Letter Sequence RAI |
---|
TAC:ME4640, Steam Generator Tube Integrity (Approved, Closed) |
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples, L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems., L-11-334, Reply to Request Additional Information for the Review of the License Renewal Application Amendment No. 21, L-12-337, Review of the Safety Evaluation Report with Open Items Related to the License Renewal, L-12-444, Submittal of Contractor Equivalent Margins Assessments for Reactor Vessel Welds (Nonproprietary Versions), L-12-456, Notification of Closure of Commitments Related to the Review of the License Renewal Application, L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45), L-13-330, License Renewal Application Amendment No. 46 - Annual Update, L-13-341, Review of the Safety Evaluation Report Related to the License Renewal of Davis-Besse Nuclear Power Station, L-14-085, License Renewal Application (TAC No. ME4640) Amendment No. 48, L-14-206, License Renewal Application Amendment No. 50 - Annual Update, L-15-120, Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55, L-15-139, License Renewal Reactor Vessel Internals Inspection Plan, L-15-214, License Renewal Application Amendment No. 59 - Annual Update, L-15-309, License Renewal Application Amendment No. 60, L-15-310, C-CSS-099.20-069, Rev 0, Shield Building Laminar Cracking Limits., ML102450565, ML111050091, ML11110A089, ML11110A091, ML11110A092, ML11110A093, ML11110A094, ML11110A095, ML11110A105, ML11110A106, ML11110A107, ML11122A014, ML11126A017, ML11126A018, ML11126A019, ML11126A020, ML11126A021, ML11126A022, ML11126A023, ML11126A024, ML11126A025, ML11126A026, ML11126A032, ML11126A033, ML11126A034, ML11126A035, ML11126A036, ML11126A037, ML11126A038, ML11126A039, ML11126A040, ML11126A041, ML11126A042, ML11126A043... further results
|
MONTHYEARML11126A0882008-01-12012 January 2008 Drawing No. LR-M041B, Revision 1, Piping & Instrument Diagram Primary Service Water System. Job Code 12501 Project stage: Other ML11126A0902008-01-15015 January 2008 Drawing No. LR-OS41A1, Revision 1, Operational Schematic Emergency Diesel Generator Systems. Project stage: Other L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems.2008-01-15015 January 2008 Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems. Project stage: Other ML11126A0682008-05-0505 May 2008 Drawing No. LR-M-037E, Revision 28, Piping & Instrument Diagram Clean Liquid Radioactive Waste System. Project stage: Other ML11126A0652008-08-0606 August 2008 Drawing No. LR-M036B, Revision 1, Piping & Instrument Diagram Component Cooling Water System. Project stage: Other ML11126A0592008-10-0909 October 2008 Drawing No. LR-M033A, Revision 1, Piping & Instrument Diagram High Pressure Injection. Project stage: Other ML11126A0632008-10-10010 October 2008 Drawing No. LR-M033B, Revision 1, Piping & Instrument Diagram Decay Heat Train 1. Project stage: Other ML11126A0702008-10-10010 October 2008 Drawing No. LR-M033C, Revision 1, Piping & Instrument Diagram Decay Heat Train 2. Project stage: Other ML11126A0742008-11-0606 November 2008 Drawing No. LR-M043, Revision 1, Piping & Instrument Diagram Auxiliary Building Chilled Water System. Project stage: Other ML11126A0832008-12-18018 December 2008 Drawing No. LR-M038C, Revision 2, Piping & Instrument Diagram Gaseous Radioactive Waste System. Job Code 12501 Project stage: Other ML11126A0712009-04-0707 April 2009 Drawing No. LR-M034, Revision 1, Piping & Instrument Diagram Emerg. Core Cooling System Ctmt. Spray & Core Flooding Systems. Project stage: Other ML11126A0892009-04-0707 April 2009 Drawing No. LR-OS002, Revision 1, Operational Schematic Makeup and Purification System. Project stage: Other ML1024505652010-08-27027 August 2010 License Renewal Application and Ohio Coastal Management Program Consistency Certification Project stage: Other ML1104500462011-02-17017 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Fire Protection Project stage: RAI ML11126A0792011-02-25025 February 2011 Drawing No. LR-M900A, Revision 0, Instrument Air System Piping Schematic. Project stage: Other ML1104205972011-02-28028 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 2.4 Project stage: RAI ML1106801722011-03-17017 March 2011 Request for Additional Information on the Reactor Vessel Surveillance Aging Management Program, Time-Limited Aging Analyses for Neutron Embrittlement of the Rv and Internals, and Other TLAAs for the Review of the Davis-Besse Nuclear Power S Project stage: RAI ML1107007322011-03-18018 