UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 19, 2012 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 14, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on November 14, 2011, to discuss and clarify the applicant's responses to the staff's requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station, license renewal application. provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant. A brief description of the stat~s of the items is also

included, The applicant had an opportunity to comment un this summary.

~:~a(li~ject Manager

&~7e~~~~~nch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosures:

1. List of Participants
2. Summary of Telephone Conference Ca!l cc w/encls: Listserv

SUMMARY

OF TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS NOVEMBER 14, 2011 PARTICIPANTS AFFILIATIONS Samuel Cuadrado de Jesus U.S. Nuclear Regulatory Commission (NRC)

Bryce Lehman NRC Abdul Sheikh NRC Cliff Custer FirstEnergy Nuclear Operating Company (FENOC)

Jake Hofelich FENOC Allen McAllister FENOC Richard Bair FENOC Don Kosloff FENOC Enclosure 1

SUMMARY

OF TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION NOVEMBER 14, 2011 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on November 14, 2011, to discuss and clarify the following response to requests for additional information (RAls) B.2.22-5 concerning the Davis-Besse Nuclear Power Station, license renewal application (LRA).

Discussion:

By letter dated September 16, 2011, the applicant provided a response to RAI B.2.22-5 regarding management of the containment vessel exterior surface in the annulus area (sand pocket region). The staff discussed the response with the applicant in a telephone conference call held on October 5, 2011, and agreed to have a future followup conference call to further discuss the staff concerns. The purpose of this conference call was to continue the discussion related to the applicant's response to RAI B.2.22-5 as agreed in the October 5, 2011, conference call.

The staff stated that, based on NRC observation of the annulus moisture barrier during the Cycle 17 Mid-cycle Outage in October 2011, the third bulleted item in license renewal future Commitment 36 needed to be revised to address periodic inspection of the moisture barrier.

The applicant agreed that, while the moisture barrier is periodically inspected, the moisture barrier was not currently identified for inspection in license renewal documents. The applicant agreed to add the moisture barrier inspection to license renewal future Commitment 36.

There was no further discussion, and the call was concluded.

ACTION:

FENOC to provide a supplemental response to RAI B.2.22-5 to revise the third bulleted item in license renewal future Commitment 36 to include periodic inspections of the annulus moisture barrier.

Enclosure 2

... ML 11364AO 17 OFFICE LA:DLR PM:RPB1 :DLR BC:RPB1:DLR NAME YEdmonds SCuadrado de Jesus DMorey DATE 01/10/12 01/12/12 01/19/12 Memorandum to FirstEnergy Nuclear Operating Company from S. Cuadrado de Jesus dated January 19, 2012 SUB~'ECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 14, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource PCooper BHarris SCuadrado EMiller MMahoney ICouret,OPA TReilly, OCA BHarris, OGC