MONTHYEARML20195E5231984-09-19019 September 1984 Notifies of 840926 Meeting W/Util in Bethesda,Md to Discuss Generic Ltr 84-08 Issues.Agenda Provided Project stage: Meeting ML20093K5931984-10-12012 October 1984 Forwards Responses to Draft SER Issues 46 & 74 Re Loose Parts Monitoring Sys & Primary Component Cooling Water Isolation from Reactor Coolant Pump Thermal Barriers, Respectively Project stage: Request ML20101F7361984-11-0606 November 1984 Application for Withholding Study Re ESF Actuation Sys Setpoint Methodology (Ref 10CFR2.790) Project stage: Request ML20099G5331984-11-20020 November 1984 Forwards Positions on Backfit Requirements.Further Clarification & Justification to Facilitate Meaningful Appeal Meetings for Evaluating Postulated Increase in Plant Safety Requested Project stage: Request ML20112G8191985-03-27027 March 1985 Forwards Revised Power Sys Branch Mechanical Responses Previously Submitted Informally & Discussed in 850325 Telcon.Fsar Changes Will Be Incorporated in Upcoming Amend. Discussion of Lighting & Communication Included Project stage: Request ML20126M3041985-07-11011 July 1985 Forwards Decision on Appeal of Requirements on Fire Suppression in Cable Spreading Room.Implementation of Certain Human Factor Recommendations Requested Project stage: Other IR 05000412/19850131985-07-15015 July 1985 Insp Rept 50-412/85-13 on 850523-0628.Violation Noted:Pipe Support 2SWS-PSST625 Did Not Conform to Specs.Deviation Noted:Failure to Meet Reg Guide 1.29 Requirements Project stage: Request ML20133G9181985-10-0808 October 1985 Informs of Three Addl Improvements in Fire Fighting Re Reasonable Assurance of Hose Stream Access Into Dense Concentration of Cable Trays in Northwest Corner of Cable Spreading Room.W/One Oversize Drawing Project stage: Other ML20151N8801985-12-24024 December 1985 Forwards Comments on SER (NUREG-1057).Sys Will Be Implemented to Track Resolution of Comments & Future SER Changes.Statement on Page 2-46 Re Susceptibility of Soils Around Intake to Liquefaction Should Be Expanded Project stage: Other ML20207L5331987-01-0606 January 1987 Forwards Updated FSAR Fire Protection Matl in Preparation for Upcoming NRC Fire Protection Audit.Submittal Contains Info for Resolution of SER Open Item 5 & Confirmatory Item 48c.Matl Will Be Incorporated Into Amend 14 to FSAR Project stage: Other ML20207N1901987-01-0808 January 1987 Notification of 870129 Meeting W/Util in Shippingport,Pa to Conclude 4-day Site Review of Fire Protection Issues.Issues Identified as Confirmatory Issue 48 & Backfit Issue 7 in Sser 3 Project stage: Meeting ML20213A5671987-01-27027 January 1987 Requests Security Passes Be Provided to Personnel for 4-day Site Review to Begin on 870108 Re Fire Protection Issues Project stage: Other ML20209G4371987-01-28028 January 1987 Forwards Addl Info Re SER Backfit Item 7 (Fire Suppression in Cable Spreading Room),Per NRC Request in SER Section 9.5.1.6.Response to Item 4 Provided in Jj Carey , Per Sser 3 Project stage: Other ML20155H2511987-02-0505 February 1987 Summary of 870130 Meeting W/Util & S&W in Bethesda, MD to Conclude NRC Fire Protection Site Review of 870127-29.List of Attendees Encl Project stage: Meeting 1985-03-27
[Table View] |
Text
_-_ _ _ _. -
,g A,
v UNITED STATES h
NUCLE AR REGULATORY COMMISSION l
t WASHING TON, D. C. 20555
( )v j
m.....
St.P 1 8 $64
- r. /
"L ?
Docket No.: 50-412 i
Mr. Earl J. Woolever, Vice President Nuclear Construction Division Duquesne Light Company Robinson Plaza Bldg. 2 - Suite 210 i
PA Route 60 Pittsburgh, PA 15205
[
Oev Mr. Woolever:
Subject:
Request for a Meeting to Discuss Two of the Beaver Valley, Unit 2 Generic Letter 84-08 Issues By two letters dated May 30, 1984 you identified two of the Beaver Valley t
Fower Station Unit 2 (BVPS-2) safety review issues as appifcable to Generic Letter 84-08.
In response to those letters and in accordance with Generic l
Letter 84-08, we had originally scheduled a meeting between you, appropriate t
{
members of your staff, and Mr. Thomas M. Novak (Assistant Director for Licensing, Division of Licensing) and Dr. William V. Johnston (Assistant Ofrector for i
Materials, Chemical and Environmental Engineering. Division of Engineering) for September 20, 1984. This date had been discussed previously with members of your staff on September 13 and 17, 1984 Since you were not available on that date, we propose the meeting for September 26, 1984 at 1:30 pm in Bethesda, p
Ma ryland.
\\
1 The Agenda will be as follows' t
Iten 1:
Review criteria for Problem Maximum Precipitation (PMP)
(Draf t SER Open item #1 and #2)
Staff position is as stated in (1) BVPS-2 Oraft SER (March 1, 1984),
(2) applicant meeting with staff on March 21, 1984 and (3) letter to E. Woolever from T. Novak, dated April 11, 1984.
Applicant position is as stated in letter from E. Woolever to 0. Eisenhut j
+
dated May 30, 1984.
[
t f
i esito80169 840919 g,
i i
i PDR ADOCK 0500 P
2
3...
2 1
Item 2:
Fire suppression in the cable spreading room l
(Oraft SER Open Item (94.)
).
Staffpositionisasstatedinthe(1)BVPS-2DraftSER(March 1,1984),
(2) Standard Review Plan Section 9.5.1-Branch Technical Position (CMEB) 9.5-1 and (3) applicant meetings with the staff on April 19 and May 9, i
1984.
i Applicant position is as stated in letter from E. Woolever to D. Eise.nhut i
dated May 30, 1984 Questions concerning)this meeting should be directed to M. Ley, L'icensing ProjectManager(301 492 7792. Your cooperation in accommodating this request is appreciated.
Sincerely, George
- Knighton, ief i
Licensing Branch No. 3 Division of Licensing l (
cc:
See next page 1