Physical Protection Insp Rept 50-346/85-14 on 850429-0502.No Noncompliance Noted.Major Areas Inspected:Security Program Audit,Testing & Maint,Lighting & Compensatory Measures. Details Withheld (Ref 10CFR73.21)
ML20127D658
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/28/1985
From: Creed J, Drouin B, Madeda T, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20127D586 List:
References
50-346-85-14, NUDOCS 8506240294
Download: ML20127D658 (2)


Text

, .

e U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-346/85014(DRSS)

Docket No. 50-346 License No. NPF-3 Safeguards Group IV Licensee: Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, OH 43652 Facility Name: Davis-Besse Nuclear Power Station, Unit 1 Inspection At: Davis-Besse Site, Oak Harbor, OH Inspection Conducted: April 29 to May 2, 1985  :

Date of Last Physical Security Inspection: June 25-29 and July 5, 1984 Type of Inspection: Routine, Unannounced Physical Protection Inspectors: m [ /hc A ,&. J/zfr/ff T. J./jVafeda Date'

Physical Security Inspector

<1 %u~

G. L. Pirtle /

c s/uhr Date Physical Security Inspector N Drouin Date h6l8$

ysical Security Inspector Approved By: nah I[88!8 y.R. Creed, Chief Date Safeguards Section Inspection Summary Inspection on April 29 to May 2, 1985 (Report No. 50-346/85014(DRSS))

Areas Inspected: Included a Review of Management Effectiveness; Security Program Audit; Testing and Maintenance; Lighting; Compensatory Measures; Access Control - Personnel, Vehicles and Packages; Locks, Keys and Enclosure contains SAFEGUT.RDS INFO."d:ATIO,'l 8506240294 850528 Upon scparatica this DR ADOCK O p?go is D controlled g6 -

!

- .- -

!

--

, o Combinations; Security System Power Supply; Communications; Physical Barriers - Protected and Vital Areas; Detection Aids - Protected and Vital

-

Areas; Alars Stations. Training and Qualifications and Contingency Pla The inspectors reviewed the licensee's actions / performance relating to several weaknesses / concerns in the'above areas which were identified as a result of a Region III analysis of previous inspection findings, 10 CFR 73.71 security event reports, and the previous SALP report. The inspection involved 81 inspector-hours onsite by three NRC inspectors. The inspection began during the day. shift; nine inspector-hours were accomplished during off-shift period Results: The licensee was found to be in compliance with NRC requirements-within the areas examined during this inspection, except as noted below:

Physical Barrier - Vital Area: One vital area portal was inadequately locke (Details - UNCLASSIFIED )

.

Encle:uro contains SAFEGUARDS II:FC:UIATICN Upon Scparation this p?so is Decentrolled 2