ML20234B102

From kanterella
Revision as of 19:25, 28 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-267/87-21 on 870801-31 & Notice of Violation
ML20234B102
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/14/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20234B106 List:
References
NUDOCS 8709180263
Download: ML20234B102 (2)


See also: IR 05000267/1987021

Text

-% ,

' '-

SEP 141937

i

In Reply Refer To:

Docket: 50-267/87-21 .l

l

l

l

Public Service Company of Colorado

ATTN: Robert 0. Williams, Jr. H

Vice President, Nuclear '

Operations

P.O. Box 840

Denver, Colorado 80201

<

Gentlemen:

This refers to the inspection conducted by Messrs. R. E. Farrell and

P. W. Michaud of this office during the period August 1-31, 1987, of activities

authorized by NRC Operating License DPR-34 for Fort St. Vrain Nuclear

Generating Station, and to the discussion of our findings with you and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included licensee action on previous

inspection findings, operational safety verification, monthly surveillance

observation, monthly maintenance observation, region peaking factor

surveillance, security, and radiological protection. Within these-areas', the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspectors. The

inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to oreviously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

k

RI SRI ' R C:RPB

PWM(ZhaW REF rre J don JEGa 1 a do

} ////87 G////87 q /, /

f / (I/87

1

8709180263 870914

PDR ADOCK 05000267

G PDR g(

_ _ - _ _ _ _ _ _ _ _ _ _ _ _

,

Public Service Company of Colorado -2- 1

l

Should you have any questions concerning this inspection, we will be pleased to i

discuss them with you.

Sincerely,

DriginM signed By

0. E. Gagliardo

J. E. Gagliardo, Chief

Reactor Projects Branch

1 Enclosures:

1. Appendix A - Notice of Violation

g 2. Appendix B - NRC Inspection Report  :

'

50-267/87-21  !

cc w/ enclosures:

l

Manager, Nuclear

Production Division  ;

Fort St. Vrain huclear Generating Station  ;

16805 WCR 19 1/2 t

Platteville, Colorado 80651

P. Tomlinson, Manager, Quality

Assurance Division 1

(Same Address)

Colorado Radiation Control Program Director

'

Colorado Public Utilities Commission

bec to DM8 (IE01) ,

.> <

!

bcc distrib, by RIV:

  • RPB R. D. Martin, RA i
  • RRI DRSP
  • Section Chief (RP8/A) *RIV File
  • Section Chief (RSB/ES) *R&SPB
  • RSTS OPERATOR * MIS System
  • RSB * Project Inspector
  • 0. Weiss, RM/ALF *R. Hall
  • Enforcement Officer
  • w/766

l

l

1

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -