Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML052690388, ML052850300, ML053250326, ML053410352, ML053410369, ML053410372, ML053420167, ML053460234, ML053470213, ML053470434, ML053500440, ML053540079, ML060200084, ML060320211, ML060370508, ML060410649, ML060600122, ML060660177, ML060690026, ML060690130, ML060830564, ML060830567, ML060870126, ML060870147, ML060890080, ML060930255, ML060940146, ML060950408, ML060960563, ML060960568, ML060960602, ML061010639, ML061010644, ML061010646, ML061020614, ML061020616, ML061020638, ML061030419, ML061070304, ML061070306, ML061070307, ML061070309, ML061070310, ML061070319, ML061070321, ML061070329, ML061070395, ML061070398, ML061070399, ML061070403... further results
|
MONTHYEARML0726804681954-12-31031 December 1954 New Jersey Department of Environmental Protection, Division of Parks and Forestry, State Forest Service, New Jerseys Big Trees Project stage: Other ML0726705561963-01-31031 January 1963 Us Fish and Wildlife Service, 1963. Distribution of Shellfish Resources in Relation to the New Jersey Intracoastal Waterway -- Manasquan Inlet to Little Egg Harbor. Boston, Ma. January Project stage: Other ML0726405941972-11-17017 November 1972 Jersey Central Power & Light Company, Oyster Creek Nuclear Generating Station Environmental Report, Amendment 2 Project stage: Other ML0726406651978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration Project stage: Other ML0726703621978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Initial Progress Report, December 1966, Through Third Progress Report, January 1968 Project stage: Other ML0726703651978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Fourth Progress Report 1968 Through Sixth Progress Report 1970, Concluding Remarks Project stage: Other ML0726703681978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Seventh Progress Report, June 25, 1971, Through Eighth Progress Report, August 18, 1972 Project stage: Other ML0726703741978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Zooplankton of Barnegat Bay: the Effect of Oyster Creek Nuclear Power Plant Through Literature Cited Project stage: Other ML0726704911978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Appendix E Through Appendix F, Figure 10 Project stage: Other ML0726705501978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Appendix a Through Appendix C1, Figure C1-1 Project stage: Other ML0726801491978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Addendum to Appendix C1 Through Addendum to Appendix D1 Project stage: Other ML0726801691978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Preface Through Table 6.2-2 Project stage: Other ML0726801741978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Appendix C Continued Page C2-1 Through Page C6-51 Project stage: Other ML0726802291979-10-22022 October 1979 Letter from David N. Kinsey (New Jersey Department of Environmental Protection) Dated October 22, 1979 to Ivan R. Finfrock (Jersey Central Power & Light Company), NPDES Permit Renewal Application No. NJ0005550 Project stage: Other ML0726405991982-05-14014 May 1982 Jersey Central Power & Light Co. Boundary Map of Former Finninger Farm Project stage: Other ML0726705601986-12-12012 December 1986 Inventory of New Jerseys Estuarine Shellfish Resources, Joseph, J. W., Us Department of Commerce National Oceanic and Atmospheric Administration, National Marine Fisheries Service, December 12, 1986 Project stage: Other ML0726801891987-12-0909 December 1987 Joseph, J. W. 1987, Inventory of New Jerseys Estuarine Shellfish Resources, Us Department of Commerce National Oceanic and Atmospheric Administration National Marine Fisheries Service. Project No. 3-405-R Project stage: Other ML0726703911989-12-31031 December 1989 Lacey Township, Ocean County, New Jersey. 1989. Ocean County Water Quality Management Plan, Wastewater Management Plan Project stage: Other ML0726704221989-12-31031 December 1989 Usda. 1989. Soil Survey of Ocean County, New Jersey. Sheet Number 45 Project stage: Other ML0610206381990-11-26026 November 1990 Drywell Containment, Attachment 1 to Letter Dated 04/07/2006 Project stage: Other ML0610206141991-03-0404 March 1991 Letter Forwarding, an ASME Section Viii Evaluation of Oyster Greek Drywell for Without Sand Case Part 1 Stress Analysis, Attachment 2 to Letter Dated 04/07/06 Project stage: Other ML0610206161992-01-16016 January 1992 Letter Forwarding, ASME Section Viii Evaluation of the Oyster Creek Drywell, Part 2, Stability Analysis, Attachment 3 to Letter Dated 04/07/2006 Project stage: Other ML0702906681992-04-24024 April 1992 Evaluation Report on Structural Integrity of the Oyster Creek Drywell with Brookhaven National Laboratory Technical Evaluation Report - Attached Project stage: Other ML0726801841997-02-0404 February 1997 State of New Jersey Permit No. 1512-93-0052.3, .4, and .5, Permit to Dredge Project stage: Other ML0726804281997-09-30030 September 1997 Department of the Army, Corps of Engineers, Permit Number CENAP-OP-R-199701765-39 Project stage: Other ML0726704171997-10-31031 October 1997 State of New Jersey Department of Environmental Protection. the Management and Regulation of Dredging Activities and Dredged Material Disposal in New Jerseys Tidal Waters. October 1997 Project stage: Other ML0726703842000-04-25025 April 2000 Levin, S. 2000. Letter, Levin (Gpu Nuclear Inc.) to New Jersey Department of Environmental Protection. Application for Transfer of Ownership and of a Permit Project stage: Request ML0726804482002-05-15015 May 2002 New Jersey Department of Environmental Protection. 2002. List of State Flood Hazard Area Delineations. May 15 Project stage: Other ML0726803802003-05-15015 May 2003 Shellfish Stock Assessment of Little Egg Harbor Bay (Dsrt Proposal 2001011), Celestino, M. P., New Jersey Department of Environmental Protection, 15 May 2003 Project stage: Other ML0726803592003-12-31031 December 2003 Private Property and the Common Good, Anonymous, 2003, Powerpoint Presentation Project stage: Other ML0726704012004-01-31031 January 2004 Energy Information Administration. 2004. State Energy Profiles 2002. January. (Excerpt). Us Department of Energy Project stage: Other ML0726802382004-02-28028 February 2004 Clean, Safe, Reliable, the Economic Benefits of Oyster Creek Generating Station, February 2004 Project stage: Other ML0726804052004-07-0707 July 2004 Ecolsciences, Inc., 2004, Threatened and Endangered Species Habitat Impact Assessment for Oyster Greek Generation Station National Security Upgrades; Township of Lacey; Ocean County, New Jersey, Prepared for Amergen Energy Co., LLC Project stage: Other ML0726704042004-12-31031 December 2004 Energy Information Administration. 2004. State Energy Data 2002: Consumption. Table 7 Energy Consumption Estimates by Source, Selected Years, 160-2002, New Jersey. Us Department of Energy Project stage: Other ML0726705522004-12-31031 December 2004 New Jersey Department of Environmental Protection, 2004 Cafra Boundary Line Project stage: Other ML0726804182004-12-31031 December 2004 Energy Information Administration, 2004, Existing Generating Units in the United States by State, Company, and Plant, 2004, Us Department of Energy Project stage: Other ML0726703942005-07-19019 July 2005 Tompkins, H.B. 2005. Letter Tompkins (State of New Jersey, Department of Environmental Protection) to Brown (Amergen). Draft Surface Water Renewal Permit Action. Includes Public Notice, Fact Sheet, and Draft NJPDES Permit Project stage: Draft Other ML0726808302005-07-19019 July 2005 Ocean County Soil Conservation District, 2005, Soil Erosion and Sedimentation Control Certification; Upland Dredge Site, Scd 1302 Project stage: Other ML0520800482005-07-22022 July 2005 Application for Renewed Operating License Project stage: Request ML0726802022005-07-25025 July 2005 FEMA Floodzone Map for Lacey Township, Ocean County, Nj, Provided by Birdsall Engineering, Inc Project stage: Other ML0526903882005-09-23023 September 2005 Audit and Review Plan for Plant Aging Management Reviews and Programs at the Oyster Creek Generating Station Project stage: Other ML0527101572005-09-28028 September 2005 Request for Additional Information for the Review of the Oyster Creek Nuclear Generating Station, License Renewal Application (Tac No. MC7624) Project stage: RAI ML0528503002005-10-0505 October 2005 Audit and Review Plan for Plant Aging Management Reviews and Programs at the Oyster Creek Generating Station (Tac No. MC7624) Project stage: Other ML0529100912005-10-12012 October 2005 Response to NRC Request for Additional Information (RAI 2.5.1.19-1), Dated September 28, 2005, Related to Oyster Creek Generating Station License Renewal Application (Tac No. MC7624) Project stage: Response to RAI ML0610703042005-10-21021 October 2005 Email: Pictures? (PA) Project stage: Other ML0610703062005-11-0404 November 2005 Email: Emailing: Example NPDES Report.Pdf (PA) Project stage: Other ML0610703072005-11-0909 November 2005 Email: Emailing: Example NPDES Report.Pdf (PA) Project stage: Other ML0531400422005-11-0909 November 2005 Request for Additional Information for the Review of the Oyster Creek Nuclear Generating Station, License Renewal Application (Tac No. MC7624) Project stage: RAI ML0610703092005-11-0909 November 2005 Email: Emailing: Example NPDES Report.Pdf (PA) Project stage: Other ML0532004752005-11-11011 November 2005 Supplemental Response to NRC Request for Additional Information (RAI 2.5.1.19-1), Dated September 28, 2005, Related to Oyster Creek Generating Station License Renewal Application Project stage: Supplement 2002-05-15
[Table View] |
Text
AmerGen SM Michael P. GallagheT, PE Telephone 610.765.5958 An Exelon Company Vice President www.exeloncorp.com License Renewal Projects michaelp.gallagher@exeloncorp.com 10 CFR 50 ArnerGen 10 CFR 51 200 Exelon Way 10 CFR 54 KSA/2-E Kennett Square, PA 19348 2130-06-20284 April 4, 2006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219
Subject:
Commitments Associated with Containment (Drywell and Torus) Condition Monitoring Related to AmerGen Application for Renewed Operating License -
Oyster Creek Generating Station (TAC No. MC7624)
References:
- 1. Letter from C.N. Swenson (AmerGen Energy Company, LLC) to USNRC "Application for Renewed Operating License, Oyster Creek Generating Station," dated July 22, 2005
- 2. Letter 2130-05-20238 from C. N. Swenson to USNRC "Additional Commitments Associated with Application for Renewed Operating License -
Oyster Creek Generating Station," dated December 9, 2005 In Reference 1, AmerGen Energy Company, LLC (AmerGen) committed to manage the aging of the Oyster Creek Generating Station (OCGS) containment in accordance with its ASME Section Xl, Subsection IWE Program. In Reference 2, AmerGen made a commitment to perform certain inspections of the Drywell shell in the sand bed region to confirm that actions previously taken have eliminated corrosion that had been occurring in that area of the Oyster Creek Generating Station (OCGS) primary containment.
AmerGen is now committing to perform additional actions to provide further assurance that the Drywell shell will remain capable of performing its design functions throughout the license renewal period. These prior and new commitments are collectively detailed in the attached Enclosure.
A new commitment is also made with regard to inspecting the coating material applied to the inside of the OCGS containment torus. This commitment is included in the listing provided in the Enclosure.
A04
April 4, 2006 Page 2 of 2 The above-described commitments will be specifically included as part of Commitment 27 from Table A.5 of Reference 1. Table A.5 contained the complete listing of Regulatory Commitments associated with the OCGS License Renewal Application. For completeness, Table A.5 will be re-submitted to the NRC under separate cover at a later date, capturing these and other commitments (unrelated to the Oyster Creek primary containment) made during the NRC's review of the OCGS License Renewal Application.
If you have any questions regarding this information, please contact Fred Polaski, Manager, License Renewal, at 610-765-5935.
I declare under penalty of perjury that the foregoing is true and correct.
Respectfully, Executed on
__-0 ___
-__6_
Date Michael P. Gallagher Vice President, License Renewal Projects AmerGen Energy Company, LLC
Enclosure:
Regulatory Commitments cc:
Regional Administrator, USNRC Region I NRC Project Manager, NRR - License Renewal, Safety NRC Project Manager, NRR - License Renewal, Environmental, w/o Enclosure NRC Project Manager, OCGS, Part 50 NRC Senior Resident Inspector, OCGS Bureau of Nuclear Engineering, New Jersey Department of Environmental Protection Oyster Creek File No. 05040
ENCLOSURE REGULATORY COMMITMENTS
April 4, 2006 Page 1 of 3 ENCLOSURE - REGULATORY COMMITMENTS The following table identifies commitments made in this document. Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for information and are not regulatory commitments.
Committed One-Time Commitment Date or Action Programmatic Outage (Yes/No)
(Yes/No)
- 1. Prior to the period of extended operation, Prior to period No Yes AmerGen will perform additional visual of extended inspections of the epoxy coating that was operation and applied to the exterior surface of the Drywell every ten shell in the sand bed region, such that the years during coated surfaces in all 10 Drywell bays will the period of have been inspected at least once. In extended addition, the Inservice Inspection (ISI) operation Program will be enhanced to require inspection of 100% of the epoxy coating every 10 years during the period of extended operation. These inspections will be performed in accordance with ASME Section Xl, Subsection IWE. Performance of the inspections will be staggered such that at least three bays will be examined every other refueling outage.
- 2. Ultrasonic Testing (UT) thickness Prior to period No Yes measurements of the drywell shell in the of extended sand bed region will be performed on a operation and frequency of every 10 years. The initial at 10-year inspection will occur prior to the period of intervals extended operation. The UT measurements thereafter will be taken from the inside of the drywell at the same locations where UT measurements were performed in 1996.
The inspection results will be compared to previous results.
Statistically significant deviations from the 1992, 1994, and 1996 UT results will result in corrective actions that include the following:
Perform additional UT measurements to confirm the readings.
Notify NRC within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of confirmation of the identified condition.
Conduct visual inspection of the
April 4, 2006 Page 2 of 3 Committed One-Time Commitment Date or Action Programmatic Outage (Yes/No)
(Yes/No) external surface in the sand bed region in areas where any unexpected corrosion may be detected.
Perform engineering evaluation to assess the extent of condition and to determine if additional inspections are required to assure drywell integrity.
Perform operability determination and justification for operation until next inspection.
These actions will be completed prior to restart from the associated outage.
- 3. Consistent with current practice, a Refueling No Yes strippable coating will be applied to the outages prior reactor cavity liner to prevent water intrusion to and during into the gap between the drywell shield wall the period of and the drywell shell during periods when extended the reactor cavity is flooded.
operation
- 4. The reactor cavity seal leakage trough Periodically No Yes drains and the drywell sand bed region drains will be monitored for water leakage.
- 5. A visual examination of the drywell shell in Prior to the Yes, if Yes, if the drywell floor inspection access trenches period of equipment maintained will be performed to assure that the drywell extended restored to within IWE steel remains intact. If degradation is operation original Inspection identified, the drywell shell condition will be configuration.
Program evaluated and corrective actions taken as necessary. These surfaces will either be inspected as part of the scope of the ASME Section Xl, Subsection IWE inspection program or they will be restored to the original design configuration using concrete or other suitable material to prevent moisture collection in these areas.
- 6. The coating inside the torus will be Every other No Yes visually inspected in accordance with ASME refueling Section Xi, Subsection IWE, per the outage prior Protective Coatings Program.
to and during the period of extended operation
April 4, 2006 Page 3 of 3 Committed One-Time Commitment Date or Action Programmatic Outage (Yes/No)
(Yes/No)
- 7. AmerGen will conduct UT thickness Every other No Yes measurements in the upper regions of the refueling drywell shell every other refueling outage at outage prior the same locations as are currently to and during measured.
the period of extended operation