000028904
Breaker not Charging When Expected
501000029125
MO-2012 Packing Leak
501000029629
4KVB-29 Bushing 1 Failed Dielectric Test
501000029958
4KVB-29 Limit Switch Failure
501000029965
4KVB-01 Limit Switch Failure
501000030066
Containment Spray Valves Thrust Exceeds Calculation
501000030175
4KVB-01 4858 AUX Contact Failed As-Found
501000030213
4KVB-01 Inner Latching Pawl Worn
501000030390
4KVB-26 4858 Major Roll Up
501000030831
4KVB-47 4858 Roll Up
501000031409
Rectifier Bad Cool Water 4KV Test Station
501000035294
Breaker 4KVB-27 Secondary Contact Broken
501000036403
Latch Check Switch Presence in 4KV Breakers
501000037673
MOV JOG Program COF Basis Lacking
501000037819
MO-2009 As-Found Test Anomaly
501000037836
MO-2009 Disconnected Motor Lead
501000037853
MO-2009 Preconditioning
501000037854
Degraded Parts Found on MO-2009
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
501000037919
MOV Fatigue Life Cycling
Miscellaneous
Plant Health
Report
System Report - 4160-VAC Safety Related Sw. Gear
Plant Health
Report
System Report - Residual Heat Removal
Corrective Action
Documents
105000041208
Loss of 11 Cooling Tower Fans
501000041038
15B Feedwater Heater / C Moisture Separator Drain Tank
501000041194
LT-1004 Error Message
501000041202
LT Fault Indication Improvement
501000041205
Wiring Connection Issue with LT-1004
501000041364
RHR Pump in the Alert Range
501000041366
RHR Pump Vibration in the Alert Range
501000041456
Plant Health Committee Risk Assessment Learning
Opportunity
Miscellaneous
Cooling Tower Fans ODMI Type 1
06/02/2020
601000002422
Add Out of Band Alarm to MSDT Level Control
Maintenance Rule
Evaluation
LC-105 Transformer X50
06/08/2020
Work Orders
7000074991
X50 Transformer Test Cables N1N7-C-G
06/02/2020
700040746
RHR Motor Cooler Cleaning and Test
06/09/2020
700067587
RHR Pump and Motor Inspection
03/04/2020
700074888
Install Recorder on LC-1059 and IC-1058
05/28/2020
700074985
Replace LT-1004 Remote Head
06/02/2020
Corrective Action
Documents
501000037674
Substance Observed from DPIS-2-129C
501000038479,
'A' RHR Room Deep Dive - Tray Covers
501000039632
Weak Link Error
04/13/2020
501000040581
Unidentified Substance in DPIS-2-129C
501000041084
Anchor Bolt Issues - CRD System
Operability
Evaluations
Prompt
Operability
Determination
DPIS-2-129C
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
501000040581
Procedures94-142
Valve Thrust Assessment 10" Anchor Darling Gate Valves:
MO-2020, MO-2021, MO-2022, and MO-2023
Drawings
NH-36241
P&ID Nuclear Boiler System -Steam Supply
NH-36037
Engineering
Changes
601000000402
Remove RFP Start Interlock POS-2375 and POS-2376
Miscellaneous
GEK 17954
Remote and Automatic Tripping
October
1968
GEK-25425
Installation and Maintenance of Steam Separators
GEK25504E
Water Induction in Large Steam Turbines
E
GEK72223A
Water Detection Thermocouples
A
GEK72285a
Water Induction Operation and Testing
March 2004
Letter
General Electric Company from Bechtel Corporation -
Monticello Nuclear Generating Plant Unit 1, Northern States
Power, Job No. 5828, Feedwater Piping Design Pressure
10/31/1967
MPS-1100
Specification for the Analysis of Piping and Piping Support
Systems
SCR-18-0084
Removal of Feedwater Block Valve Pump Start Interlocks,
SI 5.01
Moisture Separator Drain System
May 1996
Work Orders
601000000402
Remove RFP Start Interlock POS-2375 and POS-2376
Work Orders
700008581
Emergency Diesel Generator (EDG) Return-to-Service
04/16/2020
700039966
Replace ESSB Speed Switch DG1/SSP1 PMT
04/16/2020
700040059
EDG Engine Control Panel 480V AC Supply PMT
04/16/2020
700040127
Electric ATWS Inverter B
04/21/2020
700040163
V-EF-22 - Reactor Building Main Exhaust Fan 480V AC
Supply PMT
04/02/2020
700040746
P-202C - 13 RHR Pump PMT/RTS
06/09/2020
700059828
04/16/2020
700065688
P-160A Discharge Relief Valve PMT
04/15/2020
Corrective Action
Documents
501000039095
Less-than-Adequate Extent-of-Condition Analysis on Quality
