Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Fire Protection
ML110450046
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/17/2011
From: Harris B
License Renewal Projects Branch 1
To: Allen B
FirstEnergy Nuclear Operating Co
Harris B
References
TAC ME4640
Download: ML110450046 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 17, 2011 Barry S. Allen Vice President, Davis-Besse Nuclear Power Station FirstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, OH 43449

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS BESSE NUCLEAR POWER STATION-FIRE PROTECTION (TAC NO. ME4640)

Dear Mr. Allen:

By letter dated August 27,2010, FirstEnergy Nuclear Operating Company, submitted an application pursuant to Title 10 of the Code of Federal Regulation Part 54 for renewal of Operating License NPF-3 for the Davis-Besse Nuclear Power Station. The staff of the U.S.

Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants." During its review, the staff has identified areas where additional information is needed to complete the review. The staffs requests for additional information are included in the Enclosure. Further requests for additional information may be issued in the future.

Items in the enclosure were discussed with Cliff Custer, of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2277 or bye-mail at brian. harris2@nrc.gov.

Sincerely,

/'

~f~l fA*.II..A CoopQ2.. FO~ 8~IAN I--\~'S Brian K. Harris, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosure:

As stated cc w/encl: Distribution via Listserv

Davis-Besse Nuclear Power Station Request for Additional Information RAI 2.3.3.14-1 License renewal application (LRA) drawing LR-M016A shows that several yard fire hydrants and post indicator valves are out of scope (i.e., not colored in green). The staff believes that yard fire hydrants and post indicator valves have the fire protection intended functions required to be compliant with 10 CFR 50.48 as stated in 10 CFR 54.4. The fire hydrants and post indicator valves also serve as the pressure boundary for the fire protection water supply system.

The staff requests that the applicant verify whether the yard hydrants and post indicator valves are in the scope of license renewal in accordance with 10 CFR 54.4(a} and whether they are subject to an aging management review (AMR) in accordance with 10 CFR 54.21 (a)(1). If they are excluded from the scope of license renewal and are not subject to an AMR, the staff requests that the applicant provide justification for the exclusion.

RAI 2.3.3.14-2 LRA drawing LR-M016B shows that the automatic sprinkler system for the No.1 Diesel Generator Room is in the scope of license renewal and subject to an AMR. However, the automatic sprinkler system for the No.2 Diesel Generator Room does not appear in the LRA drawings as being in the scope of license renewal and subject to an AMR.

The staff requests that the applicant verify whether the automatic sprinkler system for the No.2 Diesel Generator Room is in the scope of license renewal in accordance with 10 CFR 54.4(a) and subject to an AMR in accordance with 10 CFR 54.21 (a)(1). If the sprinkler system is excluded from the scope of license renewal and not subject to an AMR, the staff requests that the applicant provide justification for the exclusion.

RAI 2.3.3.14-3 Tables 2.3.3-14 and 3.3.2-14 of the LRA do not include the following fire protection components:

fire hose stations, fire hose connections, and hose racks sprinkler heads floor drains for fire water dikes and curbs for oil spill confinement components in reactor coolant pump oil collection system The staff requests that the applicant verify whether the fire protection components listed above are in the scope of license renewal in accordance with 10 CFR 54.4(a} and whether they are subject to an AMR in accordance with 10 CFR 54.21(a}(1}. If they are excluded from the scope of license renewal and are not subject to an AMR, the staff requests that the applicant provide justification for the exclusion.

ENCLOSURE

February 17, 2011 Barry S. Allen Vice President, Davis-Besse Nuclear Power Station FirstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, OH 43449

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION - FIRE PROTECTION (TAC NO. ME4640)

Dear Mr. Allen:

By letter dated August 27,2010, FirstEnergy Nuclear Operating Company, submitted an application pursuant to Title 10 of the Code of Federal Regulation Part 54 for renewal of Operating License NPF-3 for the Davis-Besse Nuclear Power Station. The staff of the U.S.

Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants." During its review, the staff has identified areas where additional information is needed to complete the review. The staff's requests for additional information are included in the Enclosure. Further requests for additional information may be issued in the future.

Items in the enclosure were discussed with Cliff Custer, of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2277 or bye-mail at brian.harris2@nrc.gov.

Sincerely, IRA! Paula Cooper for Brian K. Harris, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

See next page ADAMS Accession No.: ML110450046 OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR PM:RPB1 :DLR NAME IKing BHarris BPham BHarris (PCooper for) (PCooper for)

DATE 02/14/11 02/15/11 02/15/11 02/17/11 OFFICIAL RECORD COpy

Letter to B. Allen from B. Harris dated February 17, 2011

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION - FIRE PROTECTION (TAC NO.

ME4640)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDfrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource PCooper BHarris DWrona EMilier MMahoney ICouret, OPA TReilly, OCA BHarris, OGC VMitlyng, RII JCameron, Rill