            In Reply Refer To:
            Docket:    50-267/87-25                          JAN I 5 m
            Public Service Company of Colorado
            ATTN:    Robert 0. Williams, Jr.
                    Vice President, Nuclear
                      Operations
            2420 West 26th Avenue, Suite 15c
            Denver, Colorado      80211
          ~ Gentlemen:
            This refers to the inspection conducted by Messrs R. E. Farrell and
            P. W. Michaud of this office during the period October 18 through November 21,
            1987, of activities authorized by NRC Operating License OPR-34 for-Fort St.
            Vrain Nuclear Generating Station, and to the discussion of our_ findings with
            you and other members of your staff.at the conclusion of the inspection.
            Areas examined during.the inspection included. licensee action on previous
            inspection findings, operational safety verification, monthly surveillance
            observation, monthly maintenance observation, security, radiological
            protection, and design control. Within these areas, the inspection consisted
            of selective examination of procedures ar,d representative records, interviews
            with personnel, and observations by the inspectors. The inspection findings
            are documented in the enclosed inspection report.
            During this inspection, it was found that certain of your activities were in
            violation of NRC requireme_nts.            Consequently, you are required to respond to
            this violation, in writing, in accordance with the provisions of Section 2.201
            of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
            Regulations.      Your response should be based on the specifics contained in the
            Notice of Violation enclosed with this letter.
            We have also examined actions you have taken with regard to prcviously
            identified inspection findings.              The status of these items is identified in
            paragraph 2 of the enclosed report.
            Toe response directed by this letter and the accompanying Notice is not subject
            to the clearance procedures of the Office of Management and Budget as required
            by the Paperwork Reduction Act of 1980, PL 96-511.
            RIV: SRI          RI                  PS/B
                                                            W          0:DRP b
    d REFarrell/ld h PWMichaud                    T      terman            an
          M/ /S?            I W /87'                  / /88          N,LJCal)/87
    l                                        @FW                        ip                    )\
            //T/TT            // 5/[r?                                                        -
            8801200442 880115
                                                                                              gCl
            PDR    ADOCK 05000267
            G                    PDR
-
    .          --  -
                        .- .      -        - -_ . - -            -__.          - ,, . - , ,        . ,
 
  _ _ . - _ _ .          _ _ _ _ _ _ _ _ _ _ _ _
.              ,
                  Public Service Company of Colorado      -2-
                  Should you have any questions concerning this inspection, we will be pleased to
                  discuss them with you.
                                                            Sincerely,
                                                                      Orig;inal Ebned UY
                                                                          L. J. Callan
                                                            L. J. Callan, Director
                                                            Division of Reactor Project
                  Enclosures:
                  1.  Appendix A - Notice of Violation
                  2.  Appendix B - NRC Inspection Report
                                50-267/87-25
                  cc w/ enclosures:
                  Manager, Nuclear
                    Production Division
                  Fort St. Vrain Nuclear Generating Station
                  16805 WCR 19 1/2
                  Platteville, Colorado          80651
                  P. Tomlinson, Manager, Quality
                    Assurance Division
                  (Same Address)
                  Colorado Radiation Control Program Director
                  Colorado Public utilities Commission
                  bec to DMB (IE01)
                  bec distrib. by RIV:                  .
                  *RRI                                        R. D. Martin, RA
                  *Section Chief (DRP/B)                      RPSB-DRSS
                  *ProjectEngineer,DRP/B                    *Lisa Shea, RM/ALF
                  * MIS System                              *RSTS Operator
                  *K. Heitner, NRR Project Manager          *RIV File
                  *R. Hall                                  *DRS
                  ^TSS                                      *DRP
                  *w/766
}}
}}

Latest revision as of 16:47, 13 November 2020

Forwards Insp Rept 50-267/87-25 on 871018-1121 & Notice of Violation
ML20195H994
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/15/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20195J000 List:
References
NUDOCS 8801200442
Download: ML20195H994 (2)


See also: IR 05000267/1987025

Text

s **: u

4 a

.. ,

In Reply Refer To:

Docket: 50-267/87-25 JAN I 5 m

Public Service Company of Colorado

ATTN: Robert 0. Williams, Jr.

Vice President, Nuclear

Operations

2420 West 26th Avenue, Suite 15c

Denver, Colorado 80211

~ Gentlemen:

This refers to the inspection conducted by Messrs R. E. Farrell and

P. W. Michaud of this office during the period October 18 through November 21,

1987, of activities authorized by NRC Operating License OPR-34 for-Fort St.

Vrain Nuclear Generating Station, and to the discussion of our_ findings with

you and other members of your staff.at the conclusion of the inspection.

Areas examined during.the inspection included. licensee action on previous

inspection findings, operational safety verification, monthly surveillance

observation, monthly maintenance observation, security, radiological

protection, and design control. Within these areas, the inspection consisted

of selective examination of procedures ar,d representative records, interviews

with personnel, and observations by the inspectors. The inspection findings

are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requireme_nts. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to prcviously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

Toe response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

RIV: SRI RI PS/B

W 0:DRP b

d REFarrell/ld h PWMichaud T terman an

M/ /S? I W /87' / /88 N,LJCal)/87

l @FW ip )\

//T/TT // 5/[r? -

8801200442 880115

gCl

PDR ADOCK 05000267

G PDR

-

. -- -

.- . - - -_ . - - -__. - ,, . - , , . ,

_ _ . - _ _ . _ _ _ _ _ _ _ _ _ _ _ _

. ,

Public Service Company of Colorado -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Orig;inal Ebned UY

L. J. Callan

L. J. Callan, Director

Division of Reactor Project

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-267/87-25

cc w/ enclosures:

Manager, Nuclear

Production Division

Fort St. Vrain Nuclear Generating Station

16805 WCR 19 1/2

Platteville, Colorado 80651

P. Tomlinson, Manager, Quality

Assurance Division

(Same Address)

Colorado Radiation Control Program Director

Colorado Public utilities Commission

bec to DMB (IE01)

bec distrib. by RIV: .

  • RRI R. D. Martin, RA
  • Section Chief (DRP/B) RPSB-DRSS
  • ProjectEngineer,DRP/B *Lisa Shea, RM/ALF
  • MIS System *RSTS Operator
  • K. Heitner, NRR Project Manager *RIV File
  • R. Hall *DRS

^TSS *DRP

  • w/766