Forwards Safety Insp Repts 50-456/87-43 & 50-457/87-42 on 871117 & 1201-04.No Violations Noted.No Outstanding Emergency Preparedness Concerns W/Adverse Impact on Commission Decision Re Granting Low Power License Exist
ML20237E606
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/22/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20237E608 List:
References
NUDOCS 8712290082
Download: ML20237E606 (2)


See also: IR 05000456/1987043

Text

-

-

..

..

DEC22 1987

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Mr. T. J. Ploski and

others of this office on November 17, 1987 and December 1-4, 1987, of activities

at the Braidwood Nuclear Generating Station, Ur.its 1 and 2, authorized by NRC

Operating License No. NPF-72 and Construction Permit No. CPPR-133, and to the

discussion of our findings with Mr. E. E. Fitzpatrick and others of your staff

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

This was a final appraisal of the Braidwood Station's emergency preparedness

program prior to the scheduled Unit 2 fuel loading. No violations of NRC

requirements were identified during this appraisal, which supplemented a

routine inspection of the program conducted in August 1987, as documented in

Inspection Report No. 50-456/87026(DRSS) and No. 50-457/87026(DRSS). As a

result of this appraisal and previous inspections, there are no outstanding

emergency preparedness concerns which could adversely impact a Commission

decision regarding the granting of a low power license for Unit 2.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure: Inspection Reports

No. 50-456/87043(DRSS); and

No. 50-457/87042(DRSS)

See Attached Distribution '

Rill RI.II RIII .1] RI I g

Plosk b th 1 1 af

8712290082 871222 t/ YE5

PDR ADOCK 05000456 / cf

t- G TKC[iD . _ _ _ _ _ _ _ _ __

_ _ _ _ _ _ _

- *

,.

..

Commonwealth Edison Company 2

DEC)2 21987

Distribution

cc w/ enclosure:

T. J. Maiman, Vice President,

PWR Operations

D. Butterfield, Nuclear

Licensing Manager

M. Wallace, Manager of Projects

D. Shamblin, Project Manager

W. Vahle, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr. , Esq. '

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

G. Berry, DGC

J. Stevens, NRR

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

The Honorable Ivan W. Smith, ASLB

The Honorable Gary J. Edles, ASLAP

The Honorable Dr. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP

D. Matthews, EPB, NRR

W. Weaver, FEMA, RV

. _ - _ _ _ - _ - _ - _ _ - _