ML11355A095: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11355A095
| number = ML11355A095
| issue date = 12/29/2011
| issue date = 12/29/2011
| title = Summary of Telephone Conference Call Held on December 8, 2011, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning RAIs Pertaining to the Davis-Besse Nuclear Power Station, LRA (TAC No. ME464
| title = Summary of Telephone Conference Call Held on December 8, 2011, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning RAIs Pertaining to the Davis-Besse Nuclear Power Station, LRA
| author name = CuadradoDeJesus S
| author name = Cuadradodejesus S
| author affiliation = NRC/NRR/DLR/RPB1
| author affiliation = NRC/NRR/DLR/RPB1
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 December 29, 2011 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station SUBJECT: SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 8,2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640) The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on December 8. 2011, to discuss and clarify the applicant's responses to the staff's requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station license renewal application. Enclosure 1 provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant A brief description of the status of the items is also included. The applicant had an opportunity to comment on this summary. S el Manangerjects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Number: 50-346 Enclosures: As stated cc w/encls: Listserv TELEPHONE CONFERENCE DAVIS-BESSE NUCLEAR POWER LICENSE RENEWAL LIST OF DECEMBER 8, PARTICIPANTS AFFILIATIONS Samuel Cuadrado de Jesus U.S. Nuclear Regulatory Commission (NRC) Allen Hiser NRC Christopher Sydnor NRC On Vee NRC Larry Hinkle FirstEnergy Nuclear Operating Company (FENOC) Steven Dort FENOC Allen McAllister FENOC Enclosure 1 REQUESTS FOR ADDITIONAL DAVIS-BESSE NUCLEAR POWER LICENSE RENEWAL DECEMBER 8, The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on December 8, 2011, to discuss and clarify the following response to requests for additional information (RAls) and new RAls concerning the Davis-Besse Nuclear Power Station license renewal application (LRA). October 31.2011. Response to RAI4.7.4-1 Discussion: The staff requested the applicant to clarify why, in its October 31,2011, response to RAI4.7.4-1, Commitment No. 23 was revised to remove the applicant's commitment to replace the high pressure injection (HPI)/makeup nozzle thermal sleeve. The applicant stated that since the HPllmakeup nozzle thermal sleeve time-limited aging analysis (TLAA) was dis positioned using 10 CFR 54.21(c)(1)(iii) where the effects of cracking on the thermal sleeve are managed by the Inservice Inspection (lSI) Program, the commitment to replace the thermal sleeve was no longer deemed applicable. The applicant noted that the VT-1 visual examination of the HPllmakeup nozzle thermal sleeve conducted on a frequency of once every other refueling outage will continue through the period of extended operation. The applicant further noted that subsequent inspections conducted after replacement of the HPllmakeup nozzle thermal sleeve in the Cycle 13 refueling outage found no indications of cracking. The staff found the above clarification acceptable and had no further questions or applicant follow-up actions. Relative to the lSI Program, the staff wanted to know the type and frequency of the inspection for the HPllmakeup nozzle thermal sleeve. The applicant stated that this information was included in the changes to the license renewal application (LRA) associated with the response to RAI 4.7.4-1. Specifically, revised LRA Sections 4.7.4 and A.2.7.4 provide that the lSI Program requires a VT -1 visual examination of the makeup nozzle once every other refueling outage. The staff found the above clarification acceptable and had no further questions or applicant follow-up actions. Enclosure 2 December 29,2011 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station SUBJECT: SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 8, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640) The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on December 8, 2011, to discuss and clarify the applicant's responses to the staff's requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station license renewal application. Enclosure 1 provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant. A brief description of the status of the items is also included. The applicant had an opportunity to comment on this summary. IRA! Samuel Cuadrado de Jesus, Project Mananger Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Number: 50-346 Enclosures: As stated cc w/encls: Listserv DISTRIBUTION: See next page I ADAMS Accession No' ML 11355A095 .. *via e-mail OFFICE LA:DLR* PM:RPB1 :DLR BC:RPB1 :DLR PM:RPB1 :DLR NAME SFigueroa SCuadrado de DMorey I SCuadrado de Jesus Jesus ; DATE 12/27/11 12/28/11 12/29/11 12/29/11 OFFICIAL RECORD Memorandum to FirstEnergy Nuclear Operating Company from S. Cuadrado de Jesus dated December 29, 2011 SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 8, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640) DISTRIBUTION: E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource PCooper BHarris SCuadrado EMilier MMahoney ICouret, OPA TReiIlY,OCA BHarris, OGC
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 29, 2011 LICENSEE:       FirstEnergy Nuclear Operating Company FACILITY:       Davis-Besse Nuclear Power Station
}}
 
==SUBJECT:==
 
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 8,2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on December 8. 2011, to discuss and clarify the applicant's responses to the staff's requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station license renewal application. provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant A brief description of the status of the items is also included.
The applicant had an opportunity to comment on this summary.
S     el   adm(l~~
jects Branch 1       ~oje(
Division of License Renewal Mananger Office of Nuclear Reactor Regulation Docket Number: 50-346
 
==Enclosures:==
 
As stated cc w/encls: Listserv
 
TELEPHONE CONFERENCE CALL DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS DECEMBER 8, 2011 PARTICIPANTS                     AFFILIATIONS Samuel Cuadrado de Jesus         U.S. Nuclear Regulatory Commission (NRC)
Allen Hiser                     NRC Christopher Sydnor               NRC On Vee                           NRC Larry Hinkle                     FirstEnergy Nuclear Operating Company (FENOC)
Steven Dort                     FENOC Allen McAllister                 FENOC Enclosure 1
 
REQUESTS FOR ADDITIONAL INFORMATION DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION DECEMBER 8, 2011 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on December 8, 2011, to discuss and clarify the following response to requests for additional information (RAls) and new RAls concerning the Davis-Besse Nuclear Power Station license renewal application (LRA).
October 31.2011. Response to RAI4.7.4-1 Discussion: The staff requested the applicant to clarify why, in its October 31,2011, response to RAI4.7.4-1, Commitment No. 23 was revised to remove the applicant's commitment to replace the high pressure injection (HPI)/makeup nozzle thermal sleeve.
The applicant stated that since the HPllmakeup nozzle thermal sleeve time-limited aging analysis (TLAA) was dis positioned using 10 CFR 54.21(c)(1)(iii) where the effects of cracking on the thermal sleeve are managed by the Inservice Inspection (lSI) Program, the commitment to replace the thermal sleeve was no longer deemed applicable. The applicant noted that the VT-1 visual examination of the HPllmakeup nozzle thermal sleeve conducted on a frequency of once every other refueling outage will continue through the period of extended operation. The applicant further noted that subsequent inspections conducted after replacement of the HPllmakeup nozzle thermal sleeve in the Cycle 13 refueling outage found no indications of cracking.
The staff found the above clarification acceptable and had no further questions or applicant follow-up actions.
Relative to the lSI Program, the staff wanted to know the type and frequency of the inspection for the HPllmakeup nozzle thermal sleeve. The applicant stated that this information was included in the changes to the license renewal application (LRA) associated with the response to RAI 4.7.4-1. Specifically, revised LRA Sections 4.7.4 and A.2.7.4 provide that the lSI Program requires a VT -1 visual examination of the makeup nozzle once every other refueling outage.
The staff found the above clarification acceptable and had no further questions or applicant follow-up actions.
Enclosure 2
 
'.. ML11355A095                                            *via e-mail OFFICE LA:DLR*                 PM:RPB1 :DLR           BC:RPB1 :DLR     PM:RPB1 :DLR NAME       SFigueroa           SCuadrado de           DMorey         I SCuadrado de I
Jesus                                     Jesus
; DATE         12/27/11           12/28/11               12/29/11         12/29/11 Memorandum to FirstEnergy Nuclear Operating Company from S. Cuadrado de Jesus dated December 29, 2011
 
==SUBJECT:==
 
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 8, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)
DISTRIBUTION:
E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource PCooper BHarris SCuadrado EMilier MMahoney ICouret, OPA TReiIlY,OCA BHarris, OGC}}

Latest revision as of 19:28, 6 February 2020

Summary of Telephone Conference Call Held on December 8, 2011, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning RAIs Pertaining to the Davis-Besse Nuclear Power Station, LRA
ML11355A095
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/29/2011
From: Cuadradodejesus S
License Renewal Projects Branch 1
To:
FirstEnergy Nuclear Operating Co
Cuadrado de Jesus S
References
TAC ME4640
Download: ML11355A095 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 29, 2011 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 8,2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on December 8. 2011, to discuss and clarify the applicant's responses to the staff's requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station license renewal application. provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant A brief description of the status of the items is also included.

The applicant had an opportunity to comment on this summary.

S el adm(l~~

jects Branch 1 ~oje(

Division of License Renewal Mananger Office of Nuclear Reactor Regulation Docket Number: 50-346

Enclosures:

As stated cc w/encls: Listserv

TELEPHONE CONFERENCE CALL DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS DECEMBER 8, 2011 PARTICIPANTS AFFILIATIONS Samuel Cuadrado de Jesus U.S. Nuclear Regulatory Commission (NRC)

Allen Hiser NRC Christopher Sydnor NRC On Vee NRC Larry Hinkle FirstEnergy Nuclear Operating Company (FENOC)

Steven Dort FENOC Allen McAllister FENOC Enclosure 1

REQUESTS FOR ADDITIONAL INFORMATION DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION DECEMBER 8, 2011 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on December 8, 2011, to discuss and clarify the following response to requests for additional information (RAls) and new RAls concerning the Davis-Besse Nuclear Power Station license renewal application (LRA).

October 31.2011. Response to RAI4.7.4-1 Discussion: The staff requested the applicant to clarify why, in its October 31,2011, response to RAI4.7.4-1, Commitment No. 23 was revised to remove the applicant's commitment to replace the high pressure injection (HPI)/makeup nozzle thermal sleeve.

The applicant stated that since the HPllmakeup nozzle thermal sleeve time-limited aging analysis (TLAA) was dis positioned using 10 CFR 54.21(c)(1)(iii) where the effects of cracking on the thermal sleeve are managed by the Inservice Inspection (lSI) Program, the commitment to replace the thermal sleeve was no longer deemed applicable. The applicant noted that the VT-1 visual examination of the HPllmakeup nozzle thermal sleeve conducted on a frequency of once every other refueling outage will continue through the period of extended operation. The applicant further noted that subsequent inspections conducted after replacement of the HPllmakeup nozzle thermal sleeve in the Cycle 13 refueling outage found no indications of cracking.

The staff found the above clarification acceptable and had no further questions or applicant follow-up actions.

Relative to the lSI Program, the staff wanted to know the type and frequency of the inspection for the HPllmakeup nozzle thermal sleeve. The applicant stated that this information was included in the changes to the license renewal application (LRA) associated with the response to RAI 4.7.4-1. Specifically, revised LRA Sections 4.7.4 and A.2.7.4 provide that the lSI Program requires a VT -1 visual examination of the makeup nozzle once every other refueling outage.

The staff found the above clarification acceptable and had no further questions or applicant follow-up actions.

Enclosure 2

'.. ML11355A095 *via e-mail OFFICE LA:DLR* PM:RPB1 :DLR BC:RPB1 :DLR PM:RPB1 :DLR NAME SFigueroa SCuadrado de DMorey I SCuadrado de I

Jesus Jesus

DATE 12/27/11 12/28/11 12/29/11 12/29/11 Memorandum to FirstEnergy Nuclear Operating Company from S. Cuadrado de Jesus dated December 29, 2011

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 8, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)

DISTRIBUTION:

E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource PCooper BHarris SCuadrado EMilier MMahoney ICouret, OPA TReiIlY,OCA BHarris, OGC