ML20237E606
| ML20237E606 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 12/22/1987 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20237E608 | List: |
| References | |
| NUDOCS 8712290082 | |
| Download: ML20237E606 (2) | |
See also: IR 05000456/1987043
Text
-
-
..
..
DEC22 1987
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Senior Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special safety inspection conducted by Mr. T. J. Ploski and
others of this office on November 17, 1987 and December 1-4, 1987, of activities
at the Braidwood Nuclear Generating Station, Ur.its 1 and 2, authorized by NRC
Operating License No. NPF-72 and Construction Permit No. CPPR-133, and to the
discussion of our findings with Mr. E. E. Fitzpatrick and others of your staff
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
This was a final appraisal of the Braidwood Station's emergency preparedness
program prior to the scheduled Unit 2 fuel loading. No violations of NRC
requirements were identified during this appraisal, which supplemented a
routine inspection of the program conducted in August 1987, as documented in
Inspection Report No. 50-456/87026(DRSS) and No. 50-457/87026(DRSS). As a
result of this appraisal and previous inspections, there are no outstanding
emergency preparedness concerns which could adversely impact a Commission
decision regarding the granting of a low power license for Unit 2.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
W. D. Shafer, Chief
Radiological Protection Branch
Enclosure:
Inspection Reports
No. 50-456/87043(DRSS); and
No. 50-457/87042(DRSS)
See Attached Distribution
Rill
RI.II
RIII
.1]
RI I
'
g
Plosk
b
th
1
1
af
/ cf
YE5
8712290082 871222
t/
ADOCK 05000456
G
TKC[iD
. _ _ _ _ _ _ _ _
__
t-
_ _ _ _ _ _ _
-
,.
..
DEC)2 21987
Commonwealth Edison Company
2
Distribution
cc w/ enclosure:
T. J. Maiman, Vice President,
PWR Operations
D. Butterfield, Nuclear
Licensing Manager
M. Wallace, Manager of Projects
D. Shamblin, Project Manager
W. Vahle, Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P. L. Barnes, Regulatory
Assurance Supervisor
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
'
D. W. Cassel, Jr. , Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, OGC
G. Berry, DGC
J. Stevens, NRR
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
The Honorable Ivan W. Smith, ASLB
The Honorable Gary J. Edles, ASLAP
The Honorable Dr. W. Reed Johnson, ASLAP
The Honorable Christine N. Kohl, ASLAP
D. Matthews, EPB, NRR
W. Weaver, FEMA, RV
. _ - _ _ _ - _ - _ - _ _ - _