L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations
| ML21110A689 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 04/20/2021 |
| From: | Conboy T Northern States Power Company, Minnesota, Xcel Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-MT-21-031, RIS 2021-01 | |
| Download: ML21110A689 (3) | |
Text
@ Xcel Energy*
April 20, 2021 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 2807 West County Road 75 Monticello, MN 55362 L-MT-21-031 RIS 2021-01 NRC Regulatory Issue Summary 2021 Preparation and Scheduling of Operator Licensing Examinations As requested by Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2021-01, "Preparation and Scheduling of Operator Licensing Examinations", dated March 24, 2021, Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, hereby submits the operator licensing examination data for calendar years 2023 through 2026, for the Monticello Nuclear Generating Plant (MNGP). Enclosed is the corresponding NRC Form 536, which provides the estimated number of applicants to be tested and proposed primary and alternate dates for the examinations.
Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
Thomas A. Conboy Site Vice President, Monticello clear Generating Plant Northern States Power Company - Minnesota Enclosure (1) cc:
Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC
ENCLOSURE 1 Operator Licensing Examination Data For the Monticello Nuclear Generating Plant (MNGP)
NRC FORM 536 (01-2021)
U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 01/31/2024 Estimated burden per response to comply with this voluntary information collection request: 45 minutes.
This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; e-mail: oira_submission@omb.eop.gov. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY CY CY CY CY CY CY NRC FORM 536 (01-2021) 2023 2024 1
2025 2026 1
2023 2024 6
6 1
10/14/2024 11/4/2024 2025 2026 6
6 1
10/19/2026 11/2/2026 Monticello Nuclear Generating Plant III