IR 05000346/1985026

From kanterella
Revision as of 14:03, 26 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of 851115 Ltr Informing NRC of Steps Taken to Correct Noncompliance Noted in Insp Rept 50-346/85-26. Concerns Re Corrective Actions Encl.Encl Withheld (Ref 10CFR73.21).Response Requested within 30 Days
ML20141G311
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/06/1986
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Williams J
TOLEDO EDISON CO.
Shared Package
ML20141G315 List:
References
NUDOCS 8601100128
Download: ML20141G311 (2)


Text

y~A AG p gnr .

un,iin-n.

u u -A-.13 n L J _ lJW TV f{

,

() ;

JAN 0 61986

Docket No. 50-346

~

Toledo Edison Company ATTN: Mr. Joe Williams, Jr.

Vice President Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652

Dear Mr. Williams:

This is to acknowledge receipt of your letter dated November 15, 1985, which transmitted your response to an apparent item of noncompliance with NRC requirements identified in our Inspection Report No. 50-346/85026.

The time required to complete corrective action and reach full compliance appears to be excessive. A discussion of our concerns with your corrective action is contained in the enclosure to this letter.

You are requested to review your corrective action timetable. Please advise this office of the results of your review and enclose any expedited timetables you may develop or identify the reasons that prevent more expeditious corrective action.

Your written response should be forwarded to this office within 30 days after receipt of this letter.

Areas addressed in the enclosure to this letter contain Safeguards Information of a type specified in 10 CFR 73.21. Consequently, the enclosure to this letter will not be placed in the Public Document Room. Therefore, your written response pertaining to the concern identified in the enclosure to this letter should be submitted as a separate enclosure to your transmittal letter.

The response directed by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questiont you have concerning this inspection.

Sincerely, 0601100120 860106 PDR ADOCK 05000346 x M L,' Axe /on, Chief w

G PDR Nuclear Materials Safety /}d4~ g l and Safeguards Branch

.

r

- . ,

q See Attached Distribution .. m0:1 i , it.Lloa lhls RIII RIMI RIII RII i../. L Cxontrolled

'

Dr / ced w elso SFAAuWO K E *.

, .

SA.'ET.RCS ?'FOR V AT OY Toledo Edison Company 2 a

Enclosure: 'As stated (UNCLASSIFIED JAll 0 61986 SAFEGUARDS INF0PPATION)

. Distribution cc w/ enclosure:

L. Storz, Plant Manager cc w/ltr dtd 11/15/85, w/ UNCLASSIFIED SAFEGUARDS.

INFORMATION:

IE File IE/DI/0 PPB IE/ES NMSS/SGPL NRR/DL/SSPB ACRS cc w/ltr dtd 11/15/85, w/o UNCLASSIFIED SAFEGUARDS '

INFORMATION:

DCS/RSB(RIDS)

Licensing Fee Managernent Branch Resident Inspector, RIII Harold W. Xohn, Ohio EPA James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health gar -n3 WOR #r 0N t