ML060750402

From kanterella
Revision as of 20:13, 7 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

E-mail: Fwd: Status of Oyster Creek LRA Draft RAIs (PD)
ML060750402
Person / Time
Site: Oyster Creek
Issue date: 02/17/2006
From: Beck G
Exelon Corp
To: Veronica Rodriguez
NRC/NRR/ADRO/DLR
References
%dam200606
Download: ML060750402 (13)


Text

Veronica Rodriguez - RE: FW: Status of Oyster Creek LRA draft RAls Page 1 l From: <George.Beck@exeloncorp.com>

To: <VMR1 @nrc.gov>

Date: 2/17/06 8:58AM

Subject:

RE: FW: Status of Oyster Creek LRA draft RAls Veronica, Now that we know the email addresses work I am sending the attachment to the initial note.

George


Original Message-----

From: Veronica Rodriguez @nrc.gov

Sent: Friday, February 17, 2006 8:49 AM To: Beck, George

Subject:

Re: FW: Status of Oyster Creek LRA draft RAls Thanks for the email - I will fax the RAls as soon as they get approved.

>>> <George.Beck~exeloncorp.com> 02/17/06 8:45 AM >>>

Veronica, Second attempt to send. I used capital letters the first time, maybe...

The fax number here in our temporary area at the site is 609-971-4545. We will be here until mid-day.

The fax number at Kennett Square is 610-765-5651. We will be back there on Monday.

George

> -----Original Message-----

> From: Beck, George

> Sent: Friday, February 17, 2006 8:12 AM

> To: 'VMR1 @nrc.com'

> Cc: Donnie Ashley (E-mail); Hufnagel Jr, John G

>

Subject:

Status of Oyster Creek LRA draft RAls

> Veronica,

> Attached is a table showing the status of the draft RAls. We have been using this table to keep track of each RAI "package". Hopefully, this will be helpful over the next few weeks.

> George

> 610-765-5631

>> <<Draft RAls in process - NRC copy 2-16-06.doc>>

                                                        • *******************.********.*****************

This e-mail and any of its attachments may contain Exelon Corporation proprietary information, which is privileged, confidential, or subject to copyright belonging to the Exelon Corporation family of Companies.

This e-mail is intended solely for the use of the individual or entity to which it is addressed. If you are not the intended recipient of this e-mail, you are hereby notified that any dissemination, distribution,

lVeronica Rodriguez - RE: FW: Status of Oyster Creek LRA draft RAls Page 2 copying, or action taken in relation to the contents of and attachments to this e-mail is strictly prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender immediately and permanently delete the original and any copy of this e-mail and any printout. Thank You.

........................................ *...........************

c:\temp\GW}00001 .TMP Page 1 l Mail Envelope Properties (43F5D66A.EB2: 20: 11954)

Subject:

RE: FW: Status of Oyster Creek LRA draft RAIs Creation Date: 2/17/06 8:56AM From: <George.Beck@exeloncorp.com>

Created By: George.Beck@exeloncorp.com Recipients nrc.gov TWGWPOOI.HQGWDOO1 VMR1 (Veronica Rodriguez)

Post Office Route TWGWPOO1.HQGWrDOO 1 nrc.gov Files Size Date & Time MESSAGE 2163 02/17/06 08:56AM Draft RAIs in process - NRC copy 2-16-06.doc 102400 Mime.822 144592 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard

Status as of 5:00 PM, 2/16/06 G. J. Beck Draft RAIs in process Electrical RAI # Rec'd Discussion Results of discussion Comments held w/ NRC D-RAI 2.5.2-1 1/18 1/31/06 Understand needed Discussion lead to response additional questions:

add'l draft questions rec'd 2/1/06 D-RAI 2.5.2-2 Understand needed response D-RAI 2.5.2.3-1 2/1 2/2/06 Understand needed response D-RAI 2.5.2.3-2 _ NRC will make wording changes Understand needed response D-RAI 2.5.2.5-1 NRC will make wording changes Understand needed response D-RAI 2.5.2.5-2 . NRC will make wording changes Understand needed response NRC reviewer - Vijay Goel Requested drawings (listed in UFSAR) emailed 2/2/06 Formal letter transmitting RAIs is in concurrence chain Page 1 of 10

Status as of 5:00 PM, 2/16/06 G. J.Beck Reactor Vessel Internals (aka Isolation Condenser, RPV, Feedwater CVB)

RAI # Rcc'd Discussion Results of discussion Comments I held w/ NRC D-RAI 3.1.1-1 10/18 2/2/06* Revised all all D-RAI 3.1.1-2 Withdrawn D-RAI 3.1.1-3 No change D-RAI 3.1.1-4 No change D-RAI 3.1.1-5 Revised - deleted part A D-RAI 3.1.1-6 Withdrawn D-RAI 3.1.1-7 No change D-RAI 3.1.2.1-1 Withdrawn D-RAI 3.1.2.1-2 No change D-RAI 3.1.2.1-3 No change D-RAI B. 1.9-1 No change D-RAI B. 1.9-2 No change D-RAI B. 1.9-3 No change D-RAI B. 1.9-4 D-RAI B. 1.9-5 No change D-RAI B. 1.9-6 Withdrawn D-RAI B. 1.9-7 No change D-RAI B.1.9-8 No change D-RAI B.1.9-9 Withdrawn D-RAI B.1.9-10 No change D-RAI B.1.9-1 E Revised (minor)

D-RAI B.1.23-1 Revised D-RAI B.1.23-2 Revised D-RAI B.1.23-3 Withdrawn NRC reviewer - Ganesh Chervenki Formal letter is in concurrence chain Page 2 of 10

Status as of 5:00 PM, 2/16/06 G. J. Beck Reactor Vessel NRC reviewer - Chris Sydnor Advance copy of rough draft received 2/2/06; "cleaned up" version (numbers, etc.) received 2/8/06 Mr. Ashley will arrange telcon We do need telcon; need to coordinate involvement of Greg Harttraft & Gary Stevens Page 3 of 10

Status as of 5:00 PM, 2/16/06 G. J. Beck Mechanical Systemns (aka Piping & Tanks)

RAI # Rcc'd Discussion Results of discussion Commcnts

. held w/ NRC D-RAI 3.4-1 1/18 all D-RAI 3.4-2 D-RAI 3.4-3 D-RAI 3.4-4 See Kevin's email of 1/31 D-RAI 3.4-5 D-RAI 3.4-6 .

D-RAI 3.4-7 D-RAI 3.4-8 D-RAI 3.4-9 D-RAI 3.2-1 D-RAI 3.2-2 D-RAI 3.2-3 D-RAI B.2.4-1 D-RAI B.2.4-2 D-RAI 4.7.1-1'_

D-RAI 4.7.1-2 D-RAI B.2.1-2 D-RAI B.2.1-2 NRC reviewer - Jai Rajan Prep meeting w/ Fred held Friday, 2/3/06 Mr. Ashley will arrange telcon Page 4 of 10

Status as of 5:00 PM, 2/16/06 G. J. Beck Fatigue Analysis (aka RPV & Fatigue)

RAI # Rec'd Discussion Results of discussion Comnients held w/ NRC D-RAI 4.3-1 1/18 2/14 Formal RAI all 4.-2214 Foml__

D-RAI 4.3-2 2/14 Formal RAI D-RAI 4.3-3 2/14 Formal RAI D-RAI 4.3-4 Not2/14 Formal RAI D-RAI 4.6-1 Not needed Formal RAT NRC reviewer - John Fair Telcon held I 1:00 AM, 2/14/06 Formal RAls will be issued Page 5 of 10

Status as of 5:00 PM, 2/16/06 G. J. Beck Rebar Corrosion (Pkg 24)

