ML20137H229

From kanterella
Revision as of 18:33, 17 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Exam Rept 50-237/OL-85-02 on 850610-14 & Exams & Answer Keys
ML20137H229
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/26/1985
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20137H232 List:
References
NUDOCS 8508280228
Download: ML20137H229 (1)


Text

O AUG 2 61985 Docket No. 50-237 Docket No. 50-249 Conconwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

SUBJECT:

EXAMINATION REPORT On June 10-14, 1985, the NRC administered examinations to employees of your company who had applied for licenses to operate your Dresden Nuclear Power Station 2 and 3. At the conclusion of the examination, the examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report.

In accordance with 10 CFR 2.790 of the Connissions regulations, a copy of this letter and the enclosure (s) will be placed in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely, caIGI:mt. SICNED BY L. A. REYES Luis A. Reyes, Chief Operations Branch

Enclosures:

1. Examination Report No. 50-237/0L-85-02
2. Examination (s)and AnswerKey(s)(SR0/R0) cc w/ enclosure:

D. L. Farrar, Director of Nuclear Licensing D. J. Scott, Plant Manager DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental Control Division B. Zank, Plant Training Mgr.

B. Boger, Branch Chief, OLB B. Gilbert, Project Manager, NRR 8508280228 850826 PDR ADOCK 05000237 RIII L RI G PDR Si jfin D ettner/pg i 1 nfyps 08/22/85 . y ff 'gb

/fWP 8lt