Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information
ML21215A217
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/03/2021
From: Jim Nance
NRC/RGN-III/DRS/OLB
To: Conboy T
Northern States Power Company, Minnesota
Nance J
References
Download: ML21215A217 (5)


Text

August 3, 2021 Mr. Thomas Conboy Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Conboy:

In a conversation on August 2, 2021, between Mr. J. Nance, Operations Engineer, the NRC lead inspector for this inspection, and Mr. R. Becker, NRC Exam Developer, Mr. D. Cox, Training Supervisor Operations, and other members of your staff, final arrangements were made for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Monticello Nuclear Generating Plant. The inspection is planned for the week of October 4, 2021, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with Title 10 of the Code of Federal Regulations, Part 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. To assist in minimizing the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection.

Please furnish the items listed in the first group of the attached enclosure, needed to support the in-office inspection activities, to the NRC by September 24, 2021. Please have the items listed in the second group of the attached enclosure available for the inspectors during the onsite portion of the inspection activities. Mr. Cox and Mr. Becker have been advised of this request.

Thank you for your cooperation in this matter. If there are any questions regarding either the inspection, or the material requested in the enclosure, please contact me at 630-829-9678 or via e-mail at James.Nance@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.

T. Conboy This letter and its enclosure will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Nance, James on 08/03/21 James C. Nance, Operations Engineer Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22

Enclosure:

Requested Information to Support Licensed Operator Requalification Program and Licensed Operator Performance Inspection (IP 71111.11) cc: Distribution via LISTSERV P. Albares, Training Manager

T. Conboy Letter to Thomas Conboy from James C. Nance dated August 3, 2021.

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:

Jessie Quichocho Aaron McCraw RidsNrrDorlLpl3 RidsNrrPMMonticello RidsNrrDroIrib Resource John Giessner Mohammed Shuaibi Jamnes Cameron Allan Barker DRPIII DRSIII Ikeda Betts Colleen Schmidt ADAMS Accession Number: ML21215A217 OFFICE RIII/DRS/OB NAME JNance:jw DATE 08/03/21 OFFICIAL RECORD COPY

REQUESTED INFORMATION TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION (IP 71111.11)

Please provide the following information on a CD/DVD, or document upload to the BOX if possible, by September 24, 2021.

1. One complete version of a biennial requalification written examination administered during the training cycle.
2. Ten (10) job performance measures (JPMs) and four (4) simulator scenarios associated with an annual requalification operating test required by Title 10 of the Code of Federal Regulations, Part 55.59(a)(2). The JPMs and scenarios to be reviewed should include those that will be observed during the onsite portion of this inspection, with any remaining JPMs and scenarios selected from other weeks within the same training cycle.
3. Complete versions of the reference materials used to develop the administered written examinations and operating tests. (Refer to ES-201 Attachment 3, Reference Material Guidelines for Initial Licensing Examinations, for additional examples and clarification.).
4. A list (or lists) of licensee-identified issues associated with licensed operator errors or other licensed operator performance problems which have occurred in the actual plant/

main control room since the last biennial requalification program, their associated corrective actions, and if these issues were incorporated into requalification training.

(These issues are likely documented in condition/problem identification reports, licensee conducted audits and assessments, and in industry operating experience reports, etc.).

5. Facility licensee procedures for licensed operator requalification training and examination, including examination security procedures.
6. A schedule of the licensees examination activities during the on-site inspection week.

Please have the following information available for U.S. Nuclear Regulatory Commission review on October 4, 2021.

1. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios.
2. Licensed operator pass/fail statistics for any U.S. Nuclear Regulatory Commission-required requalification examinations that have been completed.
3. An overall schedule of the facility licensees requalification program since the last biennial inspection (cycle weeks, training topics, etc.).
4. A list and descriptions of any examination security problems since the last biennial inspection (likely documented in training department condition/problem identification reports).
5. Records for licensed operator requalification training attendance, licensed operator performance in requalification, licensed operator remedial training, individual licensed operator medical records, and records for maintaining an active license and license re-activation.

Enclosure

6. Simulator testing, maintenance, modification, and performance records.

Simulator corrective action records, including lists of open/closed simulator deficiencies, and corrective actions taken.