ML20234B124
| ML20234B124 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 09/14/1987 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20234B106 | List: |
| References | |
| 50-267-87-21, NUDOCS 8709180270 | |
| Download: ML20234B124 (1) | |
Text
'BrN -
1
) %' A 3 5 9 ;,-
1
. v 6).
- i.
1,.%
v 4
s
.4
' Ni[ /)
l )V o,/. s
\\l APPENDIX A d-q j-7 gS0TICE OF VIOLATION j
i PublicServiceCompanyofColorad Docket:
50-267 Fort St. Vrain g
License: DPR-34 j
During an NRC-. inspection conducted on August 1-31,'1987; a violation of NRC i
l.
requirements was identified. The viclation involved inadequate procedures for control _ of radioactivity. Jn accordince with the " General Statemnt of Pol'1c
. and Procedure for NRC Enforcement. Actions," 10 CFR Part.2, Appen61x C (1987),'
the violation is listed below:-
.lf, T,
s Inadequate Procedures for Control of Radioactivity
'[
,. lf,, 6 '
Technical Specification AC 7.4.a.1 requires tfiat procedures'shall be;,
.,.. [ '
O established, implemented, and maintained' covering the activit,ies
./<
I recommended in Appendix A of' Regulatory Gu'ide 1.33,14ovember '1972.
L' paragraph G of' Appendix A to'Regulatcry Guf;de 1,33 delineates proceduren 21 for the control of radioactivity.
l J
- e s
i Contrary to. the above, no procedun,s existed on August 20,1987',.to_f' establish. responsibility or provide directions for actions to be takenf to
- area after the _ portal monitor alaims.
- 5j control contamination if an individual attempts to er.it the protected This is a Severity Level IV violations (SupplementIV)(267/8721-05,FF l
Pursuant to the provisions.of 10 CFR 2.201, Public Service Company of Colorado is hereby required tn submit a written statement or explanation to this Office
.(
1 within 30 days of the date of the letter transmitting this Notice. This reply,
]
should include for each violation:
(1) the reason for the violation if <
admitted, (2) the corrective steps that have been taken and the results i
achieved. (3) the corrective steps that will be taken to avoid further a
violations, and (4) the date when full complianca yill be achieved. Where. good cause is shown, consideration will be given to extending the response time.
Dated at Arlington, Texas, this /4/6 dayof,4g,,&t 1987 i-
)
B709180270 870914 PDR ADOCK 05000267 G
',