| title = Partially Withheld Insp Rept 50-267/85-28 on 850930-1004 (Ref 10CFR73.21).Violations Noted:Physical Barriers, Assessment Aids,Security Program Audit,Security Organization & Maint & Lock & Key Procedures
| title = Ack Receipt of 861204 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-267/85-28 & 50-267/85-32
| author name = Caldwell R, Earnest A, Kelly J, Yandell L
| author name = Gagliardo J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee name =  
| addressee name = Williams R
| addressee affiliation =  
| addressee affiliation = PUBLIC SERVICE CO. OF COLORADO
| docket = 05000267
| docket = 05000267
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = 50-267-85-28, NUDOCS 8605130227
| document report number = NUDOCS 8701120274
| package number = ML20197B994
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
| page count = 2
}}
}}


Line 19: Line 18:


=Text=
=Text=
{{#Wiki_filter:. . . _ _ _ _ _ _ _ _  - _ _ -   ._ -___ __ _ ___ ____ __________-___ -_________
{{#Wiki_filter:7
  .
?, .y
  .
. . , .
JAN 8 1987
  .
In Reply Refer To: _ _
    *
Docket: 50-267/85-28 & 85-32 Public~ Service Company of Colorado ATTN: Robert 0. Williams, Jr.


1
Vice President, Nuclear Operations P. O. Box 840 Denver, Colorado 80201-0840 l
          /
APPENDIX B  .
g U. S. NUCLEAR REGULATORY COMMISSION


==REGION IV==
==Dear Sir:==
NRC Inspection Report: 50-267/85-28    License: DPR-34 Docket: 50-267
Thank you for your letter of December 4,1986, by which you informed us of the new completion dite for the Security Equipment Reliability Program.
        \
 
Licensee: Public Service Company of Colorado (PSC)
If there are additional delays or any change to the March 31, 1987, completion date, please advise us as soon as possible.
P. O. Box 840    ,
 
Denver, Colorado 80201 Facility Name: Fort St. Vrain Nuclear Generating Station (FSV)  i Inspection At: Platteville, Colorado Inspection Co:, ducted: September 30 through October 4, 1985 q ,
ORIGINAL SIGNED BY:
    ,, ...
J. E. Gagliardo, Chief Reactor Projects Branch cc:
      .
J. W. Gahm, Manager, Nuclear Production Division Fort St. Vrain Nuclear Station 16805 WCR 19 Platteville, Colorado 80651 L. Singleton, Manager, Quality Assurance Division (same address)
Inspectors: f': . . f s , .'f r ed, s 3-2/- 8h R. A. Caldwell, Physical Security; Specialist  Date Emergency Preparedness and Safeguards Programs Section
Colorado Radiation Control Program Director Colorado Public Utilities Commission bec to DM8 (IE04)
        -.D  l Nb AM.'EEnLu, rn W Security Specialist  Date Emergency Preparedness and Safeguards Programs Section      s
bec distrib. by RIV:
RP8   DRSP Resident Inspector  R. D. Martin, RA Section Chief (RPB/A)  RSB Section Chief (RSB/ES)  R&SPB MIS System  RSTS Operator RIV File  Inspector Section Chief  W. L. F,i her R. L. Bangart  '
RIV:EP SPS C:EP& P,S C:R&SP :R 8 A C:RPB }
ABEarne D  JPJaudon JEGagli o l/5/84 LAYandey l/5'/89 WlLFisher/(, /87;/q i /-)
    /q /86 8701120274 870108    0 PDR ADOCK 05000267    1 G  PDR    )(!
 
-
, ,s h Public Service ~    %TA_
16805 WCR 19 1/2, Platteville, Colorado 80651 December 4, 1986 Fort St. Vrain Unit No. 1 P-86640 f- ._ _
_i Regional Administrator  . ,4 Region IV    ,L U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000  j)i ') DEC l l1986 - .
. Arlington, Texas 76011  LLJ Attention: Mr. J. E. Gagliardo, Chief Reactor Projects Branch Docket No. 50-267 SUBJECT: Security Equipment Reliability REFERENCE: PSC Letter, Williams to Director Office of Inspection and Enforcement Dated August 5,1986(P-86471).
 
==Dear Mr. Gagliardo:==
In response to a Notice of Violation resulting from I&E Inspections 85-28 and 85-32 (Reference 1), PSC advised the NRC that we would develop a program to determine root causes and trend security system equipment inoperability. PSC originally projected this project to be
     '
     '
O .
complete by October 1, 1986.
4'  hlkcTb J. A. F. IGlly, Senior MPcal Security i Date Ypecialist, Emergencf Preparedness and Safeguards Programs Section Approved:      % _24 /fb
__
L. A. 'Yandell, Chief, Emeigency Preparedness and  D te  's Safeguards Programs Section 2:scLOSURE co:m. Ins M3UARDS IUOr./, TIO D08  UPOR EEPARATIOY TdIS
        '
PDR ADOCK 05000267 O  PDR  FAGE IS1rs00:1 xnit .- . . . - . - . .-
- 9-2-
            >
Inspection Summary Inspection Conducted ~ September 30 through October 4, 1985 (Report 50-267/85-28)
Areas Inspected: Routine, unannounced inspection of physical barriers -
protected area, assessment aids / lighting, security program audit, security organization, testing and maintenance, locks, keys and combinations, training and qualification, compensatory measures, anc' management controls - security progra Results: Within the areas inspected, nine violations were identified; physical barrier protected area (response), paragraph 2; physical barriers protected area (fences), paragraph 3: physical barriers protected area (isolation zone),
paragraph 4; physical barriers  protected area (bullet resistant glazing),
paragraph 5; assessment' aids, paragraph.6; security program audit, paragraph 7;
-
. security organization, paragraoh 8; testing and maintenance, paragraph 9; and


lock.and key. control procedures, paragraph 10). One deviation was identified (failure to meet ccmmitment for repairing 105, paragraph 12).
PSC has started collecting the data necessary to determine the causes and to establish a trend analysis program. However, in order to implement a truly effective program, PSC believes additional enhancements are needed. Therefore, PSC proposes a revision to the target date for complete implementation of this program to March 31, 1987. This will provide PSC sufficient time to develop and implement an effective security system equipment monitoring program.


.
Should you have any questions, please contact Mr. M. H. Holmes (303) 480-6960 for further information.
?
e


            .
*
i-
9kMis
 
_
,
,
'
. p . .o
            -
  - ..
            !
P-86640 -2- December 4, 1986
    ~
 
            .
Sincerely, J.W. Gahm Manager, Nuclear Production Fort St. Vrain Nuclear Generating Station JWG:DCG/mit
J
.
'
  %
E2LOSURE C0rNTAINS S&FZXRtUU)51270?;*.ftTIO UP0ll SEPJIRATION DIIS        '
PMIE IS DE30BTNET3 i    .
  ~
t g , , - - - ,---,m-n- ,-n , ,e,,w,.,, ,w -
    -,e,---- . - , - - - , - - ~ - , - - - - - - - - . - - , - - - ~ ~ - - - - - , - - - - - - -
}}
}}

Revision as of 20:35, 22 December 2020

Ack Receipt of 861204 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-267/85-28 & 50-267/85-32
ML20207L621
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/08/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 8701120274
Download: ML20207L621 (1)


Text

7

?, .y

. . , .

JAN 8 1987

.

In Reply Refer To: _ _

Docket: 50-267/85-28 & 85-32 Public~ Service Company of Colorado ATTN: Robert 0. Williams, Jr.

Vice President, Nuclear Operations P. O. Box 840 Denver, Colorado 80201-0840 l

Dear Sir:

Thank you for your letter of December 4,1986, by which you informed us of the new completion dite for the Security Equipment Reliability Program.

If there are additional delays or any change to the March 31, 1987, completion date, please advise us as soon as possible.

ORIGINAL SIGNED BY:

J. E. Gagliardo, Chief Reactor Projects Branch cc:

J. W. Gahm, Manager, Nuclear Production Division Fort St. Vrain Nuclear Station 16805 WCR 19 Platteville, Colorado 80651 L. Singleton, Manager, Quality Assurance Division (same address)

Colorado Radiation Control Program Director Colorado Public Utilities Commission bec to DM8 (IE04)

bec distrib. by RIV:

RP8 DRSP Resident Inspector R. D. Martin, RA Section Chief (RPB/A) RSB Section Chief (RSB/ES) R&SPB MIS System RSTS Operator RIV File Inspector Section Chief W. L. F,i her R. L. Bangart '

RIV:EP SPS C:EP& P,S C:R&SP :R 8 A C:RPB }

ABEarne D JPJaudon JEGagli o l/5/84 LAYandey l/5'/89 WlLFisher/(, /87;/q i /-)

/q /86 8701120274 870108 0 PDR ADOCK 05000267 1 G PDR )(!

-

, ,s h Public Service ~ %TA_

16805 WCR 19 1/2, Platteville, Colorado 80651 December 4, 1986 Fort St. Vrain Unit No. 1 P-86640 f- ._ _

_i Regional Administrator . ,4 Region IV ,L U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 j)i ') DEC l l1986 - .

. Arlington, Texas 76011 LLJ Attention: Mr. J. E. Gagliardo, Chief Reactor Projects Branch Docket No. 50-267 SUBJECT: Security Equipment Reliability REFERENCE: PSC Letter, Williams to Director Office of Inspection and Enforcement Dated August 5,1986(P-86471).

Dear Mr. Gagliardo:

In response to a Notice of Violation resulting from I&E Inspections 85-28 and 85-32 (Reference 1), PSC advised the NRC that we would develop a program to determine root causes and trend security system equipment inoperability. PSC originally projected this project to be

'

complete by October 1, 1986.

PSC has started collecting the data necessary to determine the causes and to establish a trend analysis program. However, in order to implement a truly effective program, PSC believes additional enhancements are needed. Therefore, PSC proposes a revision to the target date for complete implementation of this program to March 31, 1987. This will provide PSC sufficient time to develop and implement an effective security system equipment monitoring program.

Should you have any questions, please contact Mr. M. H. Holmes (303) 480-6960 for further information.

9kMis

_

,

. p . .o

- ..

P-86640 -2- December 4, 1986

Sincerely, J.W. Gahm Manager, Nuclear Production Fort St. Vrain Nuclear Generating Station JWG:DCG/mit

.

%