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.2 & 2.3 Project stage: RAI L-11-078, Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 12011-03-18018 March 2011 Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 1 Project stage: Response to RAI ML11068A0002011-03-21021 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 4.7 (TAC Number ME4640) Project stage: RAI L-11-079, Reply to Request for Additional Information for the Review of the License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-11-089, Reply to Request for Additional Information for the Review License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review License Renewal Application Project stage: Response to RAI ML1108206242011-03-30030 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.1 (Tac No. ME4640) Project stage: RAI ML1109002952011-03-31031 March 2011 Safety Evaluation Report Related to the License Renewal of Salem Nuclear Generating Station Project stage: Approval ML1108204902011-04-0505 April 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 1 Project stage: RAI ML11110A0932011-04-15015 April 2011 Drawing No. M-037D, Rev. 21, Clean Liquid Radioactive Waste System Project stage: Other ML11110A1072011-04-15015 April 2011 Drawing No. M-045, Rev. 56, Chemical Addition Systems Project stage: Other ML11110A1062011-04-15015 April 2011 Drawing No. M-042C, Rev. 33, Sampling System Sh. 3 Project stage: Other ML11110A1052011-04-15015 April 2011 Drawing No. M-040A, Rev. 76, Reactor Coolant System Details Project stage: Other ML11110A0952011-04-15015 April 2011 Drawing No. M-039B, Rev. 18, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A0942011-04-15015 April 2011 Drawing No. M-039A, Rev. 33, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A0922011-04-15015 April 2011 Drawing No. M-037C, Rev. 30, Clean Liquid Radioactive Waste System Project stage: Other L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples2011-04-15015 April 2011 Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples Project stage: Other L-11-107, Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application...2011-04-15015 April 2011 Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application... Project stage: Response to RAI ML11110A0882011-04-15015 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application, Sections 2.2 & 2.3, License Renewal Application Amendment No. 3, and Revised License Renewal Project stage: Response to RAI ML11110A0912011-04-15015 April 2011 Drawing No. M-011, Rev. 61, Domestic Water System Project stage: Other ML11110A0892011-04-15015 April 2011 Drawing No. M-0060, Rev. 52, Auxiliary Feedwater System Project stage: Other ML1110500912011-04-19019 April 2011 Scoping and Screening Audit Report Regarding the Davis-Besse Nuclear Power Station License Renewal Application Project stage: Other L-11-115, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 42011-04-20020 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 4 Project stage: Response to RAI ML1109807182011-04-20020 April 2011 Request for Additional Information for the Review of the Davis-Bessie Nuclear Power Station - Batch 2 Project stage: RAI ML11126A0362011-04-29029 April 2011 Drawing No. LR-M017D, Revision 1 Piping & Instrument Diagram, Steam Blackout Diesel Generator. Project stage: Other ML11126A0352011-04-29029 April 2011 Drawing No. LR-M017C, Revision 2, Piping & Instrument Diagram, Fuel Oil. Project stage: Other ML11126A0342011-04-29029 April 2011 Drawing No. LR-M017B, Revision 1, Piping & Instrument Diagram, Diesel Generators Air Start. Project stage: Other ML11126A0332011-04-29029 April 2011 Drawing No. LR-M016B, Revision 1, Piping & Instrument Diagram Station Fire Protection System Project stage: Other ML11126A0322011-04-29029 April 2011 Drawing No. LR-M016A, Revision 1, Piping & Instrument Diagram Station Fire Protection System Project stage: Other ML11126A0262011-04-29029 April 2011 Drawing No. LR-M010C, Revision 1, Piping & Instrument Diagram Make-up Water Treatment System Project stage: Other ML11126A0252011-04-29029 April 2011 Drawing No. LR-M010A, Revision 1, Piping & Instrument Diagram Make-Up Water Treatment System Project stage: Other ML11126A0242011-04-29029 April 2011 Drawing No. LR-M009B, Revision 1, Piping & Instrument Diagram Cooling Water System Project stage: Other ML11126A0192011-04-29029 April 2011 Drawing No. LR-M003A, Revision 1, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 1 Project stage: Other ML11126A0452011-04-29029 April 2011 Drawing No. LR-M024H, Revision 1, Piping & Instrument Diagram, No. 2 Main and Auxiliary Turbine Driven Feed Pumps. Project stage: Other 2011-02-25
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24248A2332024-09-0505 September 2024 Summary of the August 29, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML23152A2552023-06-0505 June 2023 Summary of the May 17, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML22178A2312022-06-28028 June 2022 Summary of the June 22, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Davis Besse Nuclear Power Station ML22088A1972022-03-30030 March 2022 Summary of March 11, 2022, Call Regarding the Spring 2022 Steam Generator Tube Inspections ML22084A1022022-03-27027 March 2022 Reissue Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML22077A8062022-03-23023 March 2022 Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML21314A5362021-11-18018 November 2021 Summary of November 8, 2021, Meeting with Energy Harbor Nuclear Corp. Regarding Its Proposed Alternate for Examination of Steam Generator Welds at ML21180A4632021-06-29029 June 2021 Summary of the June 22, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML20240A2942020-08-27027 August 2020 July 23, 2020 Summary of Public Webinar to Discuss the Nrc 2019 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant ML19249C7112019-09-0404 September 2019 Summary of the July 18, 2019 Public Outreach/Open House to Discuss the NRC 2018 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station ML18313A1982018-11-14014 November 2018 Summary of Meeting with Firstenergy Nuclear Operating Company Regarding Planned Submittal of Post-Shutdown Emergency Plan for Davis-Besse Nuclear Power Station ML18192A6522018-07-10010 July 2018 Summary of Public Meeting to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML17258A1462017-09-20020 September 2017 Summary of September 12, 2017, Meeting with Firstenergy Nuclear Operating Company Regarding Its Licensing Amendment Request to Adopt National Fire Protection Association Standard 805 at Davis-Besse Nuclear Power Station, Unit No. 1 ML17229B1362017-08-16016 August 2017 Summary of July 19, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML17087A1882017-03-28028 March 2017 Summary of Closed Meeting with Firstenergy Nuclear Operating Company Regarding Changes to the Davis-Besse Nuclear Power Station, Unit No. 1, Security Plan ML16197A0522016-07-14014 July 2016 Summary of June 21, 2016, Public Meeting with Firstenergy Nuclear Operating Company to Discuss the 2015 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Station ML16130A7502016-05-12012 May 2016 Summary of April 12, 2016, Teleconference Regarding Steam Generator Tube Inservice Inspection ML14177A5782016-02-22022 February 2016 November 13, 2013, Summary of Meeting with Firstenergy Nuclear Operating Company to Discuss Delay in Submittal of Fire Risk Reduction Amendment Request ML16006A3512016-01-20020 January 2016 December 17,2015 Summary of Meeting with Firstenergy Nuclear Operating Company on Its License Amendment Request to Revise the Emergency Diesel Generator Surveillance Requirements at Davis-Besse Nuclear Power Station, Unit 1 ML16007A3962016-01-12012 January 2016 Summary of January 5, 2016, Meeting with Firstenergy Nuclear Operating Company on Its Planned License Amendment Request to Revise the Emergency Action Level Scheme at Davis-Besse Nuclear Power Station, Unit No. 1 ML15196A5162015-07-24024 July 2015 Summary of Telephone Conference Call Held on May 06, 2015, and May 19, 2015 Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company ML15170A2862015-06-18018 June 2015 Summary of the Public Open House Regarding Davis-Besse Nuclear Power Station ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML15056A4562015-04-20020 April 2015 Summary of Teleconference Call Held February 20, 2015, Between U.S. Nuclear Regulatory Commission and First Energy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station ML14325A7782014-12-16016 December 2014 October 6, 2014, Summary of Pre-Application Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Combination of Site Emergency Plans ML14224A6142014-08-12012 August 2014 Summary of Public Meeting to Discuss the 2013 Performance of Davis-Besse Nuclear Power Station ML14160B1032014-07-10010 July 2014 June 6, 2014 Summary of Meeting with FENOC Flooding Hazard Reevaluation Extension Request for Beaver Valley Power Station, Units 1 and 2 and Flooding Hazard Reevaluation Report for Davis-Besse Nuclear Power Station, Unit 1 ML14099A4642014-05-0606 May 2014 Summary of Public Meetings to