Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests, and Experiments) Baseline Inspection 05000263/2022012
ML22182A384
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 07/01/2022
From: Sanchez Santiago E
NRC/RGN-III/DRS/EB2
To: Domingos C
Northern States Power Co
References
IR 2022012
Download: ML22182A384 (6)


See also: IR 05000263/2022012

Text

July 1, 2022

Mr. Christopher Domingos

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - INFORMATION

REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF

CHANGES, TESTS, AND EXPERIMENTS) BASELINE INSPECTION

05000263/2022012

Dear Mr. Domingos:

On November 14, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a

10 CFR 50.59, (Evaluation of Changes, Tests and Experiments), baseline inspection at the

Monticello Nuclear Generating Station. This inspection will be performed in accordance with the

NRC baseline Inspection Procedure (IP) 71111.17T. The onsite dates for this inspection will be

November 14 - 18, 2022.

Experience has shown that these baseline inspections are extremely resource intensive, both

for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on

the site and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into two groups.

The first group of information is necessary to ensure that the inspection team is adequately

prepared for the inspection. This information should be made available via electronic methods

no later than September 6, 2022. The inspection team will review this information and, by

September 23, 2022, will request a second group of information that should be provided for

review in the regional office by October 24, 2022.

If there are any questions about the material requested or the inspection in general, please

contact Ms. E. Sanchez Santiago at 630-829-9520 or Elba.SanchezSantiago@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

C. Domingos -2-

In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's

"Rules of Practice," a copy of this letter and its enclosure will be available electronically for

public inspection in the NRC Public Document Room or from the Publicly Available Records

(PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Signed by Sanchez Santiago, Elba

on 07/01/22

Elba Sanchez Santiago

Senior Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket No. 05000263

License No. DPR-22

Enclosure:

Requested Information to

Support 10 CFR 50.59

Inspection

cc: Distribution via LISTSERV

C. Domingos -3-

Letter to Christopher Domingos from Elba Sanchez Santiago dated July 1, 2022.

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - INFORMATION

REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF

CHANGES, TESTS, AND EXPERIMENTS) BASELINE INSPECTION

05000263/2022012

DISTRIBUTION:

Jessie Quichocho

Robert Orlikowski

RidsNrrDorlLpl3

RidsNrrPMMonticello

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Shelbie Lewman

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML22182A384

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

OFFICE RIII

NAME ESanchez

Santiago:mb

DATE 07/01/2022

OFFICIAL RECORD COPY

50.59 INSPECTION DOCUMENT REQUEST

I. Information Requested for Preparation

The following information is requested by September 6, 2022, or sooner, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspection team will select specific items from the information requested below and

submit a list to your staff by September 23, 2022. We will request that certain items be

made available to the inspection team by October 24, 2022. All requested information

should identify the associated system and cover the time frame from the receipt of

information for the last 50.59 inspection to the present.

The required information identified below should be provided on compact disc (CD) or

uploaded to accessible links (preferred format is a share file type system). If CDs are

provided, please provide three copies of each CD submitted (i.e., one for each

inspector). The preferred file format is a searchable pdf file. The CDs should be

indexed and hyper-linked to facilitate ease of use, if possible. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

(1) List of all 10 CFR 50.59 completed evaluations involving (a) calculations,

(b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine

operating configurations, or (e) departures in methods of analyses. This list

should include 50.59 evaluations for the following:

a. Changes that have been made under the provisions of 10 CFR 50.59 that

have been updated in accordance with 10 CFR 50.71(e)(4) since the last

MOD/50.59 inspection;

b. Modifications that are field work complete; and

c. Changes to calculations (or initiation of new calculations) that have been

issued. The list should contain the number and title of each document, a brief

description of the change, and the corresponding number and type of the

affected document (i.e., the modification or procedure to which the evaluation

applies). The list should NOT include any evaluations in which prior NRC

approval was sought and obtained.

(2) A list of all 10 CFR 50.59 changes that have been screened out as not requiring

a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes

to the facility (modifications); (d) non-routine operating configurations; or

(e) departures in methods of analyses.

The list should contain the number and title of each document, a brief description

of the change, and the corresponding number and type of the affected document

(i.e., the modification or procedure to which the evaluation applies).

(3) A list of any modifications, procedure revisions, or Updated Final Safety Analysis

Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not

apply.

(4) A list of calculation changes that have been issued for use.

Enclosure

(5) A list of corrective action documents (open and closed) that address

10 CFR 50.59 issues, concerns, or processes. These documents should also

include the associated corrective action documents and the 50.59 change

implementation.

The list should contain the number, title and revision (or date) of each document,

the affected system and corresponding documentation (if applicable), and should

be sorted in order of significance.

(6) Copies of procedures addressing the following: modifications, design changes,

set point changes, equivalency evaluations or suitability analyses, commercial

grade dedications, post-modification testing, 10 CFR 50.59 evaluations and

screenings, and UFSAR updates.

(7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide

copies of the complete submittal.

(8) Copy of the UFSAR change log or a synopsis of the changes. This should

include all of the changes made to the UFSAR that were incorporated in the last

10 CFR 50.71(e)(4) submittal.

(9) Electronic copy of the UFSAR and Bases, and technical specifications, if

available.

(10) Name(s) and phone numbers for the regulatory and technical contacts.

(11) Current management and engineering organizational chart.

II. Information Request to be Available by October 24, 2022

(1) Copies of all selected items from Section I. This includes copies of

associated documents such as engineering change package, calculations,

post-modification test packages, 10 CFR 50.59 evaluations or screenings, and

any corrective action documents.

(2) Copies of these documents do not need to be solely available to the inspection

team as long as the inspectors have easy and unrestrained access to them.

a. UFSAR, if not previously provided;

b. Original Final Safety Analysis Report (FSAR) Volumes;

c. Original Safety Evaluation Report and Supplements;

d. FSAR Question and Answers;

e. Quality Assurance (QA) Plan;

f. Technical Specifications, if not previously provided;

2

g. Latest Individual Plant Examination and Probabilistic Risk Assessment Report;

h. Vendor Manuals; and

i. The latest 10 CFR 50.59 UFSAR Update Submittal.

(3) Please ensure that other supporting documents for the selected items have been located

and are readily retrievable as the inspection team will likely be requesting these

documents during the inspection. Examples of supporting documents are:

a. Drawings supporting the modifications;

b. Procedures affected by the modifications; and

c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

(4) Assessment and Corrective Actions:

a. The most recent MOD/50.59 QA audit and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of corrective

actions) generate as a result of the most recent MOD/50.59 QA audit and/or

self-assessment.

If you have any questions regarding the information requested, please contact the inspection team

leader.