RAI Rec'd Discussion Results of discussion Comments held w/ NRC D-RAI 4.7.3-1 1/31 D-RAI 4.7.3-2 _ _

D-RAI 4.7.3-3 NRC reviewer - Hans Ashar Mr. Ashley will arrange telcon Drywell RAI # Rec'd Discussion Results of discussion Comments held w/ NRC D-RAI 4.7.2-1 12/28 During Formal RAI all AMP audit D-RAI 4.7.2-2 During Formal RAI l_ AMP audit D-RAI 4.7.2-3 During Formal RAI AMP audit D-RAI 4.7.2-4 During Formal RAI AMP audit NRC reviewer - Hans Ashar Formal letter transmitting RAls is in typing Page 6 of 10

Status as of 5:00 PM, 2/16/06 G. J. Beck Structural (Structures)

RAI # Rcc'd Discussion Results of discussion Comments Iheld w/ NRC D-RAI 2.4.1-1 12/28 2/8/06 RAI all D-RAI 2.4.1-2 D-RAI 2.4.2-1 .. ..

D-RAI 2.4.8-1 D-RAI 2.4.9-1 . Wording change to question D-RAI 3.5-1 ..

D-RAI 3.5-2 D-RAI 3.5-3 Wording change to question D-RAI 3.5-4 Typo in question will be fixed D-RAI 3.5-5 4.

D-RAI 3.5-6 .

D-RAI 3.5-7 D-RAI 3.5-8 Sub parts will be renumbered D-RAI 3.5-9 D-RAI 3.5-10 . ..

NRC reviewer - John Ma Formal letter transmitting RAIs is in typing C

Page 7 of 10

Status as of 5:00 PM, 2/16/06 G. J.Beck Section 2.3 (Reactor Internals/RPV/CS/Shutdown Cooling)

RAI # Rec'd Results of discussion Comments w/ NRC D-RAI 2.3.1.6-1 2/7 Formal RAI D-RAI 2.3.1.7-1 Formal RAI D-RAI 2.3.2.3-1 Withdrawn Do not have this component (LPCI Coupling)

D-RAI 2.3.3.36-1 Formal RAI (potential for withdrawal if we find sufficient info in LRA)

NRC reviewer - Muhammed Razzique Telcon held 2/16 Formal RAI expected ... TBD Bolting Integrity (NOTE: this is filed in "Structural" folder RAI # Rec'd Results of discussion Comments l_ w/ NRC D-RAI B.1.12 2/7 Formal RAI revised version rec'd NRC - reviewer - Andrea Keim This was discussed with Mr. Ashley on 2-15-05 and decision is to forego telecon discussion of draft question - question is clear.

Page 8 of 10

Status as of 5:00 PM, 2/16/06 G. J. Beck Generator Stator Cooling Water Chemistry & Boral Neutron Absorbing Material RAI # Rec'd Discussion Results of discussion Comments held w/ NRC D-RAI 3.3.2.1.16-1 2/7 2-15-06 Sub-question b.3 to be modified to fix typo and to request test results as well as procedures. Sub-question c to be eliminated. Sub-question d to be discussed by Mr.

Ashley with Mr. Lofaro to evaluate need for the question.

D-RAI B.2.3-1 2/7 2-15-06 Mr. Ashley to discuss AmerGen providing Stator coolant PBD to NRC, possibly eliminating this RAI.

NRC reviewer - Krzysztof Parczewski Telecon held 2-15 outcome described above - Mr. Ashley to discuss D-RAI B 2.3-1 further with Staff before decision on formal RAI

. I Page 9 of 10

Status as of 5:00 PM, 2/16/06 G. J. Beck Expected RAIs (per Donnie Ashley 2/7/06)

  • Non-class I bolting
  • Auxiliary Systems
  • Periodic Inspection Additional RAls are not limited to this list Page 10 of 10 I I