Discuss Draft Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Generating Station, Unit 1 ML14099A3392014-04-22022 April 2014 March 27, 2014, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and First Energy Nuclear Operating Company Concerning Commitment 13 of the Safety Evaluation Report Pertaining to the Davis Besse Unit 1, Licens ML14080A1842014-03-21021 March 2014 Summary of Webinar Meeting to Discuss NRC Inspection Activities Associated with the Davis-Besse Nuclear Power Station Installation of Two New Steam Generators ML13240A0702013-08-29029 August 2013 8 22 2013 DB NRC Telecon Summary License Condition ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13182A4082013-07-17017 July 2013 Summary of Telephone Conference Call Held on October 16, 2012, Between NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA (TAC No. ME640) ML13197A2572013-07-17017 July 2013 5 28 2013 DB Hs Bolts Telecon Summary ML13149A2862013-07-12012 July 2013 Summary of Telephone Conference Call Held on May 2, 2013, Between the NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station License Renewal Application ML13182A4432013-07-12012 July 2013 Summary of Telephone Conference Call Held on April 11, 2013, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Powe ML13149A2882013-07-0909 July 2013 May 9, 2013, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Stat ML13168A2422013-06-14014 June 2013 6/11/2013 - Summary of Open House to Discuss the 2012 Davis-Besse Nuclear Power Station End-Of-Cycle Performance ML13091A3272013-03-29029 March 2013 Summary of Public Meeting to Discuss the Davis-Besse Replacement Activities ML13051A0682013-03-26026 March 2013 January 16, 2013 Summary of Telephone Conference Call Held Between U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company ML13051A6602013-03-26026 March 2013 Summary of Telephone Conference Call Held on January 23, 2013, Between the NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA ML13025A0272013-02-14014 February 2013 October 23, 2012 Summary of Telephone Conference Call Held Between the Nuclear Regulatory and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station, License ML12277A4082012-10-0303 October 2012 September 26, 2012, Summary of Public Meeting to Discuss FENOC Fleet Performance ML12243A2832012-08-30030 August 2012 Summary of Public Meeting to Discuss Nrc'S Review of Fenoc'S Root Cause Analysis of Davis-Besse Shield Building Cracks ML12237A0432012-08-24024 August 2012 August 15, 2012 - Summary of Public Meeting to Discuss the Davis-Besse Nuclear Power Station, Unit 1, End-Of-Cycle Plant Performance Assessment ML12165A3502012-07-16016 July 2012 Summary of Conference Call for Stream Generator Tube Inservice Inspections for Spring 2012 Refueling Outage ML12195A1132012-07-16016 July 2012 Summary of Public Meeting with FENOC Regarding Licensing Practices and Processes ML12052A1792012-05-15015 May 2012 July 19, 2011, Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station ML12061A2582012-04-0202 April 2012 Summary of Telephone Conference Call Held on July 12,2011, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power ML12059A0782012-04-0202 April 2012 Summary of Telephone Conference Call Held on February 9, 2012, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Pow 2024-09-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 July 12, 2013 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MAY 2, 2013, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC) held a telephone conference call on May 2, 2013, to discuss and clarify the staff's requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station license renewal application. provides a listing of the participants and Enclosure 2 contains a summary of the staff discussion with FENOC. A brief description on the status of the items is also included.
FENOC had an opportunity to comment on this summary.
Sincerely.
Docket No. 50-346
Enclosures:
- 1. List of Participants
- 2. List of Requests for Additional Information cc w/encls: Listserv
July 12, 2013 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MAY 2, 2013, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on May 2,2013, to discuss and clarify the staff's requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station license renewal application. provides a listing of the participants and Enclosure 2 contains a summary of the staff discussion with FENOC. A brief description on the status of the items is also included.
FENOC had an opportunity to comment on this summary.
Sincerely, IRA!
Samuel Cuadrado de Jesus, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosures:
- 1. List of Participants
- 2. List of Requests for Additional Information cc w/encls: Listserv DISTRIBUTION: See next page ADAMS Accession No.: ML13149A286 *concurred via email
- DLR/RPB2 PM:DLR/RPB1 BC:DLR/RPB21 PM:DLR/RPB1 S Cuadrado Y Diaz S Cuadrado 07/9/2013 071/2013 07112/2013 OFFICIAL RECORD COpy
SUMMARY
OF TELEPHONE CONFERENCE CALL DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS May 2,2013 PARTICIPANTS AFFILIATIONS Samuel Cuadrado de Jesus U.S. Nuclear Regulatory Commission (NRC)
William (Bill) Holston NRC Angela Buford NRC Cliff Custer FirstEnergy Nuclear Operating Company (FENOC)
Steven Dort FENOC Trent Henline FENOC Don Kosloff FENOC Jake Hofelich FENOC Larry Hinkle FENOC ENCLOSURE 1
SUMMARY
OF TELEPHONE CONFERENCE CALL DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION May 2,2013 The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of FirstEnergy Nuclear Operating Company (FENOC) held a telephone conference call on May 2,2013, to discuss and clarify the following requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station (Davis-Besse) license renewal application (LRA).
Response to RAI B.2.4-1b dated March 14.2013 Discussion: The purpose of the call was to discuss FENOC's March 14, 2013, response to RAI B.2.4-1 b related to high strength structural bolting, specifically to address high strength bolting in the ASME Section XI - IWF Program, as follows:
The staff stated that for the population of bolts that are high-strength (actual yield greater than.
150 ksi), with a diameter greater than 1-inch, and located on a Class 1, Class 2, Class 3 pipe support or component support that is eligible to be in the IWF sample population FENOC should provide a plant-specific justification to waive the volumetric examination requirement for bolting.
The staff stated that a reasonable justification to waive the volumetric examination is as follows:
- For high strength A540 bolting, the volumetric examination operating experience from the reactor vessel closure head studs provides acceptable justification for a waiver. However, the A540 bolts would have to be included in the 100 percent visual inspection population as previously described for A540 bolts covered by the Structures Monitoring Program.
For high strength ASTM A325 and A490 bolting perform a one-time baseline volumetric examination of 20 percent or 25 bolts maximum and 100 percent visual examination of bolts as previously described for A540 bolts covered by the Structures Monitoring Program. The one-time volumetric examinations would be performed for each type of bolting, for a total of 50 examinations.
If corrosive environment is detected or confirmed by engineering, volumetric examination must be done for 20 percent or a maximum of 25 bolts.
FENOC stated that, to date, it had not identified any high strength A325 bolts greater than 1-inch in diameter that are used in ASME Section XI, Subsection IWF applications with a measured yield strength of greater than or equal to 150 ksi. However, a majority, but not all A325 bolts in IWF applications have been identified on plant drawings, and FENOC acknowledged difficulty in locating the Certified lVIaterial Test Reports (CMTRs) for some of the A325 bolts. As such, FENOC stated that it would provide the staff with justification why the IWF A325 bolts do not require volumetric examination. The justification would be based on the A325 bolting specification, a review of the IWF component support drawings and the identified CMTRs, and would provide reasonable assurance that all A325 bolts in IWF applications have a measured yield strength less than 150 ksi using engineering judgment.
ENCLOSURE 2
-2 FENOC stated that, for the A490 IWF bolts, a one-time volumetric examination would be performed of 20 percent of the bolts or 25 bolts maximum. If there is no evidence of cracking, FENOC would then go forward with the IWF Code visual examinations.
The staff stated that, to exclude the IWF A325 bolts from the volumetric examination population, FENOC should provide a properly justified discussion which includes the approximate total population of bolts, the number of bolt CMTRs reviewed, the specified yield strength identified in the bolt specifications, any additional supporting information, and a conclusion.
FENOC agreed to use the volumetric examination method recommended in the GALL Report IWF AMP. FENOC stated that it would perform volumetric examination of 20 percent of the susceptible IWF high strength A490 bolts up to a maximum of 25 bolts each IWF interval, using smart sampling methods.
The staff stated that the proposed approach appears to be acceptable. The FENOC response should include information regarding the IWF interval schedule, including outage schedules, and proposed schedules for the volumetric examinations of IWF high strength A490 bolts. FENOC should clearly state that the total susceptible population will be used to identify the sample population, and the response should include the appropriate revisions to the Davis-Besse license renewal application, such as Appendix A and commitment changes for any program enhancements.
FENOC stated that it plans to submit a response in approximately one week.
There was no further discussion, and the call was concluded.
Action: FENOC will supplement the RAI response.
Memorandum to FENOC from S. Cuadrado de Jesus dated July 12, 2013
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MAY 2, 2013, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource SCuadrado EKeegan EMiller MMahoney DMclntyre, OPA TRileY,OCA BHarris, OGC