Letter Sequence Request |
---|
EPID:L-2022-LLA-0041, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency (Approved, Closed) |
|
|
|
---|
Category:Letter type:L
MONTHYEARL-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report2023-05-10010 May 2023 Submittal of 2022 Annual Radioactive Effluent Release Report L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 322023-05-0202 May 2023 Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2023-04-18018 April 2023 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 22023-03-17017 March 2023 Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003)2023-02-0707 February 2023 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program2023-01-23023 January 2023 CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088)2023-01-0606 January 2023 Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) L-MT-22-049, Industry Groundwater Protection Initiative Special Report2022-12-15015 December 2022 Industry Groundwater Protection Initiative Special Report L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative2022-12-15015 December 2022 L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462022-12-13013 December 2022 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-22-048, Update to the Monticello Technical Specification Bases2022-11-28028 November 2022 Update to the Monticello Technical Specification Bases L-MT-22-047, Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-11-10010 November 2022 Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package L-MT-22-030, Sixth Interval Inservice Testing (1ST) Plan2022-09-0606 September 2022 Sixth Interval Inservice Testing (1ST) Plan L-MT-22-037, Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-08-29029 August 2022 Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-22-007, Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007)2022-07-22022 July 2022 Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007) L-MT-22-026, Changes to the Emergency Plan2022-07-19019 July 2022 Changes to the Emergency Plan L-MT-22-024, Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies2022-06-0606 June 2022 Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies L-MT-22-022, Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-05-25025 May 2022 Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-22-017, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report L-MT-22-018, 2021 Annual Radioactive Effluent Release Report2022-05-11011 May 2022 2021 Annual Radioactive Effluent Release Report L-MT-22-016, 2021 Annual Report of Individual Monitoring2022-04-28028 April 2022 2021 Annual Report of Individual Monitoring L-MT-22-019, Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-04-18018 April 2022 Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency2022-03-18018 March 2022 License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency L-MT-22-012, Special Report for the Bypass of the Offgas Treatment Storage System2022-03-15015 March 2022 Special Report for the Bypass of the Offgas Treatment Storage System L-MT-22-008, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008)2022-03-0707 March 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008) L-MT-22-006, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006)2022-02-18018 February 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006) 2024-01-11
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 ML23009A3542023-01-0909 January 2023 Subsequent License Renewal Application Sections 1 - 4 and Appendices a - D L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency2022-03-18018 March 2022 License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency L-MT-21-072, License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank2021-12-13013 December 2021 License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank L-MT-21-067, Update to the Monticello Technical Specification Bases2021-11-29029 November 2021 Update to the Monticello Technical Specification Bases ML21320A2262021-11-15015 November 2021 License Amendment Request: Standard Emergency Plan and Consolidated Emergency Operations Facility for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant L-MT-21-043, Supplement to License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-06-30030 June 2021 Supplement to License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-MT-20-023, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2020-11-0303 November 2020 License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR L-MT-20-018, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-22022 September 2020 License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements L-MT-20-003, License Amendment Request: Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b2020-03-30030 March 2020 License Amendment Request: Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b ML20058F9432020-02-27027 February 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - License Amendment Request: Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules Revision 4 L-MT-18-073, Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee...2018-11-20020 November 2018 Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee... L-MT-18-009, License Amendment Request: Revise Limiting Condition for Operation (LCO) of Specification 3.5.1, Emergency Core Cooling System - Operating, to Remove the LCO Note2018-11-12012 November 2018 License Amendment Request: Revise Limiting Condition for Operation (LCO) of Specification 3.5.1, Emergency Core Cooling System - Operating, to Remove the LCO Note L-MT-18-060, License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.12018-11-12012 November 2018 License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.1 L-MT-18-051, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control,2018-09-11011 September 2018 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, L-MT-18-006, Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements2018-07-0303 July 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements L-MT-18-020, Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Control2018-04-24024 April 2018 Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Control L-MT-18-010, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2018-03-28028 March 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-MT-17-083, License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2017-12-19019 December 2017 License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program L-MT-17-058, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-10-20020 October 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML17095A1142017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 2 of 5 ML17095A1202017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 5 of 5 ML17090A2012017-03-31031 March 2017 License Amendment Request to Revise Technical Specification for Plant/Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML17095A1152017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 3 of 5 ML17095A1132017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 1 of 5 ML17095A1182017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 4 of 5 ML17095A1122017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attach. 