IR 05000346/1985014

From kanterella
Jump to navigation Jump to search
Physical Protection Insp Rept 50-346/85-14 on 850429-0502.No Noncompliance Noted.Major Areas Inspected:Security Program Audit,Testing & Maint,Lighting & Compensatory Measures. Details Withheld (Ref 10CFR73.21)
ML20127D658
Person / Time
Site: Davis Besse 
Issue date: 05/28/1985
From: Creed J, Drouin B, Madeda T, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20127D586 List:
References
50-346-85-14, NUDOCS 8506240294
Download: ML20127D658 (2)


Text

,

.

e U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-346/85014(DRSS)

Docket No. 50-346 License No. NPF-3 Safeguards Group IV Licensee:

Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, OH 43652 Facility Name: Davis-Besse Nuclear Power Station, Unit 1 Inspection At:

Davis-Besse Site, Oak Harbor, OH Inspection Conducted:

April 29 to May 2, 1985

Date of Last Physical Security Inspection:

June 25-29 and July 5, 1984 Type of Inspection:

Routine, Unannounced Physical Protection Inspectors:

[ /hc A,&.

J/zfr/ff m

T. J./jVafeda Date'

Physical Security Inspector

<1 %u~

c s/uhr G. L. Pirtle

/

Date Physical Security Inspector NY h6l8$

Drouin Date

.

ysical Security Inspector Approved By:

nah I[88!8 y.R. Creed, Chief Date Safeguards Section Inspection Summary Inspection on April 29 to May 2, 1985 (Report No. 50-346/85014(DRSS))

Areas Inspected:

Included a Review of Management Effectiveness; Security Program Audit; Testing and Maintenance; Lighting; Compensatory Measures; Access Control - Personnel, Vehicles and Packages; Locks, Keys and Enclosure contains SAFEGUT.RDS INFO."d:ATIO,'l 8506240294 850528 Upon scparatica this g6 -

p?go is D controlled DR ADOCK O

-.-

-

--

,

o Combinations; Security System Power Supply; Communications; Physical Barriers - Protected and Vital Areas; Detection Aids - Protected and Vital

-

Areas; Alars Stations. Training and Qualifications and Contingency Plan.

The inspectors reviewed the licensee's actions / performance relating to several weaknesses / concerns in the'above areas which were identified as a result of a Region III analysis of previous inspection findings, 10 CFR 73.71 security event reports, and the previous SALP report.

The inspection involved 81 inspector-hours onsite by three NRC inspectors. The inspection began during the day. shift; nine inspector-hours were accomplished during off-shift periods.

Results:

The licensee was found to be in compliance with NRC requirements-within the areas examined during this inspection, except as noted below:

Physical Barrier - Vital Area: One vital area portal was inadequately locked.

(Details - UNCLASSIFIED )

.

Encle:uro contains SAFEGUARDS II:FC:UIATICN Upon Scparation this p?so is Decentrolled 2