Issue Management 50100039095 In-Service Test Position
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Indication Tests
501000039984
Cart Caddy in Flex Building not Working
501000041646
Slight Rise Drywell Unidentified Leakage
Miscellaneous
Drywell Gamma Atmosphere Analysis
06/19/2020
Drywell Floor Drain Sump Gross Beta Analysis
06/19/2020
Letter from
Norther States
Power Company
to NRR
Supplemental Information Concerning Addendum No. 1 to
License Amendment Request dated October 10, 1980
09/23/1982
Procedures
B.04.01-05 H.4
Primary Containment Operation Manual - Rise in
Unidentified Drywell Leakage
Work Orders
700039966
1052-05 Diesel Generator Speed Sensing Test
04/16/2020
700065937
G-507 Flex 480V Portable Diesel Generator Testing
04/23/2020
700066488
Scram Discharge Volume High Level Scram Test and
Calibration Procedure
04/07/2020
700067245
EDG Diesel Oil Pump Quarterly/Comprehensive Test
04/16/2020
700067408
ECCS Pump Start Permissive Sensor Test
04/02/2020
700071906
HPCI Torus Suction Inboard Isolation/HPCI Torus Suction
Outboard Isolation IST Position Indication Test
03/25/2020
Corrective Action
Documents
501000014921
MT EP Self-Assessment ANS Roll-up
07/27/2018
501000017988
Siren S-36 Indicated AC PWR Failure
10/03/2018
501000019659
Unexpected Siren Test Results
11/07/2018
501000023770
Notified by Vendor Siren S-47 is OOS
03/02/2019
501000026619
05/01/2019
501000027460
ANS Siren S-47 (047) Possible Failure
05/15/2019
501000028193
ANS Siren S-2, S-9, W-2, W-54 Possible Failure
06/05/2019
501000035361
ANS Siren S-9 and W 58 Failure
2/04/2019
Miscellaneous
Public Alert Notification Systems (PANS) Monthly Activation
Test Records
05/01/2018 -
04/30/2020
Public Alert Notification Systems (PANS) Weekly Cancel
Signal Test Records
05/01/2018 -
04/30/2020
Procedures
Alert and Notification System Design Report
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
MNGP 1359
Public Alert Notification Systems (PANS) Weekly Cancel
Signal Test and Monthly Activation Test
MNGP 1408
Annual PANS Performance Review
Work Orders
700035884-0010
Semi-Annual Auto-Dialing Telephone Notification System
Testing and Maintenance Verification
08/31/2018
700036414-0010
2018 Annual PANS Performance Review
01/24/2019
700040631-0010
Semi-Annual Auto-Dialing Telephone Notification System
Testing and Maintenance Verification
03/19/2019
700047004-0010
Semi-Annual Auto-Dialing Telephone Notification System
Testing and Maintenance Verification
09/10/2019
0010
2019 Annual PANS Performance Review
01/15/2020
0010
Semi-Annual Auto-Dialing Telephone Notification System
Testing and Maintenance Verification
03/03/2020
Corrective Action
Documents
501000016257
EP Drill-All Call Response at EOF
08/29/2018
501000016257
EP Drill-All Call response at EOF
08/29/2018
501000030363
ERO-RP Positions for Drill
08/05/2019
501000031680
EP Exercise - NUE Pager Activation Issue
09/10/2019
501000035399
EP DRILL-Untimely ERO Activation
2/06/2019
501000039152
ERO Pagers not Activated by Callout System
03/26/2020
501000039383
ERO Staffing Level of REC Position
04/03/2020
Miscellaneous
ERO Staff Training and Qualification Records (Sample)
05/20/2020
ERO Augmentation Drill Records
05/01/2018 -
04/30/2020
Monticello Nuclear Generating Plant On-Shift Staffing
Analysis
5A
Procedures
A.2-001
Emergency Organization
A.2-106
Activation and Operation of the TSC
A.2-107
Activation and Operation of the OSC
A.2-111
Activation and Operation of the Alternative Facilities During
a Security Threat
A.2-802
Activation and Operation of the EOF
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
FL-BEP
Fleet Emergency Plan Training Program Description
MNGP 1317
Emergency Alert Notification System Test
MT-BEP
Monticello Emergency Plan Training Program Description
Corrective Action
Documents
501000016319
08/30/2018
501000016943
EOF Dose Projection PC (EITER)
09/14/2018
501000021985
Condition Evaluation - Staffing of Shift Emergency
Communicator
03/31/2019
501000023637
Dose Projection Software Issue
2/27/2019
501000029895
07/22/2019
501000030423
08/06/2019
501000030433
EP Drill - Exposure Authorization
08/06/2019
501000031659
09/10/2019
501000031692
EP DRILL: Offsite Communication Procedures
09/10/2019
501000031710
EP Drill - Rad Protection Surveys
09/10/2019
501000033445
10/16/2019
501000035142
NOS: Monticello Fire Department Training
11/26/2019
Corrective Action
Documents
Resulting from
Inspection
501000040846
EP Inspection NRC Comments/Observations
05/21/2020
Miscellaneous
2019 Monticello Emergency Planning Guide and Calendar
01/01/2019
20 Emergency Planning Guide Brochure
01/01/2020
EP Critique Report -19A Table-Top Series Report
04/04/2019
EP Critique Report - June 25, 2019 OSC Tabletop Drill
07/25/2019
EP Critique Report - 29 August 2018 Full Scale Drill
09/10/2018
EP Critique Report - August 6, 2019 EP Full Scale Drill
08/29/2019
EP Critique Report - September 10, 2019 EP Exercise Drill
10/10/2019
EP Critique Report - 2019 EP Medical Drill
11/04/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
EP Critique Report - 2018 EP Medical Drill
11/08/2018
EP Critique Report - 28 May 2019 HP Mini Drill
06/27/2019
Monticello 8 Year EP Drill / Exercise Cycle Table
05/20/2020
Off-Site Response Organization Letters of Agreement -
Current (LOAs / Memorandums of Understanding (MOUs)
A-EP-MNGP-
2018-1
MNGP NOS Emergency Preparedness Audit - 2018
05/14/2018
A-EP-MNGP-
2019-1
MNGP NOS Emergency Preparedness Audit - 2019
2/13/2019
KLD TR - 1040
Monticello Nuclear Generating Plant 2018 Population
Update Analysis
10/29/2019
KLD TR - 1121
Monticello Nuclear Generating Plant 2019 Population
Update Analysis
10/29/2019
KLD TR - 505
Monticello Nuclear Generating Plant Evacuation Time
Estimate
MT-BEP-NOT-
001L
Lesson Plan - Emergency Notifications
STP 1102
Emergency Equipment Inventory Records
04/30/2018-
03/31/2020
STP 1125
Emergency Procedures Monthly Contact Verification
Records
04/01/2018-
03/31/2020
STP 1230
Emergency Response Facility Instrumentation Functional
Test Records
04/01/2018-
03/31/2020
Procedures
Monticello Nuclear Generating Plant Emergency Plan
FP-EP-SURV-05
Requirements for Annual Independent Review of EP
Program
Miscellaneous
Emergency Plan Table-top DEP Drill Scenario
06/302020
Corrective Action
Documents
2000011898
Apparent Cause Evaluation Concerning Radioactive
Shipment
CAP No.
501000041066
Radioactive Shipping Issue Concerning Waste Manifest
Form-541
05/27/2020
Miscellaneous
NSTS-2020
Verification/Validation Package Annual NSTS Inventory
Reconciliation 2020 Monticello Nuclear Generating Plant
01/09/2020
Procedures
R. 11.04
Waste Classification
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Shipping Records No. 19-55
Westinghouse Equipment to Westinghouse Facility
05/23/2019
No. 19-74
Condensate Resin Liner to Clive, Utah Facility
08/16/2019
No. 19-75
Condensate Resin Liner to Clive, Utah Facility
08/23/2019
No. 19-76
Resin Liner to Clive, Utah Facility
08/29/2019
No. 19-77
Resin Liner to Clive, Utah Facility
09/06/2019
No. 19-85
Plant Trash to UniTech, Oak Ridge, TN
09/20/2019
No. 20-18
Plant Laundry UN2912 to UniTech, Morris, IL
03/17/2020
No. 20-32
Scrap Metal Process to UniTech, Oak Ridge, TN
05/26/2020
71151
Miscellaneous
NRC Performance Indicator Data; Emergency Preparedness
- ERO Readiness
07/01/2019 -
03/31/2020
NRC Performance Indicator Data; Emergency Preparedness
- Alert and Notification System
07/01/2019 -
03/31/2020
MSPI Basis Document
Trend Date for the Period April 2019 - March 2020
NRC Performance Indicator Data; Emergency Preparedness
- Drill/Exercise Performance
07/01/2019 -
03/31/2020
QF-0445 (Rev.
14)
NRC/INPO/WANO Data Collection and Submittal Form Fuel
Performance (BWR)
01/01/2019-
2/31/2019
QF-0445 (Rev.
14)
NRC/INPO/WANO Data Collection and Submittal Form
Radiological Protection
01/01/2019-
2/31/2019