ML20234B102
| ML20234B102 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 09/14/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20234B106 | List: |
| References | |
| NUDOCS 8709180263 | |
| Download: ML20234B102 (2) | |
See also: IR 05000267/1987021
Text
-%
,
'
' -
SEP 141937
i
In Reply Refer To:
Docket:
50-267/87-21
.l
l
l
l
Public Service Company of Colorado
ATTN:
Robert 0. Williams, Jr.
H
Vice President, Nuclear
'
Operations
P.O. Box 840
Denver, Colorado
80201
<
Gentlemen:
This refers to the inspection conducted by Messrs. R. E. Farrell and
P. W. Michaud of this office during the period August 1-31, 1987, of activities
authorized by NRC Operating License DPR-34 for Fort St. Vrain Nuclear
Generating Station, and to the discussion of our findings with you and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included licensee action on previous
inspection findings, operational safety verification, monthly surveillance
observation, monthly maintenance observation, region peaking factor
surveillance, security, and radiological protection.
Within these-areas', the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspectors.
The
inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to oreviously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
k
RI
SRI '
R
C:RPB
PWM(ZhaW
REF rre
J
don
JEGa 1 a do
} ////87
G////87
f / (I/87
q /, /
1
8709180263 870914
ADOCK 05000267
G
g(
_ _ - _ _ _ _ _ _ _ _ _ _ _ _
,
Public Service Company of Colorado
-2-
1
l
Should you have any questions concerning this inspection, we will be pleased to
i
discuss them with you.
Sincerely,
DriginM signed By
0. E. Gagliardo
J. E. Gagliardo, Chief
Reactor Projects Branch
1
Enclosures:
1.
Appendix A - Notice of Violation
g
2.
Appendix B - NRC Inspection Report
50-267/87-21
!
'
cc w/ enclosures:
l
Manager, Nuclear
Production Division
Fort St. Vrain huclear Generating Station
16805 WCR 19 1/2
t
Platteville, Colorado
80651
P. Tomlinson, Manager, Quality
Assurance Division
1
(Same Address)
'
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
bec to DM8 (IE01)
,
.>
<
!
bcc distrib, by RIV:
- RPB
R. D. Martin, RA
i
- RRI
DRSP
- Section Chief (RP8/A)
- RIV File
- Section Chief (RSB/ES)
- R&SPB
- RSTS OPERATOR
- MIS System
- RSB
- Project Inspector
- 0. Weiss, RM/ALF
- R. Hall
- Enforcement Officer
- w/766
l
l
1
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -