ML20195E523: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
| project = TAC:62882
| stage = Meeting
}}
}}


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_-_ _ _ _ . -
                    ,g    A, v                            UNITED STATES                                          ,
h              NUCLE AR REGULATORY COMMISSION                                    l t                        WASHING TON, D. C. 20555                                  !
                        )v j (m .....        '
St.P 1 8 $64                                    .
                                                                                          "L ?
: r. /          -
Docket No.: 50-412                                                                          !
i Mr. Earl J. Woolever, Vice President Nuclear Construction Division                                      .
Duquesne Light Company                                                                      ;
Robinson Plaza Bldg. 2 - Suite 210 i
,'                      PA Route 60 Pittsburgh, PA 15205                                                                        [
Oev Mr. Woolever:                                                                              :
 
==Subject:==
Request for a Meeting to Discuss Two of the Beaver Valley, Unit 2 Generic Letter 84-08 Issues                                                  .
t                      By two letters dated May 30, 1984 you identified two of the Beaver Valley                  '
Fower Station Unit 2 (BVPS-2) safety review issues as appifcable to Generic                ,
l Letter 84-08. In response to those letters and in accordance with Generic                    t Letter 84-08, we had originally scheduled a meeting between you, appropriate
{ '                      members of your staff, and Mr. Thomas M. Novak (Assistant Director for Licensing, Division of Licensing) and Dr. William V. Johnston (Assistant Ofrector for                  i Materials, Chemical and Environmental Engineering. Division of Engineering) for September 20, 1984. This date had been discussed previously with members                "
of your staff on September 13 and 17, 1984 Since you were not available on
;                      that date, we propose the meeting for September 26, 1984 at 1:30 pm in Bethesda,            p Ma ryland.
                                                                                                                    \
1 The Agenda will be as follows'                                                              t Iten 1:      Review criteria for Problem Maximum Precipitation (PMP)
(Draf t SER Open item #1 and #2)
Staff position is as stated in (1) BVPS-2 Oraft SER (March 1, 1984),
(2) applicant meeting with staff on March 21, 1984 and (3) letter
+                                      to E. Woolever from T. Novak, dated April 11, 1984.
Applicant position is as stated in letter from E. Woolever to 0. Eisenhut    j dated May 30, 1984.
                  *                                                                                                  [
t f                  i
!                          esito80169    840919 ADOCK 0500 i g,              i i                          PDR
:                          P                                                                                        ,
_2
 
3... .
2 1                              Item 2:  Fire suppression in the cable spreading room (Oraft SER Open Item (94.)
l
).                                        Staffpositionisasstatedinthe(1)BVPS-2DraftSER(March 1,1984),
(2) Standard Review Plan Section 9.5.1-Branch Technical Position (CMEB) i                                      9.5-1 and (3) applicant meetings with the staff on April 19 and May 9,
  ,                                      1984.
i                                        Applicant position is as stated in letter from E. Woolever to D. Eise.nhut i                                        dated May 30, 1984 Questions    concerning)this ProjectManager(301              meeting 492 7792. Your          shouldinbe cooperation        directed to M.
accommodating  thisLey,  L'icensing request is appreciated.
:                                                                          Sincerely, George    Knighton,  ief Licensing Branch No. 3 i
Division of Licensing l    (                        cc:  See next page 1
t i
l 1
9 i
i i
l i
i I}}

Latest revision as of 12:09, 9 December 2021

Notifies of 840926 Meeting W/Util in Bethesda,Md to Discuss Generic Ltr 84-08 Issues.Agenda Provided
ML20195E523
Person / Time
Site: Beaver Valley
Issue date: 09/19/1984
From: Knighton G
Office of Nuclear Reactor Regulation
To: Woolever E
DUQUESNE LIGHT CO.
References
GL-84-08, GL-84-8, TAC-62882, NUDOCS 8811080168
Download: ML20195E523 (2)


Text

_-_ _ _ _ . -

,g A, v UNITED STATES ,

h NUCLE AR REGULATORY COMMISSION l t WASHING TON, D. C. 20555  !

)v j (m ..... '

St.P 1 8 $64 .

"L ?

r. / -

Docket No.: 50-412  !

i Mr. Earl J. Woolever, Vice President Nuclear Construction Division .

Duquesne Light Company  ;

Robinson Plaza Bldg. 2 - Suite 210 i

,' PA Route 60 Pittsburgh, PA 15205 [

Oev Mr. Woolever:  :

Subject:

Request for a Meeting to Discuss Two of the Beaver Valley, Unit 2 Generic Letter 84-08 Issues .

t By two letters dated May 30, 1984 you identified two of the Beaver Valley '

Fower Station Unit 2 (BVPS-2) safety review issues as appifcable to Generic ,

l Letter 84-08. In response to those letters and in accordance with Generic t Letter 84-08, we had originally scheduled a meeting between you, appropriate

{ ' members of your staff, and Mr. Thomas M. Novak (Assistant Director for Licensing, Division of Licensing) and Dr. William V. Johnston (Assistant Ofrector for i Materials, Chemical and Environmental Engineering. Division of Engineering) for September 20, 1984. This date had been discussed previously with members "

of your staff on September 13 and 17, 1984 Since you were not available on

that date, we propose the meeting for September 26, 1984 at 1
30 pm in Bethesda, p Ma ryland.

\

1 The Agenda will be as follows' t Iten 1: Review criteria for Problem Maximum Precipitation (PMP)

(Draf t SER Open item #1 and #2)

Staff position is as stated in (1) BVPS-2 Oraft SER (March 1, 1984),

(2) applicant meeting with staff on March 21, 1984 and (3) letter

+ to E. Woolever from T. Novak, dated April 11, 1984.

Applicant position is as stated in letter from E. Woolever to 0. Eisenhut j dated May 30, 1984.

  • [

t f i

! esito80169 840919 ADOCK 0500 i g, i i PDR

P ,

_2

3... .

2 1 Item 2: Fire suppression in the cable spreading room (Oraft SER Open Item (94.)

l

). Staffpositionisasstatedinthe(1)BVPS-2DraftSER(March 1,1984),

(2) Standard Review Plan Section 9.5.1-Branch Technical Position (CMEB) i 9.5-1 and (3) applicant meetings with the staff on April 19 and May 9,

, 1984.

i Applicant position is as stated in letter from E. Woolever to D. Eise.nhut i dated May 30, 1984 Questions concerning)this ProjectManager(301 meeting 492 7792. Your shouldinbe cooperation directed to M.

accommodating thisLey, L'icensing request is appreciated.

Sincerely, George Knighton, ief Licensing Branch No. 3 i

Division of Licensing l ( cc: See next page 1

t i

l 1

9 i

i i

l i

i I