Other: ML052690388, ML052850300, ML060200084, ML060320211, ML060370508, ML060410649, ML060600122, ML060660177, ML060690026, ML060690130, ML060830564, ML060830567, ML060870126, ML060870147, ML060890080, ML060930255, ML060940146, ML060950408, ML060960563, ML060960568, ML060960602, ML061010639, ML061010644, ML061010646, ML061020614, ML061020616, ML061020638, ML061030419, ML061070304, ML061070306, ML061070307, ML061070309, ML061070310, ML061070319, ML061070321, ML061070329, ML061070395, ML061070398, ML061070399, ML061070403, ML061070429, ML061070430, ML061070432, ML061150320, ML061150330, ML061160161, ML061380647, ML061420086, ML061420088, ML061420089... further results
|
MONTHYEARML0726804681954-12-31031 December 1954 New Jersey Department of Environmental Protection, Division of Parks and Forestry, State Forest Service, New Jersey'S Big Trees Project stage: Other ML0726705561963-01-31031 January 1963 Us Fish and Wildlife Service, 1963. Distribution of Shellfish Resources in Relation to the New Jersey Intracoastal Waterway -- Manasquan Inlet to Little Egg Harbor. Boston, Ma. January Project stage: Other ML0726405941972-11-17017 November 1972 Jersey Central Power & Light Company, Oyster Creek Nuclear Generating Station Environmental Report, Amendment 2 Project stage: Other ML0726406651978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration Project stage: Other ML0726703621978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Initial Progress Report, December 1966, Through Third Progress Report, January 1968 Project stage: Other ML0726703651978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Fourth Progress Report 1968 Through Sixth Progress Report 1970, Concluding Remarks Project stage: Other ML0726703681978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Seventh Progress Report, June 25, 1971, Through Eighth Progress Report, August 18, 1972 Project stage: Other ML0726703741978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Zooplankton of Barnegat Bay: the Effect of Oyster Creek Nuclear Power Plant Through Literature Cited Project stage: Other ML0726704911978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Appendix E Through Appendix F, Figure 10 Project stage: Other ML0726705501978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Appendix a Through Appendix C1, Figure C1-1 Project stage: Other ML0726801491978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Addendum to Appendix C1 Through Addendum to Appendix D1 Project stage: Other ML0726801691978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Preface Through Table 6.2-2 Project stage: Other ML0726801741978-12-31031 December 1978 Jersey Central Power & Light Company. 1978. Oyster Creek and Forked River Nuclear Generating Stations 316(a) and (B) Demonstration, Appendix C Continued Page C2-1 Through Page C6-51 Project stage: Other ML0726802291979-10-22022 October 1979 Letter from David N. Kinsey (New Jersey Department of Environmental Protection) Dated October 22, 1979 to Ivan R. Finfrock (Jersey Central Power & Light Company), NPDES Permit Renewal Application No. NJ0005550 Project stage: Other ML0726405991982-05-14014 May 1982 Jersey Central Power & Light Co. Boundary Map of Former Finninger Farm Project stage: Other ML0726705601986-12-12012 December 1986 Inventory of New Jersey'S Estuarine Shellfish Resources, Joseph, J. W., Us Department of Commerce National Oceanic and Atmospheric Administration, National Marine Fisheries Service, December 12, 1986 Project stage: Other ML0726801891987-12-0909 December 1987 Joseph, J. W. 1987, Inventory of New Jersey'S Estuarine Shellfish Resources, Us Department of Commerce National Oceanic and Atmospheric Administration National Marine Fisheries Service. Project No. 3-405-R Project stage: Other ML0726703911989-12-31031 December 1989 Lacey Township, Ocean County, New Jersey. 1989. Ocean County Water Quality Management Plan, Wastewater Management Plan Project stage: Other ML0726704221989-12-31031 December 1989 Usda. 1989. Soil Survey of Ocean County, New Jersey. Sheet Number 45 Project stage: Other ML0610206381990-11-26026 November 1990 Drywell Containment, Attachment 1 to Letter Dated 04/07/2006 Project stage: Other ML0610206141991-03-0404 March 1991 Letter Forwarding, an ASME Section Viii Evaluation of Oyster Greek Drywell for Without Sand Case Part 1 Stress Analysis, Attachment 2 to Letter Dated 04/07/06 Project stage: Other ML0610206161992-01-16016 January 1992 Letter Forwarding, ASME Section Viii Evaluation of the Oyster Creek Drywell, Part 2, Stability Analysis, Attachment 3 to Letter Dated 04/07/2006 Project stage: Other ML0702906681992-04-24024 April 1992 Evaluation Report on Structural Integrity of the Oyster Creek Drywell with Brookhaven National Laboratory Technical Evaluation Report - Attached Project stage: Other ML0726801841997-02-0404 February 1997 State of New Jersey Permit No. 1512-93-0052.3, .4, and .5, Permit to Dredge Project stage: Other ML0726804281997-09-30030 September 1997 Department of the Army, Corps of Engineers, Permit Number CENAP-OP-R-199701765-39 Project stage: Other ML0726704171997-10-31031 October 1997 State of New Jersey Department of Environmental Protection. the Management and Regulation of Dredging Activities and Dredged Material Disposal in New Jersey'S Tidal Waters. October 1997 Project stage: Other ML0726703842000-04-25025 April 2000 Levin, S. 2000. Letter, Levin (Gpu Nuclear Inc.) to New Jersey Department of Environmental Protection. Application for Transfer of Ownership and of a Permit Project stage: Request ML0726804482002-05-15015 May 2002 New Jersey Department of Environmental Protection. 2002. List of State Flood Hazard Area Delineations. May 15 Project stage: Other ML0726803802003-05-15015 May 2003 Shellfish Stock Assessment of Little Egg Harbor Bay (Dsrt Proposal #2001011), Celestino, M. P., New Jersey Department of Environmental Protection, 15 May 2003 Project stage: Other ML0726803592003-12-31031 December 2003 Private Property and the Common Good, Anonymous, 2003, Powerpoint Presentation Project stage: Other ML0726704012004-01-31031 January 2004 Energy Information Administration. 2004. State Energy Profiles 2002. January. (Excerpt). Us Department of Energy Project stage: Other ML0726802382004-02-28028 February 2004 Clean, Safe, Reliable, the Economic Benefits of Oyster Creek Generating Station, February 2004 Project stage: Other ML0726804052004-07-0707 July 2004 Ecolsciences, Inc., 2004, Threatened and Endangered Species Habitat Impact Assessment for Oyster Greek Generation Station National Security Upgrades; Township of Lacey; Ocean County, New Jersey, Prepared for Amergen Energy Co., LLC Project stage: Other ML0726704042004-12-31031 December 2004 Energy Information Administration. 2004. State Energy Data 2002: Consumption. Table 7 Energy Consumption Estimates by Source, Selected Years, 160-2002, New Jersey. Us Department of Energy Project stage: Other ML0726705522004-12-31031 December 2004 New Jersey Department of Environmental Protection, 2004 Cafra Boundary Line Project stage: Other ML0726804182004-12-31031 December 2004 Energy Information Administration, 2004, Existing Generating Units in the United States by State, Company, and Plant, 2004, Us Department of Energy Project stage: Other ML0726703942005-07-19019 July 2005 Tompkins, H.B. 2005. Letter Tompkins (State of New Jersey, Department of Environmental Protection) to Brown (Amergen). Draft Surface Water Renewal Permit Action. Includes Public Notice, Fact Sheet, and Draft NJPDES Permit Project stage: Draft Other ML0726808302005-07-19019 July 2005 Ocean County Soil Conservation District, 2005, Soil Erosion and Sedimentation Control Certification; Upland Dredge Site, Scd #1302 Project stage: Other ML0726802022005-07-25025 July 2005 FEMA Floodzone Map for Lacey Township, Ocean County, Nj, Provided by Birdsall Engineering, Inc Project stage: Other ML0526903882005-09-23023 September 2005 Audit and Review Plan for Plant Aging Management Reviews and Programs at the Oyster Creek Generating Station Project stage: Other ML0528503002005-10-0505 October 2005 Audit and Review Plan for Plant Aging Management Reviews and Programs at the Oyster Creek Generating Station (Tac No. MC7624) Project stage: Other ML0610703042005-10-21021 October 2005 Email: Pictures? (PA) Project stage: Other ML0531201572005-11-0101 November 2005 Position Paper on Oyster Creek Ngs Cooling Water System Project stage: Request ML0610703062005-11-0404 November 2005 Email: Emailing: Example NPDES Report.Pdf (PA) Project stage: Other ML0610703072005-11-0909 November 2005 Email: Emailing: Example NPDES Report.Pdf (PA) Project stage: Other ML0610703092005-11-0909 November 2005 Email: Emailing: Example NPDES Report.Pdf (PA) Project stage: Other ML0610704292005-11-22022 November 2005 Email: Confirmation of Site Audit Information (Ing) Project stage: Other ML0610704322005-11-22022 November 2005 Email: Archaeological Sites in the Vicinity of Oyster Creek Generating Station (Ing) Project stage: Other ML0726704252005-11-30030 November 2005 Atlantic States Marine Fisheries Commission (Asmfc). 2005. Atlantic Croaker Stock Assessment and Peer Review Reports Project stage: Other ML0610703102005-12-0505 December 2005 Email: Status of Requested Documents (PA) Project stage: Other 2002-05-15
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML22235A7862022-08-23023 August 2022 Acceptance Review: Exemption Request from 10 CFR 20, Appendix G, LLW Shipping Investigation Requirements ML21181A1882021-06-30030 June 2021 E-mail from S. Johnston, Holtec, to A. Snyder and F. Bower, NRC - Oyster Creek Nuclear Generating Station - Readiness Status for ISFSI Only Inspection ML21175A2092021-06-24024 June 2021 E-mail from A. Sterdis to P. Longmire - Oyster Creek Nuclear Generating Station: ISFSI-only Physical Security Plan (Stating Implementation Intent) ML21162A3602021-06-11011 June 2021 E-mail Response from the State of New Jersey Regarding the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status ML21162A1172021-06-11011 June 2021 E-mail to HDI: Acceptance Review - FOF Exemption ML21168A0172021-06-10010 June 2021 E-mail from HDI: RAI Response ML21161A2572021-06-0707 June 2021 State Consultation: ISFSI-only Physical Security Plan (Email Response) ML21175A0712021-06-0202 June 2021 Issuance of Request for Additional Information: Oyster Creek Nuclear Generating Station. Request for Amendment to Technical Specifications ML21148A0562021-05-27027 May 2021 E-mail to State of New Jersey Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status ML21132A3182021-05-12012 May 2021 E-Mail from V. Gubbi, DEP to Z. Cruz, NRC - Oyster Creek Nuclear Generating Station - State of New Jersey Response to the Pending Revision to the Defueled Technical Specifications to Reflect Independent Spent Fuel Storage Installation Only ML21132A0312021-05-11011 May 2021 E-mail to State of New Jersey Informing of the Pending Revision to the Physical Security Plan to Reflect Independent Spent Fuel Storage Installation Only Status ML21119A1422021-04-28028 April 2021 E-mail to State of New Jersey Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status ML21113A0742021-04-23023 April 2021 Acceptance Review Email - April 20, 2021 Oyster Creek Request for Exemption from 10 CFR Part 73 Requirements Due to Covid ML21099A0382021-04-0808 April 2021 Email from Z. Cruz to A. Sterdis - Request for Additional Information - HDI Request for Approval of Oyster Creek Nuclear Generating Station Independent Spent Fuel Storage Installation Facility Only Emergency Plan ML21085A4872021-03-26026 March 2021 E-mail from Z. Cruz to A. Sterdis - Acceptance Review: Oyster Creek Nuclear Generating Station - Request for Approval of Independent Spent Fuel Storage Installation Only Permanently Defueled Technical Specifications ML21064A2432021-03-0505 March 2021 Email from Z. Cruz to A. Sterdis Acceptance Review_ Oyster Creek Nuclear Generating Station - Request for Approval of Independent Spent Fuel Storage Installation Facility Only Emergency Plan and Emergency Action Level Scheme ML21064A2392021-03-0202 March 2021 E-mail from Z. Cruz to A. Sterdis Acceptance Review - Oyster Creek Nuclear Generating Station - Request for Approval of Independent Spent Fuel Storage Installation Only Physical Security Plan ML20345A1462020-12-0909 December 2020 E-mail - Response to Request for Additional Information: HDI Request for One-Time Exemption from Part 73, Appendix B FOF Requirements ML20335A3112020-11-30030 November 2020 Request for Additional Information Regarding Request for a one-time Exemption from Part 73, Appendix B Requirements for Oyster Creek Nuclear Generating Station ML20332A1472020-11-24024 November 2020 Acceptance Review: November 20 2020 Exemption Request from 10 CFR Part 73 Appendix B Requirements for Oyster Creek ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20279A5082020-10-0505 October 2020 Email to Holtec - Response to Notification of Oyster Creek Onsite Property Insurance Coverage ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20134H8742020-05-12012 May 2020 Request for Additional Information Regarding Request for Temporary Exemption from Part 73, Appendix B Requirements ML20133J9182020-05-11011 May 2020 Acceptance Review Email - Oyster Creek Request for Exemption from Part 73 Qualification Requirements ML20120A0252020-04-22022 April 2020 NRR E-mail Capture - (External_Sender) Oyster Creek Sea Turtle Handling and Conservation Recommendation Obligations NRC-2019-0073, Response from NEIMA Local Community Advisory Board Questionnaire 10-30-2019 R Discenza2019-10-30030 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-30-2019 R Discenza ML19344C8022019-10-20020 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-20-2019 a Dressler ML19344C8002019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 W Mcmullin ML19344C7982019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 M Noto ML19344C7992019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 s Feldman ML19344C7932019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 C Bischoff ML19344C7962019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 G Adams ML19344C7912019-10-0808 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-08-2019 J Branciforte ML19344C7902019-10-0808 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-08-2019 Anonymous ML19344C7892019-10-0505 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-05-2019 P Dressler ML19263D1222019-09-20020 September 2019 for Your Action Request for Additional Information Hdi Oyster Creek PSDAR ML19214A0452019-08-0202 August 2019 NRC to NMFS, Revised Proposed Action for Oyster Creek Endangered Species Act Section 7 Consultation ML19182A3422019-07-0101 July 2019 Transaction ML19178A0702019-06-26026 June 2019 Email to State of New Jersey - Oyster Creek - Request Comments on Proposed Amendment to Remove Reference to the Oyster Creek Cyber Security Plan and Update License Condition 2.C.(4) in the Renewed Facility License ML19196A3422019-06-20020 June 2019 Email: Courtesy Notice on the Issuance of the Oyster Creek License Transfer and Exemption (Sierra Club) ML19196A3342019-06-20020 June 2019 Email: Courtesy Notice on the Issuance of the Oyster Creek License Transfer and Exemption ML19162A2242019-06-11011 June 2019 NRC to NMFS, NRC Responses to NMFS Requests for Additional Information for Oyster Creek ESA Section 7 Consultation NRC-2018-0237, Comment from Paul Dressler of the Concerned Citizens for Lacey Coalition, Regarding the Oyster Creek Nuclear Plant License Transfer Application2019-06-0707 June 2019 Comment from Paul Dressler of the Concerned Citizens for Lacey Coalition, Regarding the Oyster Creek Nuclear Plant License Transfer Application ML19155A1182019-06-0404 June 2019 Incoming E-mail from State of New Jersey on the Oyster Creek Exemption for Reduced Insurances and Use of Decommissioning Trust Fund for Spent Fuel Management and Site Restoration ML19155A1192019-06-0404 June 2019 State of New Jersey Comments - Oyster Creek Conforming Amendment Associated with the Oyster Creek Generating Station License Transfer Application ML19154A0582019-05-31031 May 2019 E-mail Response from State of New Jersey Dated May 31, 2019, Notification-and-Request-Oyster Creek License Transfer Application L-2018-LLM-0002 ML19158A2912019-05-30030 May 2019 NRR E-mail Capture - Oyster Creek ESA Consultation: Information Requests from NMFS ML19158A2772019-05-28028 May 2019 NRR E-mail Capture - Oyster Creek ESA Consultation: Information Requests from NMFS ML19148A4392019-05-24024 May 2019 NMFS to NRC, Requests for Additional Information to Support Oyster Creek Reinitiated Section 7 Consultation 2022-08-23
[Table view] |
Text
Mathew - commitment Page I From: Roy Mathew To: Lofaroebnl.gov Date: 5/3/06 9:06AM
Subject:
commitment see attached.
Please note that previous drywell commitments are in letter dated April 4, 2006 (ML060970288).
IodespGW000.M Page;I]
Page 1V I c:temp\GW1O0OO1 .TMP Mail Envelope Properties (4458AAF0.6F7: 13: 35632)
Subject:
commitment Creation Date: Wed, May 3, 2006 9:06 AM From: Roy Mathew Created By: RKM(anrc.gov Recipients Action Date & Time bnl.gov Transferred 05/03 9:08 AM Lofaro (Lofaroaftbn.gov)
Post Office Delivered Route bnl.gov Files Size Date & Time MESSAGE 514 Wednesday, May 3, 2006 9:06 AM 2130-06-20328 Supplemental commitments 5-01-06.pdf 170547 Wednesday, May 3, 2006 8:38 AM Options Auto Delete: No Expiration Date: None Notify Recipients: No Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened
I RyMte -2100202Supeetlcm itmns:=10.d Paged11 Page 1 I Roy Mathew 2130-06-20328 Supplemental commitments 5-01-06.pdf AmerGen Energy Company, LIC www.exeloncorp.com Amer~n.g An Exelon Company 2oo Exeion Way KennettSquare, PA19348 10 CFR 50 10 CFR 51 10 CFR 54 2130-06-20328 May 1, 2006 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219
Subject:
Supplemental Commitments Associated with AmerGen Application for Renewed Operating Ucense - Oyster Creek Generating Station (TAC No. MC7624)
In recent months, the NRC Staff has been performing Audit activities associated with the AmerGen Energy Company LLC (AmerGen) application for a renewed operating license for Oyster Creek Generating Station (Oyster Creek). The Enclosure attached to this letter formalizes several commitments made verbally to the NRC during the course of these Aging Management Program (AMP) and Aging Management Review (AMR) Audit activities during the week of April 17, 2006.
In addition, note that Aging Management Program descriptions submitted as part of Appendix A of the LIcense Renewal Application (I.e., the UFSAR supplement information) affected during the NRC review process will be updated and submitted on a schedule supporting the NRC Staff's completion of Safety Evaluation Report activities.
Similarly, an update to the License Renewal Commitment LUst, Appendix A.5 of the LRA, will be provided, which will reflect the post-Audit integrated set of Aging Management Program related license renewal commitments.
If you have any questions regarding this information, please contact Fred Polaski, Manager, License Renewal, at 610-765-5935.
I declare under penalty of perjury that the foregoing is true and correct.
Respectfully, Executed on 05-/- @
Date Michael P. Galiagher Vice President, Ucense Renewal Projects AmerGen Energy Company, LLC
I nB-. RA~.,L-... nan d nI! na n a ,.. . - - -.
I ruV IVILIIaW- - Z 1I.U-UD-ZLUMZ5 unnoIemPlnrTq C~mmMIMantc 5-01 -06 nc r
-***-r-*-***-**-****-**--*l--*
D---
Fa ')
I May 1, 2006 Page 2 of 2
Enclosure:
Regulatory Commitments cc: Regional Administrator, USNRC Region I NRC Project Manager, NRR - Ucense Renewal, Safety NRC Project Manager, NRR - License Renewal, Environmental, w/o Enclosure NRC Project Manager, OCGS, Part 50 NRC Senior Resident Inspector, OCGS Bureau of Nuclear Engineering, New Jersey Department of Environmental Protection Oyster Creek File No. 05040
I Roy Mathew - 2130-06-20328 Supplemnental commitments 5-01-06.pdf Page 3 1 I Roy Mathew 2130-06-20328 SuoDlemental commitments 5-O1-06.odf
- Paae 3!
ENCLOSURE REGULATORY COMMITMENTS
IV_..---
-a --..
Roy Mainew - 213U0-06-2bu3Z supplemental commitments b-01-05-ndt Pnae A I i rov iviatnew - L1.3U-U-U3Lb uoiementai commitments -U1-O6ndt Ptri A1 May 1, 2006 Page I of 2 ENCLOSURE - REGULATORY COMMITMENTS CommItted One-lime Commitment Date or Action Programmatic Outage (yes/No) (YeslNo)
- 1. As noted in ArnerGen's 4/4/06 letter to Every other No Yes NRC, AmerGen will perform torus coating refueling Inspections in accordance with ASME outage prior Section Xl Subsection IWE every other to and during refueling outage prior to and during the the period of period of extended operation. This new extended commitment clarifies that the scope of each operation of these Inspections will Include the wetted area of all 20 torus bays. Should the current towus coating system be replaced, the Inspection frequency and scope will be re-evaluated. Inspection scope will, as a minimum, meet the requirements of ASME Section XI, Subsection IWE.
- 2. AmerGen will develop refined acceptance Prior to the No Yes criteria and thresholds for entering torus next torus coating defects and unacceptable pit depths coating into the Corrective Action Process for further inspection, evaluation. These improvements will be which is also incorporated into the Inspection prior to the implementing documents prior to the next extended performance of these Inspections, which Is period of also prior to the period of extended operation operation.
- 3. AmerGen will replace the previously un- Prior to the Yes No replaced, buried safety-related ESW piping period of prior to the period of extended operation. extended operation
- 4. The One-Time Inspection program will Prior to the Yes No also include destructive or nondestructive period of examination of one (1) socket welded extended connection using techniques proven by past operation.
Industry experience to be effective for the Identification of cracking In small bore socket welds. Should an Inspection opportunity not occur (e.g., socket weld failure or socket weld replacement), a susceptible small-bore socket weld will be examined either destructively or non-destructively prior to entering the period of extended operation.
3 y- M- -
%-iuplemental commitments 5-01 -063-ndf Poino r. I 1 rgy Andrew- Z-1 -U-U0-/ZUJZ0 -:I May 1. 2006 Page 2 of 2
- 5. In addition to AmerGen's previous Prior to the Yes No commitment to perform one-time visual period of examinations of the drywell shell in the areas extended exposed by the trenches In the bottom of the operation drywell (reference AmerGen 4/4/06 letter to NRC), one-time Ultrasonic Testing (UT) measurements will be taken to confirm the adequacy of the shell thickness in these areas, providing further confidence that the drywell remains capable of performing its intended function.
- 6. During the next UT inspections to be Prior to the Yes No performed on the drywell sand bed region period of (reference AmerGen 4/4106 letter to NRC), extended an attempt will be made to locate and operation evaluate some of the locally thinned areas Identified in the 1992 Inspection from the exterior of the drywell. This testing will be performed using the latest UT methodology with existing shell paint in place. The UT thickness measurements for these locally thinned areas may be taken from either inside the drywell or outside the drywell (sand bed region) to limit radiation dose to as low as reasonably achievable (ALARA).
- 7. Certification by a Professional Engineer of July 31, 2006 Yes No the reactor vessel design specification and design reports prepared for the fatigue activities associated with the Oyster Creek License Renewal Application will be performed by July 31, 2006. 1 1 1