ML21160A104
| ML21160A104 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 06/09/2021 |
| From: | Conboy T Northern States Power Company, Minnesota, Xcel Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML21160A103 | List: |
| References | |
| L-MT-21-036 | |
| Download: ML21160A104 (3) | |
Text
fl Xcel Energy June 9, 2021 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 2807 West County Road 75 Monticello, MN 55089 L-MT-21-036 10 CFR 50.54(q)(5) 1 0CFR 72.44(f)
Changes to the Monticello Nuclear Generating Plant {MNGP) Emergency Plan Pursuant to 10 CFR 50.54(q)(5) and 10 CFR 72.44 (f), Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, submits a summary of changes to the M_NGP Emergency Plan as Enclosure 1. The new revision to the Emergency Plan is provided in Enclosure 2. The Emergency Plan changes have been reviewed and do not result in a reduction in the effectiveness of the Emergency Plan.
Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
Thomas A. Conboy Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota Enclosures (2) cc:
Emergency Response Coordinator, Region Ill, USNRC (with Enclosures)
Resident Inspector, MNGP, USNRC (with Enclosure 1)
Administrator, Region Ill, USNRC (w/o Enclosures)
Chief, Operations Branch, Division of Reactor Safety, Region Ill, USNRC (with Enclosure 1)
Director, Division of Spent Fuel Management, Office of Nuclear Material Safety and Safeguards (with Enclosure 1)
ENCLOSURE 1
SUMMARY
OF CHANGES
ENCLOSURE 2 NEW REVISION OF EMERGENCY PLAN