Oyster Creek Program Basis Document (Pbd) B.1.09 BWR Vessel Internals
ML060370508
Person / Time
Site: Oyster Creek
Issue date: 02/06/2006
From: Hufnagel J
AmerGen Energy Co, Exelon Corp
To: Ashley D
NRC/NRR/ADRO/DLR/RLRA
Ashley DJ
Shared Package
ML053530280 List:
References
%dam200604, TAC MC7624
Download: ML060370508 (36)


Text

[-6.-sh A Iey ---P-B--DAMP-B-A .-O'9'-

- Page D. Ashley PBD AMP B.1 .09 Page 11 From: <john.hufnagel @exeloncorp.com>

To: <djal @nrc.gov>

Date: 02/06/2006 3:02:40 PM

Subject:

PBD AMP B.1.09 Donnie, Attached is an electronic copy of AMP PBD B.1.09. We believe this should address the draft question B.1 .9-10.

The file is in Word format, password protected to prevent inadvertent modification. Please let me know is this addresses the question.

We understand that this Word file will be treated similarly to the other AMP PBDs transmitted for Auditing purposes. Thanks, Donnie.

- John.

<<<PBD B.1.09 BWR Vessel Internals Rev O.doc>>

This e-mail and any of its attachments may contain Exelon Corporation proprietary information, which is privileged, confidential, or subject to copyright belonging to the Exelon Corporation family of Companies.

This e-mail is intended solely for the use of the individual or entity to which it is addressed. If you are not the intended recipient of this e-mail, you are hereby notified that any dissemination, distribution, copying, or action taken in relation to the contents of and attachments to this e-mail is strictly prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender immediately and permanently delete the original ahd any copy of this e-mail and any printout. Thank You.

CC: <michaelj.may~exeloncorp.com>, <George.Beck @exeloncorp.com>

I c:\temp\GW}00001.TMP Page 1 1 MailEnvelopeProperties (43E7AB4E.BBA:12:15290)

Subject:

PBD AMP B. 1.09 Creation Date: 02/06/2006 3:01:56 PM From: <john.hufnagel @exeloncorp.com>

Created By: john.hufnagel @exeloncorp.com Recipients nrc.gov OWGWPOO1.HQGWDOO1 DJA1 (D. Ashley) exeloncorp.com George.Beck CC michaelj.may CC Post Office Route OWGWPO01.HQGWDOO1 nrc.gov exeloncorp.com Files Size Date & Time MESSAGE 1339 06 February, 2006 3:01:56 PM TEXT.htm 2059 PBD B. 1.09 BWR Vessel Internals Rev 0.doc 178176 Mime.822 249923 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard

[ D. Ashley - PBD 13.1.09 BWR Vessel Intemals Rev O.doc Page 1-

10. Ashley - PBD B.1 .09 BWR Vessel Internals Rev O.doc Pagelj F-Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 1 of 32 BWR Vessel Internals PROGRAM BASIS DOCUMENT PBD-AMP-B.1 .09 Revision 0 BWR VESSEL INTERNALS GALL PROGRAM XL.M9 - BWR VESSEL INTERNALS Prepared By:

Reviewed By:

Program Owner Review:

Technical Lead Approval:

[ P. Ashley - PBD B.1.09 BWR Vessel Intemals Rev O.doc Page 2 q Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 2 of 32 BWR Vessel Internals Summary of Revisions:

Rev. Number Reason for the Revision(s) 0 Initial Issue

r D.Ashley - PBD B.1.09 BWR Vessel Internals Rev O.doc Page 31 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 3 of 32 BWR Vessel Internals TABLE OF CONTENTS 1.0 PURPOSE AND METHODOLOGY 4 1.1 Purpose 4 1.2 Methodology 4 2.0 PROGRAM DESCRIPTION 5 2.1 Program Description 5 2.2 Overall NUREG-1801 Consistency 6 2.3 Summary of Exceptions to NUREG-1 801 6 2.4 Summary of Enhancements to NUREG-1 801 6 3.0 EVALUATIONS AND TECHNICAL BASIS 7 3.1 Scope of Program 8 3.2 Preventive Actions 13 3.3 Parameters Monitored or Inspected 14 3.4 Detection of Aging Effects 15 3.5 Monitoring and Trending 17 3.6 Acceptance Criteria 18 3.7 Corrective Actions 19 3.8 Confirmation Process 20 3.9 Administrative Controls 21 3.10 Operating Experience 22 3.11 Conclusion 23

4.0 REFERENCES

28 4.1 Generic to Aging Management Programs 28 4.2 Industry Standards 28 4.3 Oyster Creek Program References 31 5.0 Tables 22 5.1 Aging Management Program Implementing Documents 32 5.2 Aging Management Review Results 33 6.0 Attachments 35 6.1 LRA Appendix A 6.2 LRA Appendix B

r D.- -Asihley -615D R.1'. 09 B WRessel Internals Rev O.doc Page 41]

[7Aiiiy - PBD B.1.09 BWR Vessel Internals Rev O.doc Page 4 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 4 of 32 BWR Vessel Internals 1.0 PURPOSE AND METHODOLOGY 1.1 Purpose The purpose of this Program Basis Document is to document and evaluate those activities of the Oyster Creek BWR Vessel Internals aging management program that are credited for managing cracking initiation and growth in reactor internal components as part of Oyster Creek License Renewal to meet the requirements of the License Renewal Rule 10 CFR 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants."

This includes the following:

  • The identification of the scope of the program;
  • The evaluation of program elements against NUREG-1801;
  • The review of Operating Experience to demonstrate program effectiveness;
  • The identification of required program enhancements; and
  • The identification of Oyster Creek documents required for implementing the program.

1.2 Methodology The nuclear power plant License Renewal Rule 10 CFR 54,

'Requirements for Renewal of Operating Licenses for Nuclear Power Plants," describes the License Renewal process and provides requirements for the contents of License Renewal Applications. 10 CFR 54.21 (a)(3) states:

"For each structure and component identified in paragraph (a)(1) of this section, demonstrate that the effects of aging will be adequately managed so that the intended function(s) will be maintained consistent with the Current Licensing Basis (CLB) for the period of extended operation."

The NRC and the industry identified 10 program elements that are useful in describing an aging management program and then demonstrating its effectiveness. These program elements are described in Appendix A.1, Section A.1.2.3 of the Standard Review Plan. NUREG-1 801 uses these program elements in Section Xl to

D.

U^ Ashley - PBD B.1.09 BWR Vessel Internals Rev O.doc Page 5 2 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 5 of 32 BWR Vessel Internals describe acceptable aging management programs.

This Program Basis Document also provides a comparison of the credited Oyster Creek program with the elements of the corresponding NUREG-1801 Chapter Xl program XL.M9 - BWR Vessel Internals. Project Level Instruction PLI-8 "Program Basis Documents" prescribes the methodology for evaluating Aging Management Programs. An evaluation of Oyster Creek's aging management program criteria or activities to those of the NUREG-1801 program elements is performed and a conclusion is reached concerning consistency for each individual program element. A demonstration of overall program effectiveness is made after all program elements are evaluated. Required program enhancements are documented. An overall determination is made as to consistency with the program description in NUREG-1 801.

2.0 PROGRAM DESCRIPTION 2.1 Program Description NUREG-1 801:

The program includes:

(a) inspection and flaw evaluation in conformance with the guidelines of applicable and staff-approved boiling water reactor vessel and internals project (BWRVIP) documents, and (b) monitoring and control of reactor coolant water chemistry in accordance with the guidelines of BWRVIP-29 (Electric Power Research Institute [EPRI] TR-103515) to ensure the long-tenn integrity and safe operation of boiling water reactor (BWR) vessel internal components.

Oyster Creek:

The Oyster Creek BWR Vessel Internals program includes:

a) inspection and flaw evaluation, performed in conformance with the guidelines of applicable staff-approved Boiling Water Reactor Vessel and Internals Project (BWRVIP) documents, as well as the requirements of Section Xl of the ASME Boiler and Pressure Vessel Code (Reference OC-5 Program Plan, Reactor Internals Program, Inspection Plans 7.1 - 7.15), and b) monitoring and control of reactor coolant water chemistry, performed in accordance with BWRVIP-130: "BWR Vessel and Internals Project BWR Water Chemistry Guidelines (EPRI TR-1008192)", which is the 2004 revision of "BWR Water

[ 15.Ashley- P-B-D PLI.09 BWR Vessel Internals Rev O.doc Page ae 6,l Ashe*PB.~

wD .0 BW Vese Inenl Re Oo Oyster Creek PBD-AMP-B.11.09, Revision 0 License Renewal Project Page 6 of 32 BWR Vessel Internals Chemistry Guidelines," (

Reference:

OC-5, Program Plan, Reactor Internals Program, Paragraph 1.3).

2.2 Overall NUREG-1801 Consistency The Oyster Creek BWR Vessel Internals program is an existing program that is consistent with NUREG-1 801 aging management program Xl.M9 - BWR Vessel Intemals with the exceptions and enhancements listed below.

2.3 Summary of Exceptions to NUREG-1 801 NUREG 1801 indicates that water chemistry control is in accordance with BWRVIP 29 for water chemistry in BWRs.

BWRVIP 29 references the 1993 revision of EPRI TR 103515, RBWR Water Chemistry Guidelines.' The Oyster Creek water chemistry programs are based on BWRVIP-1 30: "BWR Vessel and Internals Project BWR Water Chemistry Guidelines (EPRI TR-1008192)", which is the 2004 revision of "BWR Water Chemistry Guidelines". For justification of exceptions to the water chemistry program see the Oyster Creek Water Chemistry aging management program, PBD-AMP-B.1.02.

NUREG-1 801 program XI.M4 references ASME Section Xl, Table IWB 2500-1 (2001 edition, including the 2002 and 2003 Addenda).

Oyster Creek ISI program is based on the 1995 (including 1996 Addenda) version of ASME Section Xl. For justification of exceptions to the ISI program see the ASME Section Xl In-service Inspection, Subsections IWB, IWC, and IWD aging management program, PBD-AMP-B.11.01.

2.4 Summary of Program Enhancements The Oyster Creek BWR Vessel Intemals program will be enhanced to include inspections of the steam dryer in accordance with BWRVIP-139.

The inspections recommended in NUREG-1 801 program XI.M9 for the top guide will be added to the program. The fluence at the top guide has exceeded the IASCC threshold (5x1W02 n/cm2, E>1 MeV). For those locations that have exceeded this threshold, after entering the period of extended operation ten (10) percent of the top guide locations will be inspected using enhanced visual inspection technique, EVT-1, within 12 years, with one-half of the inspections (5 percent of locations) to be completed within 6 years after entering the period of extended operation.

[ D. Ashley - PBD B.1.09 BWR Vessel Internals Rev OdocP Page 7 ]

Oyster Creek PBD-AMP-B.1 .09, Revision 0 License Renewal Project Page 7 of 32 BWR Vessel Internals Oyster Creek has roll repaired two leaking CRD stub tubes. Oyster Creek is pursuing a code case within the ASME to make these roll expansion repairs permanent. Once the ASME and the NRC approve the code case, the Oyster Creek BWR Reactor Internals program will be revised to make these repairs permanent. If the code case is not approved, the program will be changed to use a permanent repair acceptable to the NRC.

The existing Oyster Creek BWR Vessel Intemals program is found to be consistent with NUREG-1 801, with the exceptions and enhancements described above, and is found adequate to assure that the reactor vessel internal components will continue to perform their intended functions consistent with the current licensing basis through the period of extended operation.

3.0 EVALUATIONS AND TECHNICAL BASIS Note This section is organized by quoting the relevant NUREG-1 801 Chapter Xi program element (September 2005 version) followed by the related Oyster Creek program attributes and a conclusion of the comparison.

Where applicable, the NUREG-1 801 program element was separated into logical sub-elements and addressed accordingly.

Implementing procedure references are included in 0 for information purposes. This information from the source procedure has been either directly extracted from the procedure or summarized for inclusion into this PBD.

3.0 Scope of Program NUREG-1 801:

The program is focused on managing the effects of cracking due to stress corrosion cracking (SCC), intergranular stress corrosion cracking (IGSCC), or irradiation assisted stress corrosion cracking (IASCC). The program contains preventive measures to mitigate SCC, IGSCC, or JASCC, inservice inspection (ISI) to monitor the effects of cracking on the intended function of the components, and repair and/or replacement as needed to maintain the ability to perform the intended function of BWR vessel internals.

The BWRVIP documents provide generic guidelines intended to

[D. Ashley - PBD B.1.09 BWR Vessel Intemals Rev O.doc Pa-ge 81 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 8 of 32 BWR Vessel Internals present the applicable inspection recommendations to assure safety function integrity of the subject safety-related reactor pressure vessel internal components. The guidelines include information on component description and function; evaluate susceptible locations and safety consequences of failure; provide recommendations for methods, extent, and frequency of inspection; discuss acceptable methods for evaluating the structural integrity significance of flaws detected during these examinations; and recommend repair and replacement procedures.

The various applicable BWRVIP guidelines are as follows:

a) Core shroud: BWRVIPs-07, -63, and -76 provide guidelines for inspection and evaluation; BWRVIP-02, Rev. 2, provides guidelines for repair design criteria.

b) Core plate: BWRVIP-25 provides guidelines for inspection and evaluation; BWRVIP-50 provides guidelines for repair design criteria.

c) Shroud support: B WRVIP-38 provides guidelines for inspection and evaluation; BWRVIP-52 provides guidelines for repair design criteria.

d) Low-pressure coolant injection (LPCI) coupling: BWRVIP-42 provides guidelines for inspection and evaluation; BWRVIP-56 provides guidelines for repair design criteria.

e) Top guide: BWRVIP-26 provides guidelines for inspection and evaluation; BWRVIP-50 provides guidelines for repair design criteria. Additionally, for top guides with neutron fluence exceeding the IASCC threshold (5E20, E>l MeV) prior to the period of extended operation, inspect five percent (5%0) of the top guide locations using enhanced visual inspection technique, EVT-1 within six years after entering the period of extended operation. An additional 5% of the top guide locations will be inspected within twelve years after entering the period of extended operation. Alternatively, if the neutron fluence for the limiting top guide location is projected to exceed the threshold for IASCC after entering the period of extended operation, inspect 5% of the top guide locations (EVT-1) within six years after the date projected for exceeding the threshold. An additional 5% of the top guide locations will be inspected within twelve years after the date projected for exceeding the threshold. The top guide inspection locations are those that have high neutron fluence exceeding the IASCC threshold. The extent of the examination and its frequency will be based on a ten percent sample of the total population, which includes all

[ D. Ashley - PBD B.1.09 BWR Vessel Internals Rev O.doc Page 9 il Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 9 of 32 BWR Vessel Internals grid beam and beam-to-beam crevice slots.

O Core spray: BWRVIP- 18 provides guidelines for inspection and evaluation; B WRVIP- 16 and 19 provides guidelines for replacement and repair design criteria, respectively.

g) Jet pump assembly: BWRVIP-4 1provides guidelines for inspection and evaluation; BWRVIP-51 provides guidelines for repair design criteria.

h) Control rod drive (CRD) housing: BWRVIP-47 provides guidelines for inspection and evaluation; BWRVIP-58 provides guidelines for repair design criteria.

i) Lower plenum: BWRVIP-47 provides guidelines for inspection and evaluation; B WRVIP-57 provides guidelines for repair design criteria for instrument penetrations.

j) In addition, BWRVIP-44 provides guidelines for weld repair of nickel alloys; BWRVIP-45 provides guidelines for weldability of irradiated structural components.

Oyster Creek:

The Oyster Creek BWR Vessel Internals program manages the effects of cracking due to stress corrosion cracking (SCC),

intergranular stress corrosion cracking (IGSCC), and irradiation-assisted stress corrosion cracking (IASCC). The program includes measures to prevent or mitigate SCC, IGSCC, and IASCC; inservice inspection activities (ISI) to monitor the effects of cracking on the intended function of the components; and repair and/or replacement activities as needed to maintain the ability of BWR vessel internal components to perform their intended functions.

Adhering to the requirenments of the Oyster Creek BWR Water Chemistry program reduces the susceptibility of the reactor internals components to cracking due to SCC or IGSCC as described paragraph 3.2 below. The applicable and approved BWRVIP inspection and evaluation documents are used at Oyster Creek to provide inspection recommendations to assure safety function integrity of the subject safety-related reactor pressure vessel internal components. The Oyster Creek BWR Vessel Internals program uses the guidance of the BWRVIP documents for evaluation of susceptible locations. The program also utilizes the recommendations for methods, extent, and frequency of inspection and acceptable methods for evaluating the structural integrity significance of flaws detected during these examinations.

The applicable BWRVIP repair documents are also used to prepare repair and/or replacement procedures.

[u. Ashley - P1D B.1.09 BWR Vessel Internals Rev O.doc P 10]

Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 10 of 32 BWR Vessel Internals The Oyster Creek BWR Vessel Internals program uses the following BWRVIP guidelines to prevent or mitigate cracking in the components specified below:

a) Core Shroud: Inspection and Flaw Evaluation: BWRVIP-76 and BWRVIP-104 (

Reference:

OC-5, Program Plan -

Reactor Internals, Inspection Plan 7.3, Core Shroud);

Repair: BWRVIP-02 (

Reference:

ER-AB-331-1001, Paragraph 3.1.2, Repair Design Guidelines) (Note: BWRVIP-07 and BWRVIP-63 have been superseded by BWRVIP-76).

b) Core Plate: Inspection and Flaw Evaluation: BWRVIP-25

(

Reference:

OC-5, Program Plan - Reactor Internals, Inspection Plan 7.4, Core Plate); Repair: BWRVIP-50

(

Reference:

ER-AB-331-1001, Paragraph 3.1.2, Repair Design Guidelines).

c) Shroud Support: Inspection and Evaluation: BWRVIP-38 and BWRVIP-104 (

Reference:

OC-5, Program Plan - Reactor Internals, Inspection Plan 7.5, Shroud Support); Repair:

BWRVIP-52 (

Reference:

ER-AB-331-1001, Paragraph 3.1.2, Repair Design Guidelines).

d) BWRVIP-42 is not applicable since no LPCI Coupling is present at Oyster Creek since it is a BWR-2 design.

e) Top Guide: Inspection and Evaluation: BWRVIP-26

(

Reference:

OC-5, Program Plan - Reactor Internals, Inspection Plan 7.2, Top Guide); Repair: BWRVIP-50

(

Reference:

ER-AB-331-1001, Paragraph 3.1.2, Repair Design Guidelines). The top guide inspection locations include those that have neutron fluence exceeding the IASCC threshold of 5 x 1020 n/cm2. The OC Reactor Internals program will inspect ten (10) percent of the top guide locations after entering the period of extended operation, including all grid beam and beam-to-beam crevice slots, using enhanced visual inspection technique, EVT-1 within 12 years, with one-half of the inspections (5 percent of locations) to be completed within 6 years after entering the period of extended operation. The altemative inspection schedule suggested in NUREG 1801 XI.M9 for the top guide is not applicable to Oyster Creek, since the fluence threshold has already been exceeded for the top guide components.

f) Core Spray: Inspection and Evaluation: BWRVIP-1 8

(

Reference:

OC-5, Program Plan - Reactor Internals, Inspection Plan 7.1, Core Spray Spargers and Annulus Piping); Repair: BWRVIP-19; Replacement: BWRVIP-16

R0. Ashley - PBD B.1.09 BWR Vessel Internals Rev O.doc Page 11 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 11 of 32 BWR Vessel Internals

(

Reference:

ER-AB-331-1001, Paragraph 3.1.2, Repair Design Guidelines).

g) BWRVIP-41 is not applicable since no jet pumps exist at Oyster Creek since it is a BWR-2 design.

h) Control Rod Drive housing: Inspection and Evaluation:

BWRVIP-47 (

Reference:

OC-5, Program Plan - Reactor Internals, Inspection Plan 7.14, Stub Tubes, CRD Housings); Repair: BWRVIP-58 (

Reference:

ER-AB-3311-1001, Paragraph 3.1.2, Repair Design Guidelines).

i) Lower Plenum: Inspection and Evaluation: BWRVIP-47 and BWRVIP-17 (

Reference:

OC-5, Program Plan- Reactor Internals, Inspection Plan 7.14, Stub Tubes, CRD Housings; Repair: BWRVIP-57 (

Reference:

ER-AB-331-1001, Paragraph 3.1.2, Repair Design Guidelines).

j) Repair and replacement activities, if needed, are performed in accordance with ASME Section Xl requirements, consistent with the recommendations of the appropriate BWRVIP repair/replacement guidelines For nickel alloy repairs: BWRVIP-44 would; for weld repairs of irradiated structural components BWRVIP-45 would be used. (

Reference:

Procedure ER-AB-331, "BWR RX Internals Management Program Activities").

k) The Oyster Creek BWR Vessel Intemals program also inspects the following Steam Dryers and Feedwater Sparger to manage cracking, using ASME Section Xl inspection requirements and BWRVIP guidelines where applicable (

References:

OC-5, Inspection Plans 7.10 and 7.12)

ExceDtions to NUREG-1 801. Element 1:

None.

Enhancements to NUREG-1 801. Element 1:

The Oyster Creek BWR Vessel Internals program will be enhanced to include inspections of the steam dryer in accordance with BWRVIP-1 39.

The inspections recommended in NUREG-1801 program XI.M9 for the top guide will be added to the program. The fluence at the top guide has exceeded the IASCC threshold (5x1 020 n/cm2, E>1 MeV). For those locations that have exceeded this threshold, ten

I D. Ashley - PBD B.1.09 BWR Vessel Internals Rev O.doc Page 12 ,

Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 12 of 32 BWR Vessel Internals (10) percent of the top guide locations will be inspected after entering period of extended operation using enhanced visual inspection technique, EVT-1, within 12 years, with one-half of the inspections (5 percent of locations) to be completed within 6 years after entering the period of extended operation.

Oyster Creek has roll repaired two leaking CRD stub tubes. Oyster Creek is pursuing a code case within the ASME to make these roll expansion repairs permanent. Once the ASME and the NRC approve the code case, the Oyster Creek BWR Reactor Internals program will be revised to make these repairs permanent. If the code case is not approved, the program will be changed to use a permanent repair acceptable to the NRC.

Comparison and Evaluation

Conclusion:

With enhancements, this program element is consistent with NUREG-1 801, Element 1, Scope of Program.

3.1 Preventive Actions NUREG-1 801:

Maintaining high water purity reduces susceptibility to cracking due to SCC or IGSCC. Reactor coolant water chemistry is monitored and maintained in accordance with the guidelines in BWRVIP-29 (EPRI TR-103515). The program description and the evaluation and technical basis of monitoring and maintaining reactor water chemistry are presented in Chapter XI.M2, 'Water Chemistry."

Oyster Creek:

The Oyster Creek water chemistry programs are based on BWRVIP-130: "BWR Vessel and Internals Project BWR Water Chemistry Guidelines", which replaces BWRVIP-29. Water chemistry monitoring and maintenance are implemented through the station's water chemistry procedures (

Reference:

OC-5, Program Plan, Reactor Internals Program, paragraph 1.3).

Exceptions to NUREG-1 801. Element 2:

NUREG 1801 indicates that water chemistry control is in accordance with BWRVIP-29 for water chemistry in BWRs.

BWRVIP 29 references the 1993 revision of EPRI TR 103515, "BWR Water Chemistry Guidelines." The Oyster Creek water chemistry programs are based on BWRVIP-130: "BWR Vessel and Internals Project BWR Water Chemistry Guidelines", which is the

r U.ASniey - FRU t.1 .us MWR Vessel Internals Rev 0.doc Page 13, Oyster Creek PBD-AMP-B.l.09, Revision 0 License Renewal Project Page 13 of 32 BWR Vessel Internals 2004 revision of "BWR Water Chemistry Guidelines'. For justification of exceptions to the water chemistry program see the Oyster Creek Water Chemistry aging management program, PBD-AMP-B.1 .02.

Enhancements to NUREG-1 801. Element 2:

None.

Comparison and Evaluation

Conclusion:

This program element is consistent with NUREG-1 801, Element 2, Preventive Actions, with the exception noted.

3.2 Parameters Monitored or Inspected NUREG-1 801:

a. The program monitors the effects of cracking on the intended function of the component by detection and sizing of cracks by inspection in accordance with the guidelines of applicable and approved BWRVIP documents and the requirements of the American Society of Mechanical Engineers (ASME) Code, Section Xl, Table IWB 2500-1 (2001 edition' including the 2002 and 2003 Addenda).
b. An applicant may use the guidelines of BWRVIP-62 for inspection relief for vessel internal components with hydrogen water chemistry provided such relief is submitted under the provisions of 10 CFR 50.55a and approved by the staff.

Oyster Creek:

a) The Oyster Creek BWR Vessel Internals program monitors the effects of cracking on the intended function of internals components through detection and sizing of cracks by inspections performed in accordance with the guidelines of applicable and approved BWRVIP documents, as well as the requirements of ASME Section Xl. The inspections are performed consistent with the recommendations of applicable and approved BWRVIP guidelines (as described in paragraph 2.1 above), as well as the requirements of ASME Section Xl, Table IWB 2500-1 (1995 addition through 1996 addenda).

(

Reference:

OC-5, Inspection Plans 7.1 - 7.15).

An applicant may rely on a different version of the ASME Code, but should justify such use. An applicant may wish to refer to the SOC for an update of 10 CFR § 50.55a to justify use of a more recent edition of the Code.

r D. Ashle--y-- PBD-B.1.09 BWR Vessel Internals Rev O.doc Page 14 1 r P.AsNey- PBD 8.1.09 BWR Vessel Internals Rev O.doc Page 14 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 14 of 32 BWR Vessel Internals b) The Oyster Creek plant uses hydrogen water chemistry but has not requested inspection relief under the provisions of 10 CFR 50.55a using BWRVIP-62 guidelines. If inspection relief is needed in the future, the guidance in BWRVIP-62 will be utilized and an appropriate relief request will be submitted under the provisions of 10 CFR 50.55a for staff approval.

Exceptions to NUREG-1 801. Element 3:

NUREG-1 801 program XI.M9 references ASME Section Xl, Table IWB 2500-1 (2001 edition, including the 2002 and 2003 Addenda).

The Oyster Creek ISI program is based the 1995 Edition, (including 1996 Addenda) of ASME Section Xl. The program is updated in accordance with 1OCUR 505.55a after each 10-year interval.

Enhancements to NUREG-1 801, Element 3:

None.

Comparison and Evaluation

Conclusion:

This element is consistent with NUREG-1 801, Element 3, Parameters Monitored or Inspected, with exceptions noted.

3.3 Detection of Aging Effects NUREG-1 801:

a) The extent and schedule of the inspection and test techniques prescribed by the applicable and approved BWRVIP guidelines are designed to maintain structural integrity and ensure that aging effects will be discovered and repaired before the loss of intended function of BWR vessel intemals. Inspection can reveal cracking. Vessel internal components are inspected in accordance with the requirements of ASME Section Xl, Subsection IWB, examination category B-N-2.

b) The ASME Section Xl inspection specifies visual VT-1 examination to detect discontinuities and imperfections, such as cracks, corrosion, wear, or erosion, on the surfaces of components. This inspection also specifies visual VT-3 examination to determine the general mechanical and structural condition of the component supports by (i) verifying parameters, such as clearances, settings, and physical displacements, and (ii) detecting discontinuities and imperfections, such as loss of

I D. Ashley - PBD B.1.09 BWR Vessel Intemals Rev O.docP P-a-ge 16 I Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 15 of 32 BWR Vessel Internals integrity at bolted or welded connections, loose or missing parts, debris, corrosion, wear, or erosion.

c) The applicable and approved BWRVIP guidelines recommend more stringent inspections, such as enhanced visual VT-I examinations or ultrasonic methods of volumetfic inspection, for certain selected components and locations.

d) The nondestructive examination (NDE) techniques appropriate for inspection of BWR vessel internals including the uncertainties inherent in delivering and executing NDE techniques in a BWR, are included in BWRVIP-03.

Oyster Creek:

a) The Oyster Creek Vessel Internals program utilizes inspections and test techniques prescribed by the applicable and approved BWRVIP guidelines to maintain structural integrity of BWR vessel internal components and to assure that aging effects will be discovered and repaired before the loss of intended function occurs. By following the BWRVIP guidelines, Oyster Creek also complies with ASME Section Xl requirements. Welded core supports, welded attachments, and other reactor internal components are inspected in accordance with the requirements of ASME Section Xl, Subsection IWB, examination category B-N-2 (

Reference:

OC-1, Oyster Creek Inservice Inspection Program, Table 2.2-21).

b) ASME Section Xl specifies VT-1 examinations to detect surface discontinuities and imperfections, cracks, corrosion, wear, or erosion. VT-3 examinations are specified to determine the general condition of component supports by verifying parameters, such as clearances and displacements, and by detecting discontinuities and imperfections, such as loss of integrity of bolted or welded connections, or loose or missing parts, debris, corrosion, wear, or erosion. Prior to each outage, the necessary inspections are determined based on the BWRVIP guidelines and the ASME Code. The examination procedures also identify the type and location of examination (VT-1, EVT-1, VT-3) required for each component as well as the basis for the inspection (BWRVIP, ASME Code or design requirement) (

References:

OC-5, Program Plan - Reactor Internals Program, Inspection Plans 7.01 - 7.15; ER-AA-300, Conduct of Inservice Inspection Activities and ER-AA-300-002, Inservice Inspection of Section Xl Welds and Components).

c) The recommendations applicable and approved BWRVIP

[ D. Ashley - PBD B.1.09 BWR Vessel Intemals Rev O.doc Pasge 161 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 16 of 32 BWR Vessel Internals guidelines, which often recommend more stringent inspections, are used for inspecting reactor internals. (

References:

OC-5, Program Plan - paragraph 1.9, Inspection Plans 7.10 - 7.15 and Attachment B).

d) The appropriate nondestructive examination (NDE) techniques used for inspection of BWR vessel internals, comply with requirements of BWRVIP-03, including the uncertainties inherent in delivering and executing NDE techniques in a BWR

(

Reference:

OC-5, Program Plan - paragraph 1.9).

Exceptions to NUREG-1801, Element 4:

NUREG-1 801 program XI.M4 references ASME Section Xl, Table IWB 2500-1 (2001 edition, including the 2002 and 2003 Addenda).

Oyster Creek ISI program is based on the 1995 (including 1996 Addenda) version of ASME Section Xl. For justification of exceptions to the ISI program see the ASME Section Xl In-service Inspection, Subsections IWB, IWC, and IWD aging management program, PBD-AMP-B.1.01 Enhancements to NUREG-1 801, Element 4:

None.

Comparison and Evaluation

Conclusion:

This element is consistent with NUREG-1 801, Element 4, Detection of Aging Effects, with the exception noted.

3.4 Monitoring and Trending NUREG-1 801:

a) Inspections scheduled in accordance with the applicable and approved BWRVIP guidelines provide timely detection of cracks.

b) The scope of examination and reinspection must be expanded beyond the baseline inspection if flaws are detected.

Oyster Creek:

a) Inspections are scheduled and performed in accordance with the applicable and approved BWRVIP guidelines, and are based upon the results from previous inservice inspections.

[ D. Ashley - PBD B.1.09 BWR-Ve-ssel Internals Rev O.doc _Pag6 Page 117TJI I D.Ashley PBD B.1 .09 BWR Vessel Internals

- Rev 0.doc Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 17 of 32 BWR Vessel Internals b) If flaws are detected, the inspection scope is expanded in accordance with the requirements of ASME Section Xl and the appropriate BWRVIP guideline (

References:

OC-5, Program Plan, Reactor Internals Program, Inspection Plans 7.1 -

7.15; ER-AA-330-002).

Exceptions to NUREG-1801. Element 5:

None.

Enhancements to NUREG-1 801, Element 5:

None.

Comparison and Evaluation

Conclusion:

This element is consistent with NUREG-1 801, Element 5, Monitoring and Trending.

3.5 Acceptance Criteria NUREG-1 801:

a. Any indication detected is evaluated in accordance with ASME Section Xl or the applicable staff-approved BWRVIP guidelines.
b. Approved BWRVIP-14, BWRVIP-59, and BWRVIP-60 documents provide guidelines for evaluation of crack growth in stainless steels (SS), nickel alloys, and low-alloy steels, respectively.

Oyster Creek:

a) Evaluation of indications is conducted consistent with the applicable and approved BWRVIP guideline or ASME Section Xl, as appropriate. (

Reference:

OC-5, Program Plan, Reactor Internals Program, paragraph 1.6) b) Flaws are evaluated in accordance with the guidance provided in the associated BWRVIP guidelines or ASME Section Xi, as appropriate for a particular component. Additional general guidelines for flaw evaluation of crack growth in stainless steels (SS), nickel alloys, and low-alloy steels is found in BWRVIP-14,

r D.Ashley- PBD B.11.09 BWRR Vessel Intemrals Rev 0.doc---  ; Page 1 Oyster Creek PB3D-AMP-B.1.09, Revision 0 License Renewal Project Page 18 of 32 BWR Vessel Internals BWRVIP-59, and BWRVIP-60. (

Reference:

ER-AB-331-1001, paragraph 3.1.3; and OC-5, Program Plan, Reactor Internals Program, paragraph 1.6).

Exceptions to NUREG-1801, Element 6:

NUREG-1 801 program XI.M4 references ASME Section Xl, Table IWB 2500-1 (2001 edition, including the 2002 and 2003 Addenda).

Oyster Creek ISI program is based on the 1995 (including 1996 Addenda) version of ASME Section Xl. For justification of exceptions to the ISI program see the ASME Section XI In-service Inspection, Subsections IWB, IWC, and IWD aging management program, PBD-AMP-B.1.01.

Exceptions to NUREG-1 801, Element 6:

None.

Enhancements to NUREG-1801. Element 6:

None.

Comparison and Evaluation

Conclusion:

This element is consistent with NUREG-1 801, Element 6, Acceptance Criteria.

3.6 Corrective Actions NUREG-1801:

a. Repair and replacement procedures are equivalent to those requirements in ASME Section Xi. Repair and replacement is performed in conformance with the applicable and approved BWRVIP guidelines listed above.
b. As discussed in the appendix to this report, the staff finds that licensee implementation of the guidelines in the staff-approved BWRVIP reports will provide an acceptable level of quality for inspection and flaw evaluation of the safety-related components addressed in accordance with 10 CFR Part 50, Appendix B, corrective actions.

Oyster Creek:

[ D. Ashley - PBD B.1.09 BWR Vessel Intemals Rev O.doc Page 19']

Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 19 of 32 BWR Vessel Internals

a. Repairs and replacements are performed in accordance with ASME Section Xi requirements and in conformance with the applicable and staff-approved BWRVIP guidelines listed in paragraph 2.1 above. (

References:

OC-5, Program Plan, Reactor Internals Program, paragraph 1.7 and ER-AB-331, BWR Reactor Internals Management Program Activities).

b. Evaluations are performed for examination results that do not satisfy the acceptance standards of IWB-3500 and an Issue Report is initiated to document the concern in accordance with plant administrative procedures (

Reference:

Procedure ER-AA-330-002, paragraph 4.12). The 10 CFR Part 50, Appendix B corrective action process ensures that conditions adverse to quality are promptly corrected. If the deficiency is assessed to be significantly adverse to quality, the cause of the condition is determined and an action plan is developed to preclude recurrence. (

Reference:

OC-5, paragraph 1.5; ER-AA-330-002, paragraph 4.12)

Exceptions to NUREG-1 801. Element 7:

None.

Enhancements to NUREG-1 801. Element 7:

None.

Comparison and Evaluation

Conclusion:

This element is consistent with NUREG-1 801, Element 7, Corrective Actions.

3.7 Confirmation Process NUREG-1 801:

Site quality assurance (QA) procedures, review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B.

As discussed in the appendix to this report, the staff finds that licensee implementation of the guidelines in the staff-approved BWRVIP reports will provide an acceptable level of quality for inspection and flaw evaluation of the safety-related components addressed in accordance with the 10 CFR Part 50, Appendix B, confirmation process and administrative controls.

Oyster Creek:

FD. Ashley - PBD B.1.09 BWR Vessel Internals Rev O.doc Page 20 d Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 20 of 32 BWR Vessel Internals Site quality assurance (QA) procedures, review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B.

Exceptions to NUREG-1801. Element 8:

None.

Enhancements to NUREG-1 801. Element 8:

None.

Comparison and Evaluation

Conclusion:

This element is consistent with NUREG-1 801, Element 8, Confirmation Process.

3.8 Administrative Controls NUREG-1 801:

See Item 8, above.

Oyster Creek:

See Item 8, above.

Exceptions to NUREG-1 801, Element 9:

None.

Enhancements to NUREG-1801. Element 9 None.

Comparison and Evaluation

Conclusion:

This element is consistent with NUREG-1 801, Element 9, Administrative Controls.

3.9 Operating Experience NUREG-1 801:

a) Extensive cracking has been observed in core shrouds at both horizontal (Nuclear Regulatory Commission [NRC] Generic Letter [GLJ 94-03) and vertical (NRC Information Notice [IN]

97-17) welds. It has affected shrouds fabricated from Type 304

I D. Ashley - PBD B.1.09 BWR Vessel Internals Rev O.doc PVag-e 2-11 Oyster Creek PBD-AMP-B.11.09, Revision 0 License Renewal Project Page 21 of 32 BWR Vessel Internals and Type 304L SS, which is generally considered to be more resistant to SCC. Weld regions are most susceptible to SCC, although it is not clear whether this is due to sensitization and/or impurities associated with the welds or the high residual stresses in the weld regions. This experience is reviewed in NRC GL 94-03 and NUREG-1544; some experiences with visual inspections are discussed in NRC IN 94-42.

b) Both circumferential (NRC IN 88-03) and radial cracking (NRC IN 92-57) has been observed in the shroud support access hole cover made from Alloy 600.

c) Instances of cracking in core spray spargers have been reviewed in NRC Bulletin 80-13.

d) Cracking of the core plate has not been reported, but the creviced regions beneath the plate are difficult to inspect.

e) NRC IN 95-17 discusses cracking in top guides of United States and overseas BWRs. Related experience in other components is reviewed in NRC GL 94-03 and NUREG- 1544. Cracking has also been observed in the top guide of a Swedish BWR.

f) Instances of cracking have occurred in the jet pump assembly (NRC Bulletin 80-07), hold-down beam (NRC IN 93-101), and jet pump riser pipe elbows (NRC IN 97-02).

g) Cracking of dry tubes has been observed at 14 or more BWRs.

The cracking is intergranular and has been observed in dry tubes without apparent sensitization, suggesting that IASCC may also play a role in the cracking.

h) The program guidelines outlined in applicable and approved BWRVIP documents are based on an evaluation of available information, including BWR inspection data and information on the elements that cause SCC, IGSCC, or IASCC, to determine which components may be susceptible to cracking.

Implementation of the program provides reasonable assurance that cracking will be adequately managed so the intended functions of the vessel intemal components will be maintained consistent with the current licensing basis (CLB) for the period of extended operation.

Oyster Creek:

a) Review of industry experience has confirmed that cracking has been observed in core shrouds at both horizontal (Nuclear Regulatory Commission [NRC] Generic Letter [GL] 94-03) and vertical (NRC Information Notice [IN] 97-17) welds. It has

r D..Ashley - PBD B.1.09 BWR*Vessel Internals RevO.doc 0 0- 0- - < Page 22]

Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 22 of 32 BWR Vessel Internals affected shrouds fabricated from Type 304 and Type 304L SS.

In 1994 Oyster Creek discovered signiifcant cracking in the core shroud H4 circumferential weld. Additional minor cracking was found in the H2 and H6 welds. The shroud inspection was comprehensive as recommendation the BWRVIP industry committee. The examinations consisted of visual examinations with cleaning and UT exams wherever practical. During the same refueling outage shroud repair hardware was installed to ensure the shroud could continue to perform its intended function. The repair consisted of 10 tie rods anchored at the top and bottom of the shroud. Subsequent inspections of the repair hardware have confirmed that the tie rods are in good condition and continue to provide reliable structural support for the shroud. Inspections of shroud vertical welds completed inI998 and 2000 have confirmed that the Reactor water chemistry program mitigation efforts have been successful, as no new crack indications have been observed. (

Reference:

TDR-1211, paragraph 3.15) b) Both circumferential (NRC IN 88-03) and radial cracking (NRC IN 92-57) has been observed in the shroud support access hole cover made from Alloy 600 at some BWR plants. The Oyster Creek BWR-2 design does not have an access plate in the shroud support ring, therefore this operating experience for this component is not applicable to Oyster Creek c) Instances of cracking in BWR core spray spargers have been reviewed in NRC Bulletin 80-13. In 1978 Oyster Creek identified crack indications in the Core Spray Spargers.

Mechanical clamps were installed to provide structural support for known and suspected cracks in the core spray sparger.

Recent inspections in 1998, 2000, 2002, and 2004 have confirmed that the repair clamps are in good condition.

Inspection of the core spray piping welds has confirmed that the mitigation efforts provided by the Reactor Water Chemistry program have been successful, as no new crack indications have been found. (

Reference:

TDR-1 211, paragraph 3.1).

d) Because the core plate is subject relatively high neutron fluence cracking of the core plate has been identified as a potential issue, although cracking has not been observed in a BWR to date. NRC IN 95-17 discusses cracking in top guides of United States and overseas BWRs. Related experience in other components is reviewed in NRC GL 94-03 and NUREG-1544.

Ring-to-plate weld cracking was reported in GENE SIL-588 at a

f L. Asnley - P8D B.1.09 BWR Vessel Internals Rev O.doc Page 231 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 23 of 32 BWR Vessel Internals foreign utility.

In 1996 (1R1 6) Oyster Creek inspected 18 of the 36 hold down bolts (top only). The underside of the core support plate is not accessible unless major disassembly of fuel cells is performed.

Core support plate wedges (lateral restraints) were designed and installed during the 17R Outage by GE. The reason for installing the wedges is because the material condition of the core support plate cannot be determined without major fuel component disassembly. Eight (8) wedges were installed between the OD of the core support plate and the l.D. of the shroud. The wedges are installed around the core support plate at the following azimuth locations: 24 degrees, 60 degrees, 96 degrees, 132 degrees, 204 degrees, 240 degrees, 276 degrees and 312 degrees. This modification not only provides horizontal support for the core plate, it also assures control rod insertion even if the hold down bolts fail. The wedges will keep the core plate aligned vertically during design basis loading conditions, even if the core support plate lifts upward a small amount.

Therefore, since control rod insertion is assured by the installation of wedges, the need for inspection of the core plate to assure its integrity is not required from a nuclear safety point of view. The installation of the wedges also eliminates the need to inspect the core support plate hold-down bolts. A baseline inspection of the core support wedges using VT-3 Performed VT-3 was performed in 2000 to verify that the wedges are in place. (

Reference:

TDR-1211, paragraph 3.5).

e) NRC IN 95-17 discusses cracking in top guides of United States and overseas BWRs. Related experience in other components is reviewed in NRC GL 94-03 and NUREG-1 544. Cracking has also been observed in the top guide of a Swedish BWR. In the 1991 refueling outage Oyster Creek found a cracked beam on the underside of the top guide. Additional cracked beams were discovered during 1992 and 1994. The top guide is visually inspected every outage to monitor crack growth. The results of the 2004 inspection indicate that there is no new crack growth, which indicates that the Oyster Creek BWR Reactor Water Chemistry program mitigation efforts are effective in mitigating the effects of cracking in the top guide. (

Reference:

TDR-1211, paragraph 3.10).

f) Instances of cracking have occurred in the jet pump assembly (NRC Bulletin 80-07), hold-down beam (NRC IN 93-101), and jet pump riser pipe elbows (NRC IN 97-02). The Oyster Creek

[ D. A-s-h-l-ey- P-BD--B-.l--.0-9BWR Vessel Intemals Rev O.doc Page 24 11 I D.Ashley PBDB.1.O9BWR Vessel Internals Rev O.doc Page 24 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 24 of 32 BWR Vessel Internals BWR-2 design does not have jet pumps; therefore this operating experience for this component is not applicable to Oyster Creek g) Cracking of dry tubes has been observed at several BWRs. The cracking is intergranular and has been observed in dry tubes without apparent sensitization, suggesting that IASCC may also play a role in the cracking. Cracking in the instrumentation dry tubes was first observed at Oyster Creek in 1984. In 1984 eight of the 12 original dry tubes were found with cracking in the non-pressure retaining plunger shaft area, which is a crevice condition. In 1984, 2 of the 12 dry tubes (IRM-14 and IRM-18) were replaced with new redesigned non-crevice single piece plunger shaft. The other 6 cracked tubes were technically justified as acceptable for one additional cycle of operation. In 1986, the balance of 12 dry tubes was replaced with the same redesigned crevice-free single piece plunger shaft. In 1988 IRM-17 was replaced again due to a bent tip that was observed the previous outage. Inspections were performed in 1991, 1992, 1994,1996, and 1998 with no findings. In 2000, visually inspected (VT-1) five dry tubes: (IRMs 16, 17, 18 and SRMs 21 and 24). IRM-17 was found slightly bent at the top and was dispositioned to use-as-is. Similarly dry tube inspections in 2004 (1R20) identified degradation in SRM-24, and IRM-1 7, and IRM-1 8. These incores are scheduled to be replaced in 2006 (

References:

TDR-1 211, paragraph 3.13; CAP #2000-1561; CAP-2004-3694).

h) The Oyster Creek Reactor Internals program utilizing the BWRVIP guidelines to perform inspections, evaluate flaws, and made repairs where necessary. The applicable and approved BWRVIP documents are based on an evaluation of available information, including BWR inspection data and information on the elements that cause SCC, IGSCC, or IASCC, to determine which components may be susceptible to cracking.

Implementation of the program provides reasonable assurance that cracking will be adequately managed so the intended functions of the vessel internal components will be maintained consistent with the current licensing basis (CLB) for the period of extended operation. The experience at Oyster Creek with the BWR Vessel Internals program shows that the BWR Vessel Internals program is effective in managing cracking initiation and growth.

Operating experience, both internal and external, is used in two

D. Ashley - PBD B.1.09 BWR Vessel Internals Rev 0.doc Page 25 1 Oyster Creek PBD-AMP-B.11.09, Revision 0 License Renewal Project Page 25 of 32 BWR Vessel Internals ways at Oyster Creek to enhance plant programs, prevent repeat events, and prevent events that have occurred at other plants from occurring at Oyster Creek. The first way in which operating experience is used is through the Oyster Creek Operating Experience process. The Operating Experience process screens, evaluates, and acts on operating experience documents and information to prevent or mitigate the consequences of similar events. The second way is through the process for managing programs. This process requires the review of program related operating experience by the program owner.

Both of these processes review operating experience from both external and internal (also referred to as in-house) sources.

External operating experience may include such things as INPO documents (e.g., SOERs, SERs, SENs, etc.), NRC documents (e.g., GLs, LERs, INs, etc.), General Electric documents (e.g.,

RCSILs, SlLs, TILs, etc.), and other documents (e.g., 10CFR Part 21 Reports, NERs, etc.). Internal operating experience may include such things as event investigations, trending reports, and lessons learned from in-house events as captured in program notebooks, self-assessments, and in the 10 CFR Part 50, Appendix B corrective action process.

Demonstration that the effects of aging are effectively managed is achieved through objective evidence that shows that cracking initiation and growth is being adequately managed in BWR vessel internals. In addition to the examples described above the following example of operating experience provides additional objective evidence that the BWR Vessel Intemals program is effective in assuring that intended function(s) will be maintained consistent with the CLB for the period of extended operation:

Oyster Creek has been inspecting the steam dryer every refueling outage for many years. Cracks were first identified on a lower bank brace in 1983. Weld repairs of the lower bank brace were made in 1983 and again in 1986. A different repair method, "stop drilling",

was implemented in 1996 to mitigate the cracks. Subsequent inspections indicate these measures have been successful in arresting crack growth. In 2002 minor indications on a lifting lug and a section of the skirt were found. These indications did not affect the structural integrity of the steam dryer and were dispositioned by engineering analysis to use-as-is.

These examples provide objective evidence that cracking will be detected prior to the loss of intended functions. The BWR Reactor Internals program at Oyster Creek was recently enhanced in a few

I D. Ashley -_PBD 13.1.09 BWR Vessel Internals Rev O.doc Page 261 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 26 of 32 BWR Vessel Internals key areas based on recommendations identified during a 2003 self-assessment and as a result of an INPO BWRVIP Review Visit performed in late 2003. Two examples of these enhancements are (1) that periodic inspections have been added for the shroud lug-clevis assemblies and (2) monthly moisture carryover readings are now taken to monitor Steam Dryer performance. Oyster Creek monitors quarterly program performance and effectiveness through program health reports and periodically performs self-assessments.

A review of the operating experience of the BWR Vessel Internals program did not indicate any adverse trend in performance.

Problems identified would not have caused significant impact to the safe operation of the plant, and adequate corrective actions were taken to prevent recurrence. There is sufficient confidence that the implementation of the BWR Vessel Intemals program will effectively determine cracking initiation and growth. Appropriate guidance for reevaluation, repair or replacement is provided for locations where cracking initiation and growth. Periodic self-assessments of the BWR Vessel Internals program are performed to identify the areas that need improvement to maintain the quality performance of the program.

3.10 Conclusion The Oyster Creek BWR Vessel Internals aging management program is credited for managing cracking initiation and growth for the systems, components, and environments listed in Table 5.2.

The Oyster Creek BWR Vessel Internals program's elements have been evaluated against NUREG-1 801 in Section 3.0. Program exceptions have been identified in Section 2.3. Program enhancements have been identified in Section 2.4. The implementing documents for this aging management program are listed in Table 5.1. The relevant operating experience has been reviewed and a demonstration of program effectiveness is provided in Section 3.10.

Based on the above, the continued implementation of the Oyster Creek BWR Vessel Internals aging management program provides reasonable assurance that cracking initiation and growth in reactor internals will be adequately managed so that the intended functions of components within the scope of license renewal will be maintained during the period of extended operation.

4.0 REFERENCES

rD. Ashley - PBD B.1.09 BWR Vessel Intemals Rev O.doc Page 27 -1 Oyster Creek PBD-AMP-B.11.09, Revision 0 License Renewal Project Page 27 of 32 BWR Vessel Internals 4.1 Generic to Aging Management Programs 4.1.1 10 CFR 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants 4.1.2 10 CFR 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants 4.1.3 NUREG-1 800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, Revision 1, dated September 2005 4.1.4 NUREG-1 801, Generic Aging Lessons Leamed (GALL)

Report, Revision 1, dated September 2005 4.2 Industry Standards 4.2.1 BWRVIP-02-A, BWR Core Shroud Repair Design Criteria, Revision 2.

4.2.2 BWRVIP-03, Reactor Pressure Vessel and Internals Examination Guidelines, Revision 6.

4.2.3 BWRVIP-14-A, Evaluation of Crack Growth in BWR Stainless Steel RPV Internals.

4.2.4 BWRVIP-16-A, Intemal Core Spray Piping and Sparger Replacement Design Criteria.

4.2.5 BWRVIP-17, Roll / Expansion Repair of Control Rod Drive and In-Core Instrument Penetrations in BWR Vessels.

4.2.6 BWRVIP-1 8-A, BWR Core Spray Inspection and Flaw Evaluation Guidelines.

4.2.7 BWRVIP-1 9-A, Internal Core Spray Piping and Sparger Repair Design Criteria.

4.2.8 BWRVIP-25, BWR Core Plate Inspection and Flaw Evaluation Guidelines.

4.2.9 BWRVIP-26, BWR Top Guide Inspection and Flaw Evaluation Guidelines.

FDAshFe-y'--ffB-b-B-.-1'.'6 13WRVesselinternalsRevO.doc P5a-ge 28 FbThey- PBD B.1.O9BWR Vessel lnterna Rev 0.doc Page 28 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 28 of 32 BWR Vessel Internals 4.2.10 BWRVIP-27-A, Standby Liquid Control System/Core Spray/Core Plate Delta-P Inspection and Flaw Evaluation Guidelines.

4.2.11 BWRVIP-29, BWR Water Chemistry Guidelines - 1996 Revision.

4.2.12 BWRVIP-38, BWR Shroud Support Inspection and Flaw Evaluation Guidelines.

4.2.13 BWRVIP-44-A, Underwater Weld Repair of Nickel Alloy Reactor Vessel Internals.

4.2.14 BWRVIP-45, Weldability of Irradiated LWR Structural Components.

4.2.15 BWRVIP-47, BWR Lower Plenum Inspection and Flaw Evaluation Guidelines.

4.2.16 BWRVIP-48, Inspection and Flaw Evaluation Guidelines.

4.2.17 BWRVIP-49-A, Instrument Penetration Inspection and Flaw Evaluation Guidelines.

4.2.18 BWRVIP-50-A, Top Guide / Core Plate Repair Design Criteria.

4.2.19 BWRVIP-52-A, Shroud Support and Vessel Bracket Repair Design Criteria.

4.2.20 BWRVIP-57-A, Instrument Penetration Repair Design Criteria.

4.2.21 BWRVIP-58-A, CRC Internal Access Weld Repair.

4.2.22 BWRVIP-59, Evaluation of Crack Growth in BWR Nickel Base Austenitic Alloys in RPV Internals.

4.2.23 BWRVIP-60-A, Evaluation of Stress Corrosion Crack Growth in Low Alloy Steel Vessel Materials in the BWR Environment.

4.2.24 BWRVIP-62, Technical Basis for Inspection Relief for BWR Internal Components with Hydrogen Injection.

4.2.25 BWRVIP-74-A, BWR Reactor Pressure Vessel Inspection

D.A; = . 6- vessel trnaev 0.doc 0X00 00 Page29 Page 29

[o. Ashley PBD B.1.09 BWR Vessel lnterna Rev 0.doc Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 29 of 32 BWR Vessel Internals and Flaw Evaluation Guidelines.

4.2.26 BWRVIP-76, BWR Core Shroud Inspection and Flaw Evaluation Guidelines.

4.2.27 BWRVIP-1 04, Evaluation and Recommendations to Address Shroud Support Cracking in BWRs.

4.2.28 BWRVIP-130, BWR Water Chemistry Guidelines, 2004 Revision.

4.2.29 BWRVIP-139, Steam Dryer Inspection and Flaw Evaluation Guideline.

4.2.30 NRC Generic Letter 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors, U.S.

Nuclear Regulatory Commission, July 25,1994.

4.2.31 NRC Bulletin No. 80-13, Cracking in Core Spray Spargers, U.S. Nuclear Regulatory Commission, May 12,1980.

4.2.32 NRC Information Notice 94-42, Cracking in the Lower Region of the Core Shroud in Boiling Water Reactors, U.S. Nuclear Regulatory Commission, June 7,1994.

4.2.33 NRC Information Notice 95-17, Reactor Vessel Top Guide and Core Plate Cracking, U.S. Nuclear Regulatory Commission, March 10, 1995.

4.2.34 NRC Information Notice 97-17, Cracking of Vertical Welds in the Core Shroud and Degraded Repair, U.S. Nuclear Regulatory Commission, April 4,1997.

4.3 Oyster Creek Program References

[ D. Ashley - PBD B.1.09 BWR Vessel Intemals Rev O.doc Page 301 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 30 of 32 BWR Vessel Internals 4.3.1 OC-1, Inservice Inspection Program.

4.3.2 OC-5, Program Plan, Reactor Internals Program.

4.3.3 TDR-1211, "Oyster Creek Reactor Internals Program Basis Document', 12/2003

r. AshNey - PBD B.1 .09 BWR Vessel Internals Rev O.doc Page 31 '

Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 31 of 32 BWR Vessel Internals 5.0 TABLES 5.1 Aging Management Program Implementing Documents Procedure Number Procedure Title Commitment No. Status CY-AB-120-100 Reactor Water 330592.09.04 ACC/ASG Chemistry ER-AA-330-002 Inservice Inspection of 330592.09.05 ACC/ASG Section Xi Welds and Components ER-AB-331 BWR Rx Internals 330592.09.02 ACC/ASG Mgmt Program Activities ER-AB-331-1001 RX Internals 330592.09.01 ACC/ASG OC-1 Oyster Creek 10-year 330592.09.06 ACC/ASG ISI Program OC-5 Reactor Internals 330592.09.03 ACC/ASG Program Plan II

[ D.Ashley - PBD B.1.09 BWR Vessel Internals Rev O.doc Page 32 ]

Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 32 of 1 BWR Vessel Internals 5.2 Aging Management Review Results J Material Aging Effect Structure ..andlor Component SSC Name -

l Environment

. ~~ ... . _.. _ _ .

Cracking Initiation and

-1 Reactor Interals Control Rod Drive Assembly (Housing and Guide Tube) Stainless Treated Water

___ _Steel Growth i i

Reactor Inteails Control Rod Drive Assembly (Housing and Guide Tube) CASS Treated Water >482F Cracking Initiation and i (Intemal) Growth i 4

Reactor Intemals  ! Control Rod Drive Assembly (Housing and Guide Tube) Stainress Treated Water NanliniIii-tifn

_rdsUKIIIw IIIdUUAII dr1U

- _ _ -__ i_ -Steel _ Growth 7-Reactor Intemals Core Plate (Lower Core Grid) Stainless Treated Water Cracking Initiation and

_ _Steel Growth Reactor Internals Core Plate (Lower Core Grid) Wedges Nikel Alloy Treated Water Cracking Initiation and Growth Reactor Intemals Core Shroud - - - Stainless Treated Water Cracking Initiation and Steel Growth Reactor Interals Core Shroud Stainless Treated Water Cracking Initiation and I Steel Growth Reactor Internals - Core Spray Line Spray Noz-ze Elbows jCASS

  • Treated Water >482F Cracking Initiation and Growth Reacor Core Spray Lines, Thermal Sleeves, Spray Rings Stainless Treated Water Cracking Initiation and

_ _- Sparger) and Spray Nozzles Steel Growth Reactor Intemals Core Spray Lines, Thermal Sleeves, Spray Rings Stainless Treated Water Cracking Initiation and

__ ___ ___(Sparger), and Spray Nozzles Steel Growth Reactor Intemals Core Spray Unes, Thermal Sleeves, Spray Rings Stainless Treated Water Cracking Initiation and (Sparger), and pSLy Nozzles Steel __ Growth Reactor Intemals Core Spray Ring (Sparger) Repair Hardware Stainless Treated Water Cracking Initiation and -

____________See I Steel Growth Reactor Internals Fuel Support Piece I CASS Treated Water >482F Cracking Initiation and Growth lReactor Internalts Fuel Support Piece CASS Treated Water >482F Cracking Iniiation and Growth

,Reactor Intermals In-core Neutron Monitor Dry Tubes, Guide"Tubes, & Stainless Treated Water Cracking Initiation and Housings -_ -Steel Growth i Reactor Intermals Shroud Repairs (tie rods and lug/clevis assemblies) Stainless Treated Water Cracking Initiation and

' _ _ 4Steel Growth

I D. Ashley- PBD B.1.09 BWR Vessel Internals Rev O.doc Page 33 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 33 of 1 BWR Vessel Internals Freactor Intermals Shroud Repairs (tie rods and lug/clevis assemblies) Nickel Alloy Treated Water Cracking Initiation and Growth Reactor Internals Shroud Support Structure Nickel Alloy Treated Water Cracking Initiation and Growth Reactor Internals Shroud Support Structure Nickel Alloy Treated Water Cracking Initiation and Growth Reactor Intenals i Top Guide (Upper Core Grid) Stainless Treated Water Cracking Initiation and Steel Growth Reactor Intemals Vessel Steam Dryer IStainless Steam Cracking Initiation and Steel Growth Reactor Pressure Penetrations (CRD Stub Tubes) Stainless Treated Water (Internal) Cracking Initiation and Vessel Growth. _

Reactor Pressure Penetrations (CRD Stub Tubes) -IStaees Treated Water (Internal) Cracking Initiation and Vessel _Steel Growth

[ D. Ashley - PBD B.1.09 BWR Vessel Internals Rev O.doc Page 341 Oyster Creek PBD-AMP-B.1.09, Revision 0 License Renewal Project Page 34 of 1 BWR Vessel Internals 6.0 ATTACHMENTS 6.1 LRA Appendix A 6.2 LRA Appendix B