July 1, 2022
Mr. Christopher Domingos
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362-9637
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - INFORMATION
REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF
CHANGES, TESTS, AND EXPERIMENTS) BASELINE INSPECTION
Dear Mr. Domingos:
On November 14, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a
10 CFR 50.59, (Evaluation of Changes, Tests and Experiments), baseline inspection at the
Monticello Nuclear Generating Station. This inspection will be performed in accordance with the
NRC baseline Inspection Procedure (IP) 71111.17T. The onsite dates for this inspection will be
November 14 - 18, 2022.
Experience has shown that these baseline inspections are extremely resource intensive, both
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on
the site and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into two groups.
The first group of information is necessary to ensure that the inspection team is adequately
prepared for the inspection. This information should be made available via electronic methods
no later than September 6, 2022. The inspection team will review this information and, by
September 23, 2022, will request a second group of information that should be provided for
review in the regional office by October 24, 2022.
If there are any questions about the material requested or the inspection in general, please
contact Ms. E. Sanchez Santiago at 630-829-9520 or Elba.SanchezSantiago@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
C. Domingos -2-
In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's
"Rules of Practice," a copy of this letter and its enclosure will be available electronically for
public inspection in the NRC Public Document Room or from the Publicly Available Records
(PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Signed by Sanchez Santiago, Elba
on 07/01/22
Senior Reactor Inspector
Engineering Branch 2
Division of Reactor Safety
Docket No. 05000263
License No. DPR-22
Enclosure:
Requested Information to
Support 10 CFR 50.59
Inspection
cc: Distribution via LISTSERV
C. Domingos -3-
Letter to Christopher Domingos from Elba Sanchez Santiago dated July 1, 2022.
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - INFORMATION
REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF
CHANGES, TESTS, AND EXPERIMENTS) BASELINE INSPECTION
DISTRIBUTION:
RidsNrrDorlLpl3
RidsNrrPMMonticello
RidsNrrDroIrib Resource
DRPIII
DRSIII
ADAMS Accession Number: ML22182A384
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
OFFICE RIII
NAME ESanchez
Santiago:mb
DATE 07/01/2022
OFFICIAL RECORD COPY
50.59 INSPECTION DOCUMENT REQUEST
I. Information Requested for Preparation
The following information is requested by September 6, 2022, or sooner, to facilitate the
selection of specific items that will be reviewed during the onsite inspection week. The
inspection team will select specific items from the information requested below and
submit a list to your staff by September 23, 2022. We will request that certain items be
made available to the inspection team by October 24, 2022. All requested information
should identify the associated system and cover the time frame from the receipt of
information for the last 50.59 inspection to the present.
The required information identified below should be provided on compact disc (CD) or
uploaded to accessible links (preferred format is a share file type system). If CDs are
provided, please provide three copies of each CD submitted (i.e., one for each
inspector). The preferred file format is a searchable pdf file. The CDs should be
indexed and hyper-linked to facilitate ease of use, if possible. If you have any questions
regarding this information, please call the inspection team leader as soon as possible.
(1) List of all 10 CFR 50.59 completed evaluations involving (a) calculations,
(b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine
operating configurations, or (e) departures in methods of analyses. This list
should include 50.59 evaluations for the following:
a. Changes that have been made under the provisions of 10 CFR 50.59 that
have been updated in accordance with 10 CFR 50.71(e)(4) since the last
MOD/50.59 inspection;
b. Modifications that are field work complete; and
c. Changes to calculations (or initiation of new calculations) that have been
issued. The list should contain the number and title of each document, a brief
description of the change, and the corresponding number and type of the
affected document (i.e., the modification or procedure to which the evaluation
applies). The list should NOT include any evaluations in which prior NRC
approval was sought and obtained.
(2) A list of all 10 CFR 50.59 changes that have been screened out as not requiring
a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes
to the facility (modifications); (d) non-routine operating configurations; or
(e) departures in methods of analyses.
The list should contain the number and title of each document, a brief description
of the change, and the corresponding number and type of the affected document
(i.e., the modification or procedure to which the evaluation applies).
(3) A list of any modifications, procedure revisions, or Updated Final Safety Analysis
Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not
apply.
(4) A list of calculation changes that have been issued for use.
Enclosure
(5) A list of corrective action documents (open and closed) that address
10 CFR 50.59 issues, concerns, or processes. These documents should also
include the associated corrective action documents and the 50.59 change
implementation.
The list should contain the number, title and revision (or date) of each document,
the affected system and corresponding documentation (if applicable), and should
be sorted in order of significance.
(6) Copies of procedures addressing the following: modifications, design changes,
set point changes, equivalency evaluations or suitability analyses, commercial
grade dedications, post-modification testing, 10 CFR 50.59 evaluations and
screenings, and UFSAR updates.
(7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide
copies of the complete submittal.
(8) Copy of the UFSAR change log or a synopsis of the changes. This should
include all of the changes made to the UFSAR that were incorporated in the last
10 CFR 50.71(e)(4) submittal.
(9) Electronic copy of the UFSAR and Bases, and technical specifications, if
available.
(10) Name(s) and phone numbers for the regulatory and technical contacts.
(11) Current management and engineering organizational chart.
II. Information Request to be Available by October 24, 2022
(1) Copies of all selected items from Section I. This includes copies of
associated documents such as engineering change package, calculations,
post-modification test packages, 10 CFR 50.59 evaluations or screenings, and
any corrective action documents.
(2) Copies of these documents do not need to be solely available to the inspection
team as long as the inspectors have easy and unrestrained access to them.
a. UFSAR, if not previously provided;
b. Original Final Safety Analysis Report (FSAR) Volumes;
c. Original Safety Evaluation Report and Supplements;
d. FSAR Question and Answers;
e. Quality Assurance (QA) Plan;
f. Technical Specifications, if not previously provided;
2
g. Latest Individual Plant Examination and Probabilistic Risk Assessment Report;
h. Vendor Manuals; and
i. The latest 10 CFR 50.59 UFSAR Update Submittal.
(3) Please ensure that other supporting documents for the selected items have been located
and are readily retrievable as the inspection team will likely be requesting these
documents during the inspection. Examples of supporting documents are:
a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
(4) Assessment and Corrective Actions:
a. The most recent MOD/50.59 QA audit and/or self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of corrective
actions) generate as a result of the most recent MOD/50.59 QA audit and/or
self-assessment.
If you have any questions regarding the information requested, please contact the inspection team
leader.
3