Category:Status Report
Jump to navigation
Jump to search
Category Used between: 29 June 1976 to 18 February 2026
Plant
University
Fuel Processing
- BWX Technologies (0)
- Barnwell (0)
- Claiborne (0)
- Consolidated Interim Storage Facility (0)
- Eagle Rock (0)
- Erwin (3)
- Framatome ANP Richland (0)
- Global Nuclear Fuel (0)
- HI-STORE (0)
- Holtec (0)
- Orano USA (0)
- Paducah (0)
- Paducah Gaseous Diffusion Plant (0)
- Portsmouth Gaseous Diffusion Plant (0)
- Triso-X (0)
- West Valley Demonstration Project (3)
- Wood River Junction (0)
Laboratory
- 05000470 (0)
- Battelle Memorial Institute (0)
- Dow Chemical Company (0)
- General Atomics (5)
- Hermes (0)
- Idaho National Laboratory (0)
- Knolls Atomic Power Laboratory (0)
- Los Alamos National Laboratory (0)
- Lynchburg Research Center (0)
- National Bureau of Standards Reactor (0)
- National Institute of Standards and Technology (0)
- National Renewable Energy Lab (0)
- Northwest Medical Isotopes (0)
- Oak Ridge National Laboratory (0)
- PM-1 (0)
- PM-2A (0)
- Pacific Northwest National Laboratory (0)
- Plum Brook (45)
- SHINE Medical Technologies (2)
- SM-1 (0)
- SM-1A (0)
- Sandia National Laboratories (0)
- Tuxedo (0)
- U.S. Geological Survey (0)
- Vanowen (0)
- Waltz Mill (0)
Hospital
- Advocate Illinois (0)
- Avera McKennan Hospital (0)
- Banner Boswell Medical Center (0)
- Bard Brachytherapy (0)
- Dermatology of Seattle and Bellevue (0)
- Fred Hutchinson Cancer Center (0)
- George Washington Hospital (0)
- Karmanos Cancer Institute (0)
- Kennedy Memorial Hospital (0)
- Lincoln Memorial Hospital (0)
- Northwestern Memorial Hospital (0)
- Piedmont Hospital (0)
- UMass Memorial Health Medical Center (0)
- University Hospitals of Cleveland (0)
- West Virginia University Hospital (0)
Manufacturer
- 05200045 (0)
- Aalo Atomics (0)
- Braun Intertec Corporation (0)
- Electric Boat (0)
- Martinez Refining Company (0)
- Mistras Group (0)
- Reliable Testing Services (0)
- Sacyr Construction (0)
- Screaming Eagle Coal (0)
- Tilden-Mine (0)
Agency
Pages in category "Status Report"
The following 200 pages are in this category, out of 3,045 total.
(previous page) (next page)0
- 0CAN021405, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)
- 0CAN021406, Units 1 and 2, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)
- 0CAN021502, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees)
- 0CAN021503, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)
- 0CAN062301, Status of Actions to Return to Compliance
- 0CAN081402, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees)
- 0CAN081503, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) (Order EA-12-049)
3
- 3F0222-01, ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)
- 3F0316-02, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2015
- 3F0317-03, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2016
- 3F0318-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2017
- 3F0319-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2018
- 3F0320-03, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2019
- 3F0321-06, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2020
- 3F0322-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2021
- 3F0323-02, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2022
- 3F0324-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2023
A
- AEP-NRC-2011-22, Submittal of Decommissioning Funding Status Report
- AEP-NRC-2013-72, Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- AEP-NRC-2014-16, Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licensees with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- AEP-NRC-2014-17, Second Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.
- AEP-NRC-2014-66, Third Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- AEP-NRC-2015-13, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- AEP-NRC-2015-16, Decommissioning Funding Status Report
- AEP-NRC-2023-15, Decommissioning Funding Status Report
B
- BSEP 14-0005, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- BSEP 14-0133, First Six Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
- BSEP 15-0008, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- BSEP 15-0044, Second Six Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
- BSEP 15-0063, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- BSEP 15-0064, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- BSEP 15-0100, Phase 1 and Phase 2 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
- BSEP 16-0006, Sixth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- BSEP 16-0007, Sixth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- BSEP 16-0042, Fourth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)
- BSEP 16-0111, (Bsep), Unit Nos. 1 & 2, Fifth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident .
- BSEP 17-0043, Sixth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
- BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
- BVY 13-076, Vermont Yankees First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- BVY 14-014, Vermont Yankees Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- BVY 14-015, Vermont Yankees Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- BVY 14-065, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) and Request to Rescind Order
- BVY 15-016, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Orders Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-51) and Mitigation Strategies for Beyond-Design-Basis
- BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022
- BVY 24-013, Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 2023
- BVY-03-025, Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc. for Year Ending December 31, 2002 - 10 CFR 50.75(f)(1)
- BVY-05-033, Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31,2004 - 10 CFR 50.75(f)(1)
C
- CNL-13-144, Third Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request
- CNL-14-008, The Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2014 Status Report
- CNL-14-028, Second Six Month Status Report in Response to Order No. EA-12-051, Spent Fuel Pool Instrumentation
- CNL-14-029, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant
- CNL-14-030, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- CNL-14-032, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CNL-14-050, Fourth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request
- CNL-14-063, The Tennessee Valley Authority Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2014 Status Report
- CNL-14-131, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant
- CNL-14-132, Third Six-Month Status Report and Revised Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events for Bro
- CNL-14-133, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)(TAC Nos
- CNL-14-134, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order Number EA-12-049) for Watts Bar Nucle
- CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12
- CNL-14-191, Compliance Status Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049
- CNL-14-195, The Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2014 Status Report
- CNL-14-222, First Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident
- CNL-15-018, Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2015 Status Report
- CNL-15-035, Fourth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CNL-15-036, Fourth Six-Month Status Report in Response to the March 1, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- CNL-15-037, Fourth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CNL-15-038, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- CNL-15-058, Fifth Status Update of Planned Actions to Facilitate Maintenance of 6.9 Kilovolt and 480 Volt Shutdown Boards at Sequoyah, Units 1 and 2
- CNL-15-082, Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2015 Status Report
- CNL-15-159, Fifth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CNL-15-160, Fifth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- CNL-15-175, Fifth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CNL-15-254, Third Six-Month Status Report and Phase 1 and Phase 2 Overall Integrated Plan in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation
- CNL-15-259, Eleventh Progress Update on Improved Flood Mitigation System Project
- CNL-16-036, Sixth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CNL-16-098, Fourth Six-Month Status Report in Response to the June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
- CNL-16-132, Seventh Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
- CNL-16-182, Fifth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
- CNL-17-016, Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CNL-17-021, Decommissioning Funding Status Report
- CNL-17-031, Annual Insurance Status Report
- CNL-17-051, Bellefonte Nuclear Plant (Bln), Unit 2 - Status Update Regarding Construction Permit CPPR-123
- CNL-17-072, Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update
- CNL-17-077, Sixth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109)
- CNL-17-107, Browns Ferry, Units 1, 2, and 3 - Ninth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order No.
- CNL-17-107, Ninth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order No. EA-12-049)
- CNL-17-138, Plants Seventh Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
- CNL-18-017, Tenth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
- CNL-18-025, Annual Insurance Status Report
- CNL-18-084, Eighth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
- CNL-18-093, Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update
- CNL-18-122, Status Regarding the Improved Flood Mitigation System Project
- CNL-18-136, Plants: Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update
- CNL-19-015, Final Update on Progress of Facility Modifications for MSIV Leak Rate
- CNL-19-046, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update and Commitment Changes
- CNL-19-094, Status Regarding the Improved Flood Mitigation System Project
- CNL-19-135, Tennessee Valley Authority Browns Ferry Nuclear Plant - Ninth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe
- CNL-20-020, Annual Insurance Status Report
- CNL-20-088, Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update
- CNL-21-030, Decommissioning Funding Status Report
- CNL-21-032, Watt Bar Nuclear Plant, Units 1 and 2 - Annual Insurance Status Report
- CNL-21-048, Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Miilstone Status Update
- CNL-21-097, Status Regarding the Improved Flood Mitigation System Project
- CNL-22-052, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status
- CNL-22-070, Status Regarding the Improved Flood Mitigation System Project
- CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update
- CNL-23-022, Decommissioning Funding Status Report
- CNL-23-064, Hydrologic Engineering Center River Analysis System Project Milestone Status Update
- CNL-24-007, Annual Insurance Status Report
- CNRO-2005-00022, Entergy Operations, Inc., Status of Decommissioning Funding Report
- CNRO-2005-00028, Entergy Operations, Inc., Status of Decommissioning Funding Report Refilling
- CNRO-2007-00018, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc. for Year Ending December 31, 2006 - 10 CFR 50.75(f)(1)
- CNRO-2011-00001, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc
- CNRO-2012-00007, & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc
- CNRO-2013-00006, Decommissioning Funding Status Report - Entergy Operations, Inc
- CNRO-2017-00009, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)
- CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report
- CNRO-2018-00014, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2017, Per 10 CFR 50.82(a)(8)(vii)
- CNRO-2019-00005, Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc
- CNRO-2019-00006, Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc
- CNRO-2019-00007, And Waterford 3 Steam Electric Station - Decommissioning Funding Status Report
- CNS-14-020, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CNS-14-025, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- CNS-14-086, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CNS-14-093, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- CNS-15-013, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- CNS-15-071, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- CNS-15-080, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CP-201300390, Decommissioning Report
- CP-201301046, First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CP-201301047, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- CP-201500248, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CP-201500850, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- CP-202300144, (CPNPP) - Decommissioning Report
- CY-05-089, Decommissioning Funding Assurance
- CY-06-065, Final Status Survey Final Report - Phase III, Book 8 of 8, Appendix A7, Survey Unit Release Record 9531-0000, South End of Peninsula
- CY-06-128, Final Status Survey Final Report Phase III, Rev 1, Appendix A5 Survey Unit Release Record 9527-0004, East Mountain Side
- CY-06-148, Final Status Survey (FSS) Final Report - Phase V
- CY-07-077, Final Status Survey (FSS) Final Report - Phase VII
- CY-07-089, Final Status Survey Final Report - Phase VII - Chapter 10
- CY-07-104, To the Final Status Survey Reports for Phase VI and VII
- CY-07-106, To Final Status Survey, Final Report Phase V, Appendix A12, Survey Unit Release Record, Book 13 of 13; Including Covers for Books 3 - 12 of 13
- CY-09-005, Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.75
- CY-12-009, Redacted - Connecticut Yankee, Decommissioning Funding Assurance Status Report- 10CFR 50.75
- CY-13-017, Connecticut Yankee, Haddam Neck Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste
- CY-13-018, Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report
- CY-13-047, Of the Haddam Neck Plant Post-Shutdown Decommissioning Activities Report
- CY-14-012, Connecticut Yankee Atomic Power Company - Haddam Neck Plant Independent Spent Fuel Storage Installation
- CY-15-008, ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste
- CY-16-012, ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste
- CY-17-010, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste
- CY-18-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report
- CY-18-005, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste
- CY-19-006, Independent Spent Fuel Storage Installation Decommissioning Funding Assurance Status Report
- CY-19-007, Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste
- CY-20-003, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report
- CY-20-004, Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste
- CY-21-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste
- CY-22-004, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste
- CY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report
- CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste
- CY-24-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report
- CY-25-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste
D
- DCL-13-033, Decommissioning Funding Report
- DCL-13-080, Pacific Gas and Electric Companys First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- DCL-14-015, Second Six-Month Status Report in Response to March 12, 2012. Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- DCL-15-026, Fourth Six-Month Status Report in Response to March 12, 2012, Commsission Order Modifying Licesnes with Regard to Requirements for Mititgstion Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- DCL-15-028, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- DCL-15-098, Pacific Gas and Electric Companys Fifth Six-Month Status Report in Response to March 12. 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- DCL-15-099, Fifth Six-Month Status Report in Response to March 12. 2012. Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- DCL-16-002, Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- DCL-16-003, Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
- DCL-16-025, Sixth Six-Month Status Report in Response to March 12. 2012. Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- DCL-19-085, Material Status Report for the Period Ending August 31, 2019
- DCL-20-086, Material Status Report for the Period Ending August 31, 2020
- DCL-22-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2
- DCL-22-080, Material Status Report for the Period Ending August 31, 2022
- DCL-25-082, Materials Status Report for the Period Ending August 31, 2025
E
- E900-03-016, Rev 0 to Calculation E900-03-016, Shinka Discharge & Intake Tunnels FSS Survey Design, Appendices a - C to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Intak
- E900-03-032, Rev 0 to Calculation E900-03-032, Top of Seal Chamber 3 - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces - Seal Chamber Roofs SS17 (1&2) &
- E900-04-004, To Calculation E900-04-004, Cv Tunnel Unistrut Survey Design, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Cv Steam Tunnel SS22
- E900-04-006, Rev 0 to Calculation E900-04-006, Cv Yard Boulder and Soil Lift Survey Designs, Appendices D - N to Final Status Survey Report for Saxton Nuclear Experimental Corp Containment Vessel Yard Excavation - Soil and Structural Remnants
- E900-04-007, Rev. 0 to Calculation E900-04-007, Discharge Tunnel Survey Design for Class 1 Areas, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces -Discharge Tunnel SSI,
- E900-04-012, Rev 0 to Calculation E900-04-012, Cv Tunnel & Top of Seal Chambers 1 & 2 Survey Design, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces - Seal Chamber Roof
- E900-04-013, Rev 0 to Calculation E900-04-013, Cv Yard Survey Design - North East Side of Cv, Appendices a - D to Final Status Survey Report for Saxton Nuclear Experimental Corp Containment Vessel Yard Excavation - Soil and Structural Remnants
- E900-04-015, Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces Discharge Tunnel Transition Area SS23, SS25, Appendix B SNEC Calculation Sheet
- E900-04-021, Rev. 0 to Calculation E900-04-021, Assessment of Survey Results for Discharge Tunnel Class 1 Areas, Appendix E to Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces -Discha
- E900-05-009, To Calculation E900-05-009, Westinghouse and Adjacent Areas Open Land - OL2 - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL2
- E900-05-011, To Calculation E900-05-011, Westinghouse and Adjacent Areas MA8-5 Concrete Survey Design, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL2
- E900-05-014, Rev 0 to Calculation E900-05-014, SNEC Plant Area Open Land - OL1 - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corp Open Land Area OL1
- E900-05-015, Rev. 1 to Calculation E900-05-015, OL1 Paved & Miscellaneous Concrete Surfaces MA8, PF1, DB5, DB1, SS12, SS24-Survey Design, Appendices B - D to Final Status Survey Report for Saxton Nuclear Experimental Corp Residual Concrete in OL1
- E900-05-028, Rev 2 to Calculation E900-05-028, Open Land FSS Design - OL7 Paved Surfaces & Concrete, Appendices a & B to Final Status Survey Report for Saxton Nuclear Experimental Corporation OL7 Paved Surfaces and Concrete
- E900-05-029, To Calculation E900-05-029, Assessment of Cv Tunnel Unistrut, Appendix C to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Cv Steam Tunnel SS22
- E900-05-032, Rev 2 to Calculation E900-05-032, Open Land FSS Design - OL3 Paved Surfaces & Concrete, Appendices a - B to Final Status Survey Report for Saxton Nuclear Experimental Corporation 0L3 Paved Surfaces and Concrete
- E910-05-002, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL4. Appendix G
- E910-05-003, Experimental Corporation Final Status Survey Report for OL6 and OL10
- E910-05-016, Calculation E900-05-018, Rev 0, Miscellaneous Area FSS Design - MA2, Appendix a with Attachments to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area MA2
- E910-05-018, Calculation E900-05-020, Rev 0, OL9 Open Land Area - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL9