Forwards Safety Insp Repts 50-295/86-26 & 50-304/86-26 on 861027-870217 & Notice of Violation.Confirmatory Action Ltr CAL-RIII-86-06,issued on 861027,denotes Stipulations to Evaluate 861024 Diesel Failure
ML20211F776
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/18/1987
From: Chrissotimos N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20211F781 List:
References
CAL-RIII-86-06, CAL-RIII-86-6, NUDOCS 8702250196
Download: ML20211F776 (2)


See also: IR 05000295/1986026

Text

-

,

,

FEB 181987

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

~This refers to the special safety inspection conducted by Messrs. J. W. Muffett,

H. A. Walker and J. M. Jacobson of this office on October 27, November 6, 11,

12, 14, and 20, 1986,- and February 17, 1987,'of activities at. Zion Station,

Units 1 and 2, authorized by NRC Operating Licenses No. DPR-39 and No. DPR-48

and to the discussion of our findings with Mr. G. J. Plimi .at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. . Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

_

. Following the Diesel failure on October 24, 1986, Connonwealth Edison Company

(CECO) and the-NRC, on October 25,1986, agreed to certain stipulations to

evaluate the root cause and significance of this failure. These stipulations

were denoted in a Confirmatory Action Letter (CAL) (CAL-RIII-86-CC6), issued on

October 27, 1986. The six required actions stated in the CAL have been completed

by Ceco, reviewed and found to be acceptable by the NRC, therefore, this CAL is

closed.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. A written response

.is required.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

0702250196 870218 5

DR ADOCK 0500

f 0/

FEB 181987

Corrronwealth Edison Company 2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original signed by N. J. Chrissotimos

N. J. Chrissotimos, Acting

Division Director

Enclosures:

1. Notice of Viol & tion

2. Inspection Reports

No. 50-295/86026(DRS); and

No. 50-304/86026(DRS)

3. Ceco ltr. dtd 02/06/87

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

G. J. Plim1, Station Manager

Jan Norris, Project Manager, hRR

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

Mayor, City of Zion

7-

I jos

RII i

f RI s TII RIII

Wa er/jk

? Jac bson

k]h%--

Burgess H rison

f

Chrtssotimos

- 02/18/87 02/s8/87 02//f /87 02/44/87 02/ @ /87

l

l

l

,

L: