ML21160A104

From kanterella
Jump to navigation Jump to search
Submittal of Changes to the Emergency Plan
ML21160A104
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/09/2021
From: Conboy T
Northern States Power Company, Minnesota, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML21160A103 List:
References
L-MT-21-036
Download: ML21160A104 (3)


Text

fl Xcel Energy 2807 West County Road 75 Monticello, MN 55089 June 9, 2021 L-MT-21-036 10 CFR 50.54(q)(5) 10CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 Changes to the Monticello Nuclear Generating Plant {MNGP) Emergency Plan Pursuant to 10 CFR 50.54(q)(5) and 10 CFR 72.44 (f), Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, submits a summary of changes to the M_ NGP Emergency Plan as Enclosure 1. The new revision to the Emergency Plan is provided in Enclosure 2. The Emergency Plan changes have been reviewed and do not result in a reduction in the effectiveness of the Emergency Plan.

Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

Thomas A. Conboy Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota Enclosures (2) cc: Emergency Response Coordinator, Region Ill, USNRC (with Enclosures)

Resident Inspector, MNGP, USNRC (with Enclosure 1)

Administrator, Region Ill, USNRC (w/o Enclosures)

Chief, Operations Branch, Division of Reactor Safety, Region Ill, USNRC (with Enclosure 1)

Director, Division of Spent Fuel Management, Office of Nuclear Material Safety and Safeguards (with Enclosure 1)

ENCLOSURE 1

SUMMARY

OF CHANGES

ENCLOSURE 2 NEW REVISION OF EMERGENCY PLAN