1, EAL Comparison Matrix Document (Deviations & Differences) and Attachments 2 & 3, Red-Line & Clean Versions of EAL Technical Bases Document L-MT-16-031, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code2016-07-28028 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code L-MT-16-014, License Amendment Request: Revise Battery Charger Surveillance Requirement 3.8.4.22016-04-0404 April 2016 License Amendment Request: Revise Battery Charger Surveillance Requirement 3.8.4.2 ML16047A2722016-02-10010 February 2016 License Amendment Request: Revise Technical Specification 5.5.11 to Provide a Permanent Extension of the Integrated Leakage Rate (Type a) Test Frequency from Ten to Fifteen Years L-MT-15-032, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure2015-09-0202 September 2015 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure L-MT-15-048, License Amendment Request: Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-07-15015 July 2015 License Amendment Request: Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process L-MT-14-043, License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification2014-05-30030 May 2014 License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification ML14126A7272014-05-0505 May 2014 Supplement to License Amendment Request (LAR) for Cyber Security Plan Implementation Date Extension L-MT-14-009, License Amendment Request: Revision to Required Actions for Technical Specification 3.5.1, Emergency Core Cooling System (ECCS)2014-04-0404 April 2014 License Amendment Request: Revision to Required Actions for Technical Specification 3.5.1, Emergency Core Cooling System (ECCS) ML14072A3902014-03-13013 March 2014 License Amendment Request for Fuel Storage Changes, Supplement to Propose a Spent Fuel Pool Boral Monitoring Program Technical Specification ML13333B6742013-11-27027 November 2013 License Amendment Request (LAR) for Northern States Power Company, Minnesota (NSPM) Cyber Security Plan Implementation Date Extension L-MT-13-081, Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses2013-08-14014 August 2013 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses L-MT-13-055, License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology2013-07-15015 July 2013 License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology L-MT-13-046, License Amendment Request for Fuel Storage Changes, Supplement to Respond to NRC Staff Requests for Additional Information2013-05-16016 May 2013 License Amendment Request for Fuel Storage Changes, Supplement to Respond to NRC Staff Requests for Additional Information L-MT-13-030, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs2013-04-19019 April 2013 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs L-MT-13-010, License Amendment Request: Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits2013-03-11011 March 2013 License Amendment Request: Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits L-MT-12-102, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month.2013-01-0404 January 2013 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month. L-MT-12-078, License Amendment Request: Modification to the MNGP Emergency Plan Concerning a Revision to the Emergency Action Level Setpoint for the Turbine Building Normal Waste Sump Monitor2012-12-21021 December 2012 License Amendment Request: Modification to the MNGP Emergency Plan Concerning a Revision to the Emergency Action Level Setpoint for the Turbine Building Normal Waste Sump Monitor 2024-01-11
[Table view] Category:Technical Specification
MONTHYEARL-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-22-048, Update to the Monticello Technical Specification Bases2022-11-28028 November 2022 Update to the Monticello Technical Specification Bases L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency2022-03-18018 March 2022 License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency L-MT-21-067, Update to the Monticello Technical Specification Bases2021-11-29029 November 2021 Update to the Monticello Technical Specification Bases L-MT-20-043, Update to the Monticello Technical Specification Bases2020-11-24024 November 2020 Update to the Monticello Technical Specification Bases L-MT-20-023, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2020-11-0303 November 2020 License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR L-MT-19-049, Technical Specification Bases2019-11-0808 November 2019 Technical Specification Bases ML18324A6792018-11-16016 November 2018 Update to the Monticello Technical Specification Bases L-MT-17-083, License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2017-12-19019 December 2017 License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program L-MT-16-064, Update to Technical Requirements Manual and Technical Specification Bases2016-11-21021 November 2016 Update to Technical Requirements Manual and Technical Specification Bases ML16047A2722016-02-10010 February 2016 License Amendment Request: Revise Technical Specification 5.5.11 to Provide a Permanent Extension of the Integrated Leakage Rate (Type a) Test Frequency from Ten to Fifteen Years ML15335A5082015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 34 ML15335A5072015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 33 ML15335A5062015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 32 ML15335A5052015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 31 ML15335A5042015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 30 ML15335A4942015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Revision 39 ML15335A5092015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 35 ML15335A5102015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 36 ML15335A5112015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 37 ML15335A5122015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 38 L-MT-15-088, Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 392015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 39 ML15275A0392015-10-0202 October 2015 Revision 38 to Technical Specification Bases ML15275A0382015-10-0202 October 2015 Revision 17 to Technical Requirements Manual Specifications and Bases ML15275A0402015-10-0202 October 2015 Revision 37 to Technical Specification Bases ML15135A2242015-05-12012 May 2015 Technical Specification Bases L-MT-13-041, License Amendment Request: Revision of Technical Specification 5.5.11 for Drywell Personnel Airlock Leakage Rate Testing2013-11-14014 November 2013 License Amendment Request: Revision of Technical Specification 5.5.11 for Drywell Personnel Airlock Leakage Rate Testing ML13261A1462013-09-12012 September 2013 MNGP Technical Specification Bases Updating Instructions ML13233A0962013-08-16016 August 2013 MNGP ISFSI Amendment 10 to Technical Specifications L-MT-12-077, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities2012-12-0606 December 2012 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities ML12083A2512012-03-22022 March 2012 Enclosure 1 - Monticello Nuclear Generating Plant Technical Specification Bases Revision 19 ML12033A1762011-09-0808 September 2011 License Amendment Request Revise the Technical Specifications to Include a Pressure Temperature Limits Report Pressure and Temperature Limits Report, Enclosure 4 ML11129A2392011-04-27027 April 2011 001 Monticello - Technical Specification Bases, Revision 16 ML1008405682010-02-18018 February 2010 Monticello - Technical Specification Bases Revision ML1002805582010-01-21021 January 2010 Monticello - License Amendment Request: Maximum Extended Load Line Limit Analysis Plus ML0914101202009-05-13013 May 2009 Monticello - Extended Power Uprate: Response to NRC Instrumentation & Controls Branch Request for Additional Information Dated March 11, 2009, and April 6, 2009, and Fire Protection Branch RAIs Dated March 12, 2009 ML0910506192009-04-15015 April 2009 License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0902910452009-01-28028 January 2009 Monticello Nuclear Generating Plant Technical Specification Bases L-MT-08-034, License Amendment Request: Revision to Required Actions for Specification 3.5.1, Emergency Core Cooling System2008-06-26026 June 2008 License Amendment Request: Revision to Required Actions for Specification 3.5.1, Emergency Core Cooling System L-MT-08-025, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2008-04-0303 April 2008 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0805905412008-02-21021 February 2008 Issuance of Amendment Request to Revise Technical Specification Surveillance Requirements 3.5.1.3 to Correct the Alternate Nitrogen System Pressure (Tac MD4292) L-MT-07-036, License Amendment Request, Remove Table of Contents from Technical Specifications2007-07-0909 July 2007 License Amendment Request, Remove Table of Contents from Technical Specifications L-MT-07-009, License Amendment Request: Revision to the Allowable Values and Surveillance Intervals for the Low Pressure Coolant Injection Loop Select Logic Time Delay Relays2007-01-29029 January 2007 License Amendment Request: Revision to the Allowable Values and Surveillance Intervals for the Low Pressure Coolant Injection Loop Select Logic Time Delay Relays L-MT-06-054, Supplemental Submittal Regarding Full Scope Application of an Alternative Source Term (AST)2006-08-21021 August 2006 Supplemental Submittal Regarding Full Scope Application of an Alternative Source Term (AST) L-MT-04-047, Technical Specification Bases Change 138a2004-07-26026 July 2004 Technical Specification Bases Change 138a ML0411806122004-05-21021 May 2004 Issuance of Amendment Re. Elimination of Requirements for Hydrogen Recombiners and Hydrogen and Oxygen Monitors ML0404204242004-01-30030 January 2004 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process L-MT-03-085, Technical Specification Bases Pages Changes2003-11-11011 November 2003 Technical Specification Bases Pages Changes ML0319802752003-08-21021 August 2003 License Amendment, Revise Drywell Leakage and Sump Monitoring Detection Section of the Current Plant Technical Specification 2023-11-28
[Table view] Category:Bases Change
MONTHYEARL-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-22-048, Update to the Monticello Technical Specification Bases2022-11-28028 November 2022 Update to the Monticello Technical Specification Bases L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency2022-03-18018 March 2022 License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency L-MT-21-067, Update to the Monticello Technical Specification Bases2021-11-29029 November 2021 Update to the Monticello Technical Specification Bases L-MT-20-043, Update to the Monticello Technical Specification Bases2020-11-24024 November 2020 Update to the Monticello Technical Specification Bases L-MT-19-049, Technical Specification Bases2019-11-0808 November 2019 Technical Specification Bases ML18324A6792018-11-16016 November 2018 Update to the Monticello Technical Specification Bases L-MT-16-064, Update to Technical Requirements Manual and Technical Specification Bases2016-11-21021 November 2016 Update to Technical Requirements Manual and Technical Specification Bases ML16047A2722016-02-10010 February 2016 License Amendment Request: Revise Technical Specification 5.5.11 to Provide a Permanent Extension of the Integrated Leakage Rate (Type a) Test Frequency from Ten to Fifteen Years ML15335A5062015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 32 L-MT-15-088, Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 392015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 39 ML15335A5122015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 38 ML15335A5112015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 37 ML15335A5102015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 36 ML15335A5092015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 35 ML15335A5082015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 34 ML15335A5072015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 33 ML15335A5052015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 31 ML15335A5042015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Affected Pages, Revision 30 ML15335A4942015-11-20020 November 2015 Technical Requirements Manual, Technical Specification Bases, Revision 39 ML15275A0402015-10-0202 October 2015 Revision 37 to Technical Specification Bases ML15275A0392015-10-0202 October 2015 Revision 38 to Technical Specification Bases ML15275A0382015-10-0202 October 2015 Revision 17 to Technical Requirements Manual Specifications and Bases ML15135A2242015-05-12012 May 2015 Technical Specification Bases ML13261A1462013-09-12012 September 2013 MNGP Technical Specification Bases Updating Instructions L-MT-12-077, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities2012-12-0606 December 2012 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities ML12083A2512012-03-22022 March 2012 Enclosure 1 - Monticello Nuclear Generating Plant Technical Specification Bases Revision 19 ML11129A2392011-04-27027 April 2011 001 Monticello - Technical Specification Bases, Revision 16 ML1008405682010-02-18018 February 2010 Monticello - Technical Specification Bases Revision ML0902910452009-01-28028 January 2009 Monticello Nuclear Generating Plant Technical Specification Bases L-MT-08-034, License Amendment Request: Revision to Required Actions for Specification 3.5.1, Emergency Core Cooling System2008-06-26026 June 2008 License Amendment Request: Revision to Required Actions for Specification 3.5.1, Emergency Core Cooling System L-MT-08-025, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2008-04-0303 April 2008 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process L-MT-06-054, Supplemental Submittal Regarding Full Scope Application of an Alternative Source Term (AST)2006-08-21021 August 2006 Supplemental Submittal Regarding Full Scope Application of an Alternative Source Term (AST) L-MT-04-047, Technical Specification Bases Change 138a2004-07-26026 July 2004 Technical Specification Bases Change 138a L-MT-03-085, Technical Specification Bases Pages Changes2003-11-11011 November 2003 Technical Specification Bases Pages Changes L-MT-03-039, Revised Monticello Nuclear Generating Plant Technical Specifications Bases Pages2003-05-22022 May 2003 Revised Monticello Nuclear Generating Plant Technical Specifications Bases Pages ML0300304802002-12-19019 December 2002 Technical Specification Bases Pages ML0227504352002-09-19019 September 2002 Technical Specification Bases Pages ML0222004242002-07-29029 July 2002 Technical Specification Bases Change 128a Correct Drywell to Suppression Chamber Vaccum Breaker Indicating Light Description ML0206502132002-02-18018 February 2002 Technical Specification Bases Page 196 2023-11-28
[Table view] |
Text
fl Xcel Energy 2807 West County Road 75 Monticello, MN 55362 March 18, 2022 L-MT-22-010 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency In accordance with the provisions of 10 CFR 50.90, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM") , hereby requests a revision to the Technical Specifications (TS) for the Monticello Nuclear Generating Plant (MNGP). The proposed change would modify the frequency of TS Surveillance Requirement (SR) 3.6 .1.8.2 for drywell spray nozzles to an event-based frequency , specifically, change the frequency from "10 years" to "Following maintenance that could result in nozzle blockage".
The Enclosure provides NS PM's evaluation of the proposed change. Attachment 1 to the Enclosure provides marked-up existing MNGP TS pages. Attachment 2 to the Enclosure provides the existing MNGP TS pages retyped. Attachment 3 to the Enclosure provides existing TS Bases pages marked up to show the proposed changes, which are provided for information only.
NSPM has evaluated the proposed changes in this License Amendment Request in accordance with 10 CFR 50 .92 and concluded that they involve no significant hazards consideration. In accordance with 10 CFR 50.91 (b)(1 ), "Notice for Public Comment; State Consultation," a copy of this application , with attachments, is being provided to the designated Minnesota Official.
NSPM requests approval of the proposed license amendment by March 31, 2023, with an implementation period of 30 days. An airflow test is scheduled to be performed during the 2023 RFO 31 refueling outage to comply with the current TS SR 3.6.1 .8.2 frequency.
If there are any questions or if additional information is required, please contact Mr. Ron Jacobson at (612) 330-6542 or ronald .g .jacobson@xcelenergy.com.
Document Control Desk Page 2 Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
I declare under penalty of perjury, that the foregoing is true and correct.
Exe~ a _-f:::*~2 0~2~2~-- - - -
3 Christopher P. Domingos Site Vice President, Monticello and Prairie Island Nuclear Generating Plants Northern States Power Company - Minnesota Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC State of Minnesota
- ENCLOSURE MONTICELLO NUCLEAR GENERATING PLANT EVALUATION OF PROPOSED CHANGE License Amendment Request Revise Technical Specification 3.6.1 .8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency 1.0
SUMMARY
DESCRIPTION 2.0 DETAILED DESCRIPTION 2.1 System Design and Operation 2.2 Current Technical Specifications Requirements 2.2 Reason for Proposed Change 2.3 Description of the Proposed Change
3.0 TECHNICAL EVALUATION
4.0 REGULATORY ANALYSIS
4.1 Applicable Regulatory Requirements/ Criteria 4.2 Precedent 4.3 No Significant Hazards Consideration Determination 4.4 Conclusions
5.0 ENVIRONMENTAL CONSIDERATION
6.0 REFERENCES
ATTACHMENTS:
- 1. Technical Specification Pages (Marked Up)
- 2. Technical Specification Pages (Retyped)
- 3. Technical Specification Bases Pages (Marked Up, For Information Only)
L-MT-22-010 NSPM Enclosure License Amendment Request Revise Technical Specification 3.6.1.8 Res idual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency 1.0
SUMMARY
DESCRIPTION In accordance with the provisions of 10 CFR 50.90, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), hereby requests a revision to the Technical Specifications (TS) for the Monticello Nuclear Generating Plant (MNGP). The proposed change would modify the frequency of TS Surveillance Requirement (SR) 3.6.1 .8.2 for drywell spray nozzles to an event-based frequency, specifically, change the frequency from "10 years" to "Following maintenance that could result in nozzle blockage" .
2.0 DETAILED DESCRIPTION 2.1 System Design and Operation The primary containment system, which employs a pressure suppression containment system (constructed of steel), houses the reactor primary vessel, the reactor coolant recirculation system loops, and other branch connections of the reactor primary system.
The system consists of a drywell , a pressure suppression chamber (wetwell) that stores a large volume of water, a connecting vent system between the drywell and the chamber water pool, isolation valves, ventilating and cooling systems, and other service equipment.
In the event of a process system piping failure within the drywell, reactor water and steam would be released into the drywell air space . The resulting increased drywell pressure then forces a mixture of non-condensable gases, steam, and water through the vents into the pool of stored water in the suppression chamber. The steam condenses rapidly and completely in the suppression pool, resulting in rapid pressure reduction in the drywell.
Following a design basis accident (OBA), the RHR drywell spray system condenses any steam that may exist in the drywell thereby lowering drywell pressure and temperature.
The RHR drywell spray mode of operation is not credited in the OBA loss of coolant accident (LOCA); however, it is credited for the evaluation of steam line breaks inside the drywell. For these events, the RHR drywell spray system will ensure that the drywell air temperature is within the peak drywell air temperature limit of 338°F specified for the drywell temperature envelope for equipment qualification and will also ensure that the drywell wall temperature is within the design limit of 281 °F.
Page 2 of 12
L-MT-22-010 NSPM Enclosure Each of the two RHR drywell spray subsystems contains two pumps and one heat exchanger, which are manually initiated and independently controlled. The two subsystems perform the drywell spray function by circulating water from the suppression pool through the RHR heat exchangers and returning most of it to the associated drywell spray header. RHR service water, circulating through the tube side of the heat exchangers, exchanges heat with the suppression pool water and discharges this heat to the ultimate heat sink. Either RHR drywell spray subsystem is sufficient to condense the steam that may exist in the drywell during the postulated OBA.
The MNGP design includes keeping the section of piping between the two drywell spray isolation valves voided (part of containment spray function). The emergency operating procedures that manually initiate containment spray direct the RHR pump(s) to be started, the outboard valve opened, then the inboard valve opened.
In the event of a OBA, a minimum of one RHR drywell spray subsystem is required to mitigate the consequences of steam line breaks in the drywell and maintain the primary containment peak temperature below the design limits. To ensure that these requirements are met, two RHR drywell spray subsystems must be OPERABLE with power from two safety related independent power supplies.
2.2 Current Technical Specifications Requirements 3.6.1.8 Residual Heat Removal (RHR) Orywell Spray SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.8.2 Verify each drywell spray header and nozzle is 10 years unobstructed .
2.3 Reason for Proposed Change The proposed change will eliminate unnecessary testing of the spray nozzles. The design of the RHR drywell spray system and cleanliness controls used during maintenance activities ensure that line or nozzle blockage is unlikely. Performance of SR 3.6.1.8.2 at the current frequency has the potential to result in unwarranted occupational radiation exposure and increased outage costs without a commensurate increase in system reliability or performance. Testing would be performed based on activities or conditions that could potentially cause nozzle blockage.
Industry experience has shown that nozzle blockage is unlikely since the nozzles are a passive design and the system is kept in a normally dry state. The proposed frequency Page 3 of 12
L-MT-22-010 NSPM Enclosure will continue to provide confidence that an unobstructed flow path is available and will preclude the need for unnecessary testing when no activities have occurred that would introduce debris into the headers and no active degradation mechanism is present.
Performance of the air flow test presents a personnel safety risk for the individual(s) required to access the upper portions of the drywell to check the nozzle air flow . Testing at the proposed frequency would reduce outage dose and improve personnel safety.
2.4 Description of the Proposed Change The proposed license amendment would revise the surveillance frequency for testing the drywell spray nozzles. Specifically, TS SR 3.6.1.8.2 frequency would be changed from "10 years" to "Following maintenance that could result in nozzle blockage". to the Enclosure provides marked -up existing MNGP TS pages. to the Enclosure provides the existing MNGP TS pages retyped. to the Enclosure provides existing TS Bases pages marked up to show the proposed changes, which are provided for information only and will be processed in accordance with the MNGP Technical Specifications Bases Control Program (TS Section 5.5.9) .
3.0 TECHNICAL EVALUATION
3.1 System Description The 1-1/2" diameter MNGP drywell spray nozzles were manufactured by Spraying Systems Co. Type 7G FOG JET NO. 1 1/2-?G 40, and have multiple holes for spray.
The upper spray header contains 105 brass spray nozzles and the lower spray header contains 104 spray nozzles. Spray header piping and fittings are carbon steel.
The drywell spray system is normally kept dry, isolated from the RHR system by two motor-operated isolation valves in series in each loop, located outside of the drywell.
The Foreign Material Exclusion and Control (FME) program, developed using industry guidance and operating experience documents, is in place to prevent the introduction of foreign material into the drywell spray system. When maintenance or repairs are performed on the drywell spray system or on other connected systems that could result in obstruction of the spray nozzles, the FME program ensures that system cleanliness is maintained. Program procedures include criteria for establishing FME areas, steps to take if FME control is lost, and guidance for foreign material retrieval. FME areas are clearly marked and material accountability is assured through logs and securing of loose items and tools. FME barriers and covers are used except when performing necessary operations. The FME controls require post maintenance verification of system cleanliness and freedom from foreign materials .
Page 4 of 12
L-MT-22-010 NSPM Enclosure Depending on the activity, work planning and preparation may be performed at various times, such as during the maintenance work management process, during procedure writing, during modification design, or as part of preparation for a pre-job briefing. In each case, the planning phase identifies how different activities, components, systems ,
and areas of the plant may be affected by different types of foreign material and, therefore, what FME controls are required.
If any material is unaccounted for in an FME area or a general FME concern is observed, a condition report is initiated in the corrective action program which would provide for a determination of the scope of the issue, the actions necessary to return the area to the required level of cleanliness, and whether testing is necessary. Should it be determined that an activity or event could have resulted in the potential for nozzle blockage, various methods could be used to perform the surveillance (e.g., an air flow test or visual inspections of nozzle and piping interiors.) The appropriate method used to complete the surveillance would be determined based on an analysis of the potential foreign material and its location. A visual inspection (e.g., borescope) of the nozzles or piping could be used in lieu of an air test if a visual inspection is determined to provide an equivalent or more effective post-maintenance test. A visual inspection may be more effective if the potential for material intrusion is localized and the affected area is accessible.
3.2 Basis for Proposed Change Nozzle blockage is considered unlikely since the nozzles are of a passive design and the system is kept in a normally dry state. The proposed frequency will continue to provide confidence that an unobstructed flow path is available and will preclude the need for unnecessary testing when no activities have occurred that would introduce debris to the headers or when no other active degradation mechanism is present.
Previous testing has verified that the nozzles are not blocked. Air flow testing and visual inspections of the MNGP drywell spray nozzles were performed in 1980, 1984, 1989, 2001, and 2013 . If conditions were favorable for corrosion to form, it is expected that some nozzle blockage or abnormalities would have been discovered . No nozzle blockage nor other abnormalities were identified by these tests.
The current FME program requires that any breaches of system boundaries during maintenance activities be appropriately protected from the intrusion of foreign material.
The FME program provides guidelines that establish cleanliness requirements and accounting of material, tools , and parts to preclude the introduction of foreign materials into systems or components during maintenance, modification, test, or inspection activities. The program demands the highest level of controls for safety related systems such as the containment spray system. The program requires supervision and management involvement if FME integrity is lost or could not be assured and that a condition report be written if an item cannot be found or retrieved. These controls are sufficient to ensure that material is not inadvertently introduced.
Page 5 of 12
L-MT-22-010 NSPM Enclosure A review of the maintenance history since the last (2013) MNGP surveillance test to date indicates no maintenance has been performed on the drywell spray piping or nozzles. Maintenance on other portions of the RHR system which connect to the drywell spray portion of the system has included routine periodic activities . Cleanliness control practices, including post work inspections, were used and documented in the work orders to ensure cleanliness requirements were maintained. FME control has not been lost for these activities. One instance of corrective maintenance was conducted on the internals of MO-2020, one of the two RHR outboard drywell spray isolation valves : in 2021 the valve disc and stem were replaced. FME control was maintained. Additionally, the drywell spray nozzles are located high in containment with nozzles orifices oriented in the downward direction and thus are not subject to foreign material entry.
Normal plant operation and maintenance practices at MNGP are not expected to trigger the surveillance requirement as proposed . Only an unanticipated circumstance would initiate this surveillance, such as an inadvertent spray actuation, a major configuration change, or a loss of foreign material control when working within the affected boundary of the system . MNGP procedures will require performance of an evaluation to determine whether a containment spray nozzle test would be required to ensure the nozzles remain unobstructed.
Review of industry experience indicates that containment spray systems of similar design are highly reliable (not subject to plugging). At least four boiling water reactors (BWRs) were previously approved this requested surveillance frequency, and at least seventeen pressurized water reactors (PWRs) were previously approved the same surveillance frequency for their containment spray systems (see section 4.2)
4.0 REGULATORY ANALYSIS
4.1 Applicable Regulatory Requirements/ Criteria
- 1. Title 10 Code of Federal Regulations 50 .36, "Technical specifications":
10 CFR 50.36(c)(2)(ii), Criterion 3, stipulates the following :
" ... structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier."
- 2. General Design Criteria (GDC)
MNGP was designed largely before the publishing of the 70 GDC for Nuclear Power Plant Construction Permits proposed by the Atomic Energy Commission (AEC) for public comment in July 1967, and constructed prior to the 1971 publication of the 10 CFR 50, Appendix A, GDC. As such, MNGP was not licensed to the Appendix A, GDC.
Page 6 of 12
L-MT-22-010 NSPM Enclosure The MNGP Updated Safety Analysis Report (USAR), Section 1.2, lists the Principal Design Criteria (PDC) for the design, construction, and operation of the plant. MNGP USAR Appendix E provides a plant comparative evaluation to the 70 proposed AEC design criteria. It was concluded that the plant conforms to the intent of the GDC.
The applicable AEC GDC are:
Criterion 58 - Inspection of Containment Pressure-Reducing System (Category A). Design provisions shall be made to facilitate the periodic physical inspection of all important components of the containment pressure-reducing systems, such as, pumps, valves, spray nozzles, torus, and sumps .
Criterion 60 - Testing of Containment Spray Systems (Category A)
A capability shall be provided to test periodically the delivery capability of the containment spray system at a position as close to the spray nozzle as is practical.
NSPM has evaluated the proposed change against the applicable regulatory requirements and acceptance criteria. The technical analysis concludes that the proposed TS changes will continue to assure that the design requirements and acceptance criteria for MNGP are met. Based on the considerations discussed above, (i) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (ii) such activities will be conducted in compliance with the Commission's regulations, and (iii) the approval of the proposed change will not be inimical to the common defense and security or to the health and safety of the public.
4.2 Precedent
- 1. Prairie Island Nuclear Generating Plant, dated November 6, 2008 (Reference 1)
- 2. Nine Mile Point Nuclear Station, dated February 11, 2008 (Reference 2)
- 3. Arkansas Nuclear One, dated July 2, 2007 (Reference 3)
- 4. R. E. Ginna Nuclear Power Plant, dated July 31, 2006 (Reference 4)
- 5. Comanche Peak Steam Electric Station, dated September 23, 2005 (Reference 5)
- 6. Vermont Yankee Nuclear Power Station, dated September 20, 2005 (Reference 6)
Page 7 of 12
L-MT-22-010 NSPM Enclosure
- 7. Crystal River, dated August 4, 2005 (Reference 7)
- 8. Millstone Power Station, dated May 31, 2005 (Reference 8)
- 9. Pilgrim Nuclear Power Station, dated April 12, 2005 (Reference 9)
- 10. Calvert Cliffs Nuclear Power Plant, dated April 8, 2004 (Reference 10)
- 11. Byron Station, dated September 22, 2003 (Reference 11)
- 12. South Texas Project, dated August 20, 2003 (Reference 12)
- 13. Beaver Valley Power Station, dated February 24, 2003 (Reference 13)
- 14. Palisades Plant, dated February 24, 2003 (Reference 14)
- 15. Braidwood Station, dated February 20, 2003 (Reference 15)
- 16. Surry, dated December 10, 2002 (Reference 16)
- 17. Salem Nuclear Generating Station, dated October 10, 2002 (Reference 17)
- 18. North Anna Power Station, dated October 1, 2002 (Reference 18)
- 19. H. B. Robinson Steam Electric Plant, dated September 19, 2002 (Reference 19)
- 20. Clinton Power Station, dated March 28, 2002 (Reference 20)
- 21. Perry Nuclear Power Plant, dated June 29, 2000 (Reference 21) 4.3 No Significant Hazards Consideration Determination In accordance with the provisions of 10 CFR 50.90, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), hereby requests a revision to the Technical Specifications (TS) for the Monticello Nuclear Generating Plant (MNGP). The proposed change would modify the frequency of TS Surveillance Requirement (SR) 3.6.1.8.2 for drywell spray nozzles to an event-based frequency, specifically, change the frequency from "10 years" to "Following maintenance that could result in nozzle blockage".
NSPM has evaluated whether or not a significant hazards conside ration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
Page 8 of 12
L-MT-22-010 NSPM Enclosure
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change modifies the surveillance requirement (SR) to verify that the drywell spray nozzles are unobstructed after maintenance that could introduce material that could result in nozzle blockage. The spray nozzles are not assumed to be initiators of any previously analyzed accident. Therefore, the proposed change does not increase the probability of any accident previously evaluated. The spray nozzles are used in the accident analyses to mitigate design basis accidents. The revised SR frequency does not affect the ability of the drywell spray system to perform its function . Since the system will still be able to perform its accident mitigation function , the consequences of accidents previously evaluated are not increased .
Therefore , the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any previously evaluated?
Response: No.
The proposed change revises the frequency for performance of the SR to verify that the RHR drywell spray system nozzles are unobstructed. The frequency is changed from every 10 years to following maintenance that could result in nozzle blockage. The change does not introduce a new mode of plant operation and does not involve physical modification to the plant. The change will not introduce new accident initiators or impact the assumptions made in the safety analysis.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated .
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response : No.
The proposed change revises the frequency for performance of the SR to verify that the RHR drywell spray system nozzles are unobstructed. The frequency is changed from every 10 years to following maintenance that could result in nozzle blockage. The change in SR frequency does not alter a design basis or safety limit.
Page 9 of 12
L-MT-22-010 NSPM Enclosure Therefore, the proposed change does not involve a significant reduction in a margin of safety.
4.4 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.
6.0 REFERENCES
- 1. Letter from NRC to Michael D. Wadley, Prairie Island Nuclear Generating Plant, "Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Re:
License Amendment to Revise Containment Spray Nozzle Surveillance Requirements (TAC Nos. MD7362 and MD7363)," dated November 6, 2008 (ADAMS Accession Number ML082740226)
- 2. Letter from the NRC to Keith J. Polson, "Nine Mile Point Nuclear Station, Unit No. 2 -
Issuance of Amendment Re: Revision to Drywell Spray Nozzle Testing Frequency (TAC No. MD6280)," dated February 11, 2008 (ADAMS Accession Numbers ML080170139 and ML0800520616)
- 3. Letter from NRC to Timothy G. Mitchell, "Arkansas Nuclear One, Unit No. 2 -
Issuance of Amendment Re: Containment Spray Nozzle Technical Specifications Test Requirements (TAC No. MD4835)," dated July 2, 2007 (ADAMS Accession Numbers ML071550004 and M071550003)
- 4. Letter from NRC to Mary G. Korsnick, "R. E. Ginna Nuclear Power Plant -
Amendment Re: Containment Spray Nozzle Testing Frequency (TAC No. MC9004),"
dated July 31, 2006 (ADAMS Accession Numbers ML061980055 and ML062140525)
Page 10 of 12
L-MT-22-010 NSPM Enclosure
- 5. Letter from NRC to M. R. Blevins, "Comanche Peak Steam Electric Station, Units I and 2 - Issuance of Amendments Re: Containment Spray System Surveillance Requirements for Spray Nozzles. (TAC Nos. MC4314 and MC 4315)," dated September 23, 2005 (ADAMS Accession Numbers ML052510487 and ML052760047)
- 6. Letter from NRC to Michael Kansler, "Vermont Yankee Nuclear Power Station -
Issuance of Amendment Re: Drywell Spray Header and Nozzle Air Test Frequency (TAC No. MC4603) ," dated September 20, 2005 (ADAMS Accession Numbers ML052360002 and ML052640090)
- 7. Letter from NRC to Mr. Dale E. Young , "Crystal River Unit 3 - Issuance of Amendment Regarding Reactor Building Spray Nozzles Surveillance (TAC No.
MC4878)," dated August 4, 2005 (ADAMS Accession Numbers ML052160348 and ML051710381)
- 8. Letter from NRC to Mr. David A. Christian , "Millstone Power Station, Unit 3 -
Issuance of Amendment Re: Quench Spray and Recirculation Spray Nozzle Surveillance (TAC No. MC4743)," dated May 31 , 2005 (ADAMS Accession Numbers ML050670028 and ML051520344)
- 9. Letter from NRC to Mr. Michael Kansler, "Pilgrim Nuclear Power Station- Issuance of Amendment Re: Revision to Surveillance requirement Frequency for containment and suppression Pool Spray Headers and Nozzles (TAC No . MC4311)," dated April 12, 2005 (ADAMS Accession Numbers ML050810006 and ML051040032)
- 10. Letter from NRC to Mr. George Vanderheyden, "Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Amendment Re: Changes to the Testing Requirements for Containment Spray Nozzles (TAC Nos. MC0030 and MC0031 )," dated April 8, 2004 (ADAMS Accession Numbers ML040720077 and ML041050324) 11 . Letter from NRC to Mr. John L. Skolds, "Byron Station, Units 1 and 2, Issuance of Amendments (TAC Nos. MB4853 and MB4854)," dated September 22, 2003 (ADAMS Accession Numbers ML032470096 and ML032691315)
- 12. Letter from NRC to Mr. James J. Sheppard , "South Texas Project, Units I and 2 -
Issuance of Amendments Re: Revision to Surveillance Requirement 3/4.6.2,
'Depressurization and Cooling Systems' (TAC Nos . MB9100 and MB9101 )," dated August 20, 2003 (ADAMS Accession Number ML032340230)
- 13. Letter from NRC to Mr. Mark B. Bezilla, "Beaver Valley Power Station, Unit Nos. 1 and 2 - Issuance of Amendments Re: Containment Spray Nozzle Surveillance Requirements (TAC Nos. MB5850 and MB5851) ," dated February 24, 2003 (ADAMS Accession Numbers ML030560174 , ML030580349 , and ML030580356)
Page 11 of 12
L-MT-22-010 NSPM Enclosure
- 14. Letter from NRC to Mr. Douglas E. Cooper, "Palisades Plant - Issuance of Amendment Re: Containment Spray Nozzles (TAC No. MB4283)," dated February 24, 2003 (ADAMS Accession Numbers ML030410045 and ML030580571)
- 15. Letter from NRC to Mr. John L. Skolds, "Braidwood Station, Units 1 and 2 -Issuance of Amendments (TAC Nos. MB4851 and MB4852)," dated February 20, 2003 (ADAMS Accession Numbers ML022880956 and ML030510344)
- 16. Letter from NRC to Mr. David A. Christian, "Surry Units 1 and 2 - Surveillance Frequency for the Containment Spray and Recirculation Spray Nozzles (TAC Nos.
MB5114 and MB5115)," dated December 10, 2002 (ADAMS Accession Numbers ML0234600086 and ML023470135)
- 17. Letter from NRC to Mr. Harold W. Keiser, "Salem Nuclear Generating Station, Units Nos. 1 and 2, Issuance of Amendment Re: Containment Spray Nozzles (TAC Nos.
MB5629 and MB5630) ," dated October 10, 2002 (ADAMS Accession Numbers ML022460003 and ML022880064)
- 18. Letter from NRC to Mr. David A. Christian, "North Anna Power Station, Units 1 and 2 - Issuance of Amendments Re: Quench Spray and Recirculation Spray Nozzles Surveillance Frequency (TAC Nos. MB4270 and MB4271)," dated October 1, 2002 (ADAMS Accession Numbers ML022750134 and ML022760129)
- 19. Letter from NRC to Mr. J. W. Moyer, "H. B. Robinson Steam Electric Plant, Unit 2 -
Issuance of Amendment - Technical Specification Change on Surveillance Requirement of Containment Vessel Spray Nozzle Testing Frequency (tac No. MB4248)," dated September 19, 2002 (ADAMS Accession Numbers ML02269068 and ML022660139)
- 20. Letter from NRC to Mr. Oliver D. Kingsley, "Clinton Power Station, Unit 1 - Issuance of Amendment (TAC No. MB2975)," dated March 28, 2002 (ADAMS Accession Numbers ML020570638 and ML02880505)
- 21. Letter from NRC to Mr. John K. Wood, "Perry Nuclear Power Plant, Unit 1 -Issuance of Amendment (TAC No. MA7136)," dated June 29, 2000 (ADAMS Accession Number ML003730258)
Page 12 of 12
ENCLOSURE1,ATTACHMENT1 MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1 License Amendment Request Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency TECHNICAL SPECIFICATIONS PAGES (MARKUP)
(1 Page Follows)
RHR Drywell Spray 3.6.1.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1 .8.1 Verify each RHR drywell spray subsystem manual In accordance with and power operated valve in the flow path that is not the Surveillance locked, sealed , or otherwise secured in position is in Frequency Control the correct position or can be aligned to the correct Program position .
SR 3.6.1.8.2 Verify each drywell spray header and nozzle is 10 years unobstructed.
1' SR 3.6.1.8.3 Verify RHR drywell spray subsystem locations /in accordance with susceptible to gas accumulation are sufficiently fille/ the Surveillance with water. Frequency Control Program Following maintenance that could result in nozzle blockage Monticello 3.6.1 .8-2 Amendment No. ITBD
ENCLOSURE1,ATTACHMENT2 MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1 License Amendment Request Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency TECHNICAL SPECIFICATIONS PAGES (RE-TYPED)
(1 Page Follows)
RHR Drywell Spray 3.6.1.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.8.1 Verify each RHR drywell spray subsystem manual In accordance with and power operated valve in the flow path that is not the Surveillance locked, sealed, or otherwise secured in position is in Frequency Control the correct position or can be aligned to the correct Program position.
SR 3.6.1.8.2 Verify each drywell spray header and nozzle is Following unobstructed. maintenance that could result in nozzle blockage SR 3.6.1.8.3 Verify RHR drywell spray subsystem locations In accordance with susceptible to gas accumulation are sufficiently filled the Surveillance with water. Frequency Control Program Monticello 3.6.1 .8-2 Amendment No. TBD
ENCLOSURE1,ATTACHMENT3 MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1 License Amendment Request Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency TECHNICAL SPECIFICATIONS BASES PAGES (MARKUP)
(For Information Only)
(2 Pages Follow)
RHR Drywell Spray B 3.6.1 .8 BASES ACTIONS (continued)
MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.6.1.8.1 REQUIREMENTS Verifying the correct alignment for manual and power operated valves in the RHR drywell spray mode flow path provides assurance that the proper flow paths will exist for system operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position since these valves were verified to be in the correct position prior to locking, sealing , or securing. A valve is also allowed to be in the nonaccident position provided it can be aligned to the accident position within the time assumed in the accident analysis. This is acceptable since the RHR drywell spray mode is manually initiated. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position . This SR does not apply to valves that cannot be inadvertently misaligned, such following as check valves.
maintenance that could result in eillance Frequency is controlled under the Surveillance nozzle blockage Frequency ntrol Program .
SR 3.6.1.8.2 This Surveillance is performed every 10 years to verify that the drywell spray nozzles are not obstructed and that spray flow will be provided when required. The 10 year Frequency is adequate to detect degradation in performance due to the pa *ve nozzle design and has been shown to be acceptable through operating INSERT B1 SR 3.6.1.8.3 RHR Drywell Spray System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the RHR drywell spray subsystems and may also prevent water hammer and pump cavitation.
Monticello B 3.6.1.8-3 Revision No. 59
INSERT B1 As an alternative , a visual inspection (e.g. , borescope) of the nozzles or piping could be used in lieu of an air test if a visual inspection is determined to provide an equivalent or more effective post-maintenance test. A visual inspection may be more effective if the potential for material intrusion is localized and the affected area is accessible.
Maintenance that could result in nozzle blockage would be those maintenance activities on the upper and lower drywell spray headers of the RHR system where the Foreign Material Exclusion program controls were deemed ineffective . For activities such as valve repair/replacement, a visual inspection would be the preferred post-maintenance test since small debris in a localized area is the most likely concern. An air test may be appropriate following an event where a large amount of debris potentially entered the system or water was actually discharged through the spray nozzles. The frequency