ML24204A001

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports
ML24204A001
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 07/17/2024
From: Robert Kuntz
NRC/NRR/DORL/LPL3
To: Hicks J
Energy Harbor Nuclear Corp
References
Download: ML24204A001 (3)


Text

From: Robert Kuntz Sent: Wednesday, July 17, 2024 1:02 PM To: Jack Hicks (Jack.Hicks@luminant.com)

Cc: Luis Cruz Rosado

Subject:

Request for Additional Information RE: VistraOps fleet Exemption for the requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports

Dear Jack Hick,

By letter dated February 23, 2024, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24054A101), Energy Harbor Nuclear Corp. submitted an exemption request pursuant to the requirements in Title 10 of the Code of Federal Regulations (10 CFR) 50.12(a) for Beaver Valley Power Station, Unit Nos. 1 and 2 (Beaver Valley), Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse), and Perry Nuclear Power Plant, Unit No. 1 (Perry). Effective March 1, 2024, the facility operating licenses for Beaver Valley, Davis-Besse, and Perry were transferred from Energy Harbor Nuclear Generation LLC (owner) and Energy Harbor Nuclear Corp. (operator) to Energy Harbor Nuclear Generation LLC (owner) and Vistra Operations Company LLC (operator) (ML24057A092). Upon completion of this license transfer, Vistra Operations Company, LLC (VistraOps) assumed the responsibility for all licensing actions under NRC review at the time of the transfer and requested that the NRC continue its review of these actions (ML24054A498). The letter requested an exemption to the requirements in 10 CFR 50.71(e)(4) regarding submission of revisions to the Final Safety Analysis Report (FSAR) to allow periodic updates of the FSAR on specified schedules that do not exceed 24 months between successive updates.

The Nuclear Regulatory Commission (NRC) Staff has determined that additional information is required for the staff to complete its review. The NRC staffs requestion for additional information (RAI) is included. During a clarification conducted on July 17, 2024, VistraOps stated that a response should be provided within 30 days therefore the NRC staff anticipates a response by August 16, 2024.

Robert Kuntz Senior Project Manager Office of Nuclear Reactor Regulation Division of Operating Reactors Plant Licensing Branch III

RAI-01

Regulatory Requirements:

The requirements in 10 CFR 50.12(a)(2) state that: "(2) The Commission will not consider granting an exemption unless special circumstances are present. Special circumstances are present whenever-- . . .

(ii) Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule . . . "

The requirements in 10 CFR 50.71(e) state: Each person licensed to operate a nuclear power reactor under the provisions of § 50.21 or § 50.22, and each applicant for a combined license under part 52 of this chapter, shall update periodically, as provided in paragraphs (e) (3) and (4) of this section, the final safety analysis report (FSAR) originally submitted as part of the application for the license, to assure that the information included in the report contains the latest information developed.

The requirements in 10 CFR 50.71(e)(4) state, in pertinent part: Subsequent revisions must be filed annually or 6 months after each refueling outage provided the interval between successive updates does not exceed 24 months. The revisions must reflect all changes up to a maximum of 6 months prior to the date of filling.

Issue:

The exemption request dated February 23, 2024, states: The underlying purpose of the 10 CFR 50.71(e)(4) is to ensure that licensees periodically submit their UFSARs [Updated Final Safety Analysis Reports] to assure that the UFSAR remains up-to-date while reflecting the plant design and operation. The request further states: As required by 10 CFR 50.71(e)(4) a maximum time of 24 months between successive updates and the requirement to reflect changes to the UFSAR up to a maximum of 6 months prior to the date of filing is allowed. The processing and submittal of more frequent revisions to the UFSAR, including all documents incorporated by reference, is not necessary to achieve the underlying purpose of the rule.

The NRC staff notes that in the statements of consideration for the final rule establishing the initial requirement to provide an UFSAR update (May 9, 1980; 45 FR 30614), the Commission explained that it was establishing the requirement to provide an updated reference document to be used in recurring safety analyses performed by the licensee, the Commission, and other interested parties. That rule required updating on an annual basis. In the statements of consideration for the 1992 final rule amending § 50.71(e) (August 31, 1992; 57 FR 39353), the Commission provided an alternative to the annual updating requirement, in which licensees could provide updates 6 months after each refueling outage provided the interval between successive updates to the FSAR does not exceed 24 months. In a response to a comment suggesting that the FSAR update be decoupled from the refueling cycle the Commission explained in the final rule (57 FR 39354), The majority of facility design changes reflected in an updated FSAR are effected during the refueling outage. The use of the refueling cycle interval provides for a current plant status document that is coordinated with plant changes.

Request:

Discuss how the application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule as discussed in the statements of consideration for the initial and revised 10 CFR 50.71(e)(4) rule.

Docket Nos. 50-334, 50-412, 50-346, and 50-440

Hearing Identifier: NRR_DRMA Email Number: 2559

Mail Envelope Properties (SJ0PR09MB108974A1533D17D4CB5FC657F99A32)

Subject:

Request for Additional Information RE VistraOps fleet Exemption for the requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports Sent Date: 7/17/2024 1:01:38 PM Received Date: 7/17/2024 1:01:00 PM From: Robert Kuntz

Created By: Robert.Kuntz@nrc.gov

Recipients:

"Luis Cruz Rosado" <Luis.CruzRosado@nrc.gov>

Tracking Status: None "Jack Hicks (Jack.Hicks@luminant.com)" <jack.hicks@luminant.com>

Tracking Status: None

Post Office: SJ0PR09MB10897.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 5437 7/17/2024 1:01:00 PM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: