MONTHYEARML20195E5231984-09-19019 September 1984 Notifies of 840926 Meeting W/Util in Bethesda,Md to Discuss Generic Ltr 84-08 Issues.Agenda Provided Project stage: Meeting ML20093K5931984-10-12012 October 1984 Forwards Responses to Draft SER Issues 46 & 74 Re Loose Parts Monitoring Sys & Primary Component Cooling Water Isolation from Reactor Coolant Pump Thermal Barriers, Respectively Project stage: Request ML20101F7361984-11-0606 November 1984 Application for Withholding Study Re ESF Actuation Sys Setpoint Methodology (Ref 10CFR2.790) Project stage: Request ML20099G5331984-11-20020 November 1984 Forwards Positions on Backfit Requirements.Further Clarification & Justification to Facilitate Meaningful Appeal Meetings for Evaluating Postulated Increase in Plant Safety Requested Project stage: Request ML20112G8191985-03-27027 March 1985 Forwards Revised Power Sys Branch Mechanical Responses Previously Submitted Informally & Discussed in 850325 Telcon.Fsar Changes Will Be Incorporated in Upcoming Amend. Discussion of Lighting & Communication Included Project stage: Request ML20126M3041985-07-11011 July 1985 Forwards Decision on Appeal of Requirements on Fire Suppression in Cable Spreading Room.Implementation of Certain Human Factor Recommendations Requested Project stage: Other IR 05000412/19850131985-07-15015 July 1985 Insp Rept 50-412/85-13 on 850523-0628.Violation Noted:Pipe Support 2SWS-PSST625 Did Not Conform to Specs.Deviation Noted:Failure to Meet Reg Guide 1.29 Requirements Project stage: Request ML20133G9181985-10-0808 October 1985 Informs of Three Addl Improvements in Fire Fighting Re Reasonable Assurance of Hose Stream Access Into Dense Concentration of Cable Trays in Northwest Corner of Cable Spreading Room.W/One Oversize Drawing Project stage: Other ML20138D9431985-10-17017 October 1985 Notification of 851022 Meeting W/Util & S&W in Bethesda,Md to Discuss Fire Protection Deviation Requests Project stage: Meeting ML20151N8801985-12-24024 December 1985 Forwards Comments on SER (NUREG-1057).Sys Will Be Implemented to Track Resolution of Comments & Future SER Changes.Statement on Page 2-46 Re Susceptibility of Soils Around Intake to Liquefaction Should Be Expanded Project stage: Other ML20206J0051986-06-23023 June 1986 Forwards Documentation of Attendees at 841130 & 1207,850117, 0820,0919 & 1022 Meetings W/Util Re Structural Engineering, Geosciences Issues,Pressure Isolation Valves,Power Sys, Computer Code Multiflex & Fire Protection,Respectively Project stage: Meeting ML20215K7361986-10-23023 October 1986 Notification of 861105 Meeting W/Util in Bethesda,Md to Discuss Issues Re Fire Protection,Including Util Deviations from Staff Technical Position Project stage: Meeting ML20214D3181986-11-18018 November 1986 Summary of 861105 Meeting W/Util,Stone & Webster & Franklin Research Inst Re Fire Protection Issues.Draft Sser 3,list of Deviations from SRP 9.5.1,agenda & List of Attendees Encl ML20207L5331987-01-0606 January 1987 Forwards Updated FSAR Fire Protection Matl in Preparation for Upcoming NRC Fire Protection Audit.Submittal Contains Info for Resolution of SER Open Item 5 & Confirmatory Item 48c.Matl Will Be Incorporated Into Amend 14 to FSAR Project stage: Other ML20207N1901987-01-0808 January 1987 Notification of 870129 Meeting W/Util in Shippingport,Pa to Conclude 4-day Site Review of Fire Protection Issues.Issues Identified as Confirmatory Issue 48 & Backfit Issue 7 in Sser 3 Project stage: Meeting ML20213A5671987-01-27027 January 1987 Requests Security Passes Be Provided to Personnel for 4-day Site Review to Begin on 870108 Re Fire Protection Issues Project stage: Other ML20209G4371987-01-28028 January 1987 Forwards Addl Info Re SER Backfit Item 7 (Fire Suppression in Cable Spreading Room),Per NRC Request in SER Section 9.5.1.6.Response to Item 4 Provided in Jj Carey , Per Sser 3 Project stage: Other ML20209F8201987-01-30030 January 1987 Forwards Amend 14 to Fsar,Consisting of Updated FSAR Fire Protection Info Provided in Author .Info Affects Section 9.5.1 of SER Project stage: Other ML20155H2511987-02-0505 February 1987 Summary of 870130 Meeting W/Util & S&W in Bethesda, MD to Conclude NRC Fire Protection Site Review of 870127-29.List of Attendees Encl Project stage: Meeting ML20211B9951987-02-11011 February 1987 Forwards Addl Info Re Fire Protection,Including Info Re SRP Deviation on Structural Steel & Vendor Justification of Thickness Requirements for HVAC Ductwork Fire Wrap,Per NRC 870126-30 Fire Protection Site Visit Project stage: Other ML20210C3141987-04-30030 April 1987 Forwards Request for Addl Info Re Confirmatory Issue 46, Fire Protection Deviations & Confirmatory Issue 46, Control Room Isolations on High Radiation Signals. Encl Provides Background Info for Telcon.No Response Required Project stage: RAI ML20214J9301987-05-18018 May 1987 Forwards Changes Expected to Occur in Next Rev to Amend 18 of Fsar,Section 9.5 Re Fire Protection Project stage: Other ML20214J6981987-05-18018 May 1987 Describes Fire Detection & Suppression Sys at Facility (Ref NRC ).Present Capability of Sys Adequate & Overall Plant Safety Would Not Be Significantly Increased by Modifying Suppression Sys Alarm Circuits.W/Four Figures Project stage: Other ML20214J9731987-05-20020 May 1987 Provides Compensatory Measures to Deal W/Fire Zones Containing Equipment Necessary for Tech Spec Equipment Operability Where fire-rated Assemblies Incomplete.Hourly Fire Patrols Conducted When Necessary Project stage: Other IR 05000412/19870371987-05-28028 May 1987 Insp Rept 50-412/87-37 on 870420-0501.No Violations Noted. Major Areas Inspected:Preoperation & Startup Test Program, Startup Test Procedure Review,Qa Interfaces & Emergency Diesel Generator Instrumentation Vibration Project stage: Request ML20234C4631987-06-24024 June 1987 Forwards Util Comments on Low Power License for Facility, Including Discussion of Fire Protection & Plant Safety Monitoring Sys.Util Will Work W/Nrc Project Manager to Resolve Comments Project stage: Other ML20235J2981987-07-0606 July 1987 Responds to Questions Posed by D Kubicki in Telecon Re Fire Protection Supervisory Circuits & Schedule for Completion Project stage: Other ML20235Q7051987-09-30030 September 1987 Forwards Testing Status of CO2 Fire Suppression Sys. Overpressure Problems Associated w/CO2 Discharge Testing Eliminated by Installation of Back Draft Dampers.Expected Completion Date Revised to 871231 Project stage: Draft Other ML20234E2911987-12-31031 December 1987 Advises That CO2 Concentration Testing Successfully Completed for All Eight Zones,Per 870930 Commitment to Provide Schedule for Completion of Unfinished Fire Protection Items Project stage: Other ML20151L9681987-12-31031 December 1987 1987 Annual Rept of Facility Changes,Tests & Experiments Project stage: Other ML20196A2341988-06-20020 June 1988 Concludes That Based on Licensee Annual Rept of Facility, Changes,Tests & Experiments & 880608 Site Visit, Changes,Tests & Experiments Meet Criteria in 10CFR50.59. Lists Improvements Recommended to Licensee During Visit Project stage: Other ML20206A7351988-11-0808 November 1988 Advises That Util 880722 Submittal of 1987 Rept of Facility Changes,Tests & Experiments Meet Criteria in 10CFR50.59 & Acceptable.Comments Listed Project stage: Other 1987-01-28
[Table View] |
Text
January 27, 1987 Docket No. 50-412 DISTRIRUTTON
~
M ler Local PDR ACRS (10)
Mr. J. J. Carey, Senior Vice President PAD #2 Pdg Gray File Duquesne Light Company T. Novak Nuclear Group OGC-Bethesda Post Office Box 4 E. Jordan Shippingport, PA 15077 R. Grimes J. Partlow
Dear Mr. Carey:
N. Thompson Sub.fect: Beaver Valley Unit 2 - Request for Cooperation for NRC Staff Site Visit on Fire Protection issues (TAC 62935 and 62882)
As we announced in a meeting notice dated January 8, 1987, two staff reviewers (A. Singh and S. West) and a consultant (T. Storey) will be at the site to conduct a 4-day site review.
Please take steps to provide these personnel with the necessary security passes for all areas they need to have access to. The two NRC staffers are currently holders of L-clearance badges.
Thank you for your assistance.
Sincerely, Peter S. Tam, Pro.iect Manager PWR Pro.iect nirectorate #2 Division of PWR Licensing-A Office of Nuclear Reactor Reoulation cc: See next page p'y#][g L@p!?,,
PM: PAD PD:PA.2 f
L,Ru
,,J g,jA r
PTam:h nstein
>ig aria i 187 4 W /r % s >4 &cp
/
c P
rP 6 W, e&Yw,W b'
/r',,h &
+ p '.Dw*j/
ff Cf 3
a t
n U
/-
li 1,
QN 8702030356 870127 g
PDR ADOCK 05000412 F
PDR
Mr. J. J. Carev Duquesne light Company Beaver Valley 2 Power Station ec:
Gerald Charnoff, Esq.
Mr. R. E. Martin, Manager Jay E. Silberg, Esq.
Regulatory Affairs Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 2300 N Street, N.V.
Beaver Valley Two Project Washington, DC 20037 P. O. Box 328 Shippingport, Pennsylvania 15077 Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager Assistant Counsel Quality Assurance Department Governor Energy Council Duquesne Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 John D. Burrows, P.E.
Director, Pennsylvania Emergency Director of Utilities Management Agency State of Ohio Room B-151 Public Utilities Commission Transportation & Safety Building 180 East Broad Street Harrisburg, Pennsylvania 17170 Columbus, Ohio 43266-0573 Mr. T. J. Lex Bureau of Radiation Protection Westinghouse Electric Corporation PA Department of Environmental Power Systems Resources P. O. Box 355 ATTN:
R. Janati Pittsburgh, Pennsylvania 15?30 P.O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Box 23?5 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. J. Beall U. S. NRC John A. Lee, Esq.
P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin.
Pittsburgh, Pennsylvania 15279 U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvania 15229 5
-.