e U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-346/85014(DRSS)
Docket No. 50-346 License No. NPF-3 Safeguards Group IV Licensee:
Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, OH 43652 Facility Name: Davis-Besse Nuclear Power Station, Unit 1 Inspection At:
Davis-Besse Site, Oak Harbor, OH Inspection Conducted:
April 29 to May 2, 1985
Date of Last Physical Security Inspection:
June 25-29 and July 5, 1984 Type of Inspection:
Routine, Unannounced Physical Protection Inspectors:
[ /hc A,&.
J/zfr/ff m
T. J./jVafeda Date'
Physical Security Inspector
<1 %u~
c s/uhr G. L. Pirtle
/
Date Physical Security Inspector NY h6l8$
Drouin Date
.
ysical Security Inspector Approved By:
nah I[88!8 y.R. Creed, Chief Date Safeguards Section Inspection Summary Inspection on April 29 to May 2, 1985 (Report No. 50-346/85014(DRSS))
Areas Inspected:
Included a Review of Management Effectiveness; Security Program Audit; Testing and Maintenance; Lighting; Compensatory Measures; Access Control - Personnel, Vehicles and Packages; Locks, Keys and Enclosure contains SAFEGUT.RDS INFO."d:ATIO,'l 8506240294 850528 Upon scparatica this g6 -
p?go is D controlled DR ADOCK O
-.-
-
--
,
o Combinations; Security System Power Supply; Communications; Physical Barriers - Protected and Vital Areas; Detection Aids - Protected and Vital
-
Areas; Alars Stations. Training and Qualifications and Contingency Plan.
The inspectors reviewed the licensee's actions / performance relating to several weaknesses / concerns in the'above areas which were identified as a result of a Region III analysis of previous inspection findings, 10 CFR 73.71 security event reports, and the previous SALP report.
The inspection involved 81 inspector-hours onsite by three NRC inspectors. The inspection began during the day. shift; nine inspector-hours were accomplished during off-shift periods.
Results:
The licensee was found to be in compliance with NRC requirements-within the areas examined during this inspection, except as noted below:
Physical Barrier - Vital Area: One vital area portal was inadequately locked.
(Details - UNCLASSIFIED )
.
Encle:uro contains SAFEGUARDS II:FC:UIATICN Upon Scparation this p?so is Decentrolled 2