UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 U.S. Nuclear Regulatory Commission Public Meeting Summary August 12, 2014

Title:

Public Meeting to Discuss the 2013 Performance of Davis-Besse Nuclear Power Station Meeting Identifier: 20141197 Date of Meeting: Thursday, August 7, 2014 Location: Carroll Township Service Complex, Oak Harbor, OH 43449 Type of Meeting: Category 3 Purpose of Meeting:

Provide opportunities to discuss with the public Nuclear Regulatory Commission (NRC) activities, nuclear power issues, Davis-Besse Station performance for the 2013 calendar year, and NRC inspection activities during the licensees steam generator replacement project.

General Details:

The NRC conducted an open house beginning at 6:00 p.m. eastern daylight time (EDT) where members of the public met informally with NRC staff to discuss Davis-Besse Stations performance and NRC oversight. The meeting was scheduled from 6:00 - 7:30 p.m. EDT and ended about 7:30 p.m.

Nine NRC staff members were present, including the Deputy Director of the Division of Reactor Safety, the Division of Reactor Projects Branch Chief, a Division of Reactor Safety Branch Chief, a Senior Reactor Engineer, a Regional Public Affairs Officer, both Resident Inspectors, a member of the NRC Inspector Generals staff, and the Resident Inspector office Administrative Assistant. No facilitator was needed.

NRC staff members greeted attendees as they arrived and offered a description of the purpose of the meeting and discussion of Davis-Besses 2013 performance as well as NRC inspection activities related to the completed steam generator replacement. Davis-Besse operated safely in 2013, with no significant inspection findings or negative performance indicators. Copies of the NRCs 2013 assessment letter were available. Contact information for the Davis-Besse Resident Inspectors and meeting feedback forms were also provided.

Approximately 20 people participated in the meeting. Three participants asked questions or provided comments. In addition to members of the public, meeting participants included government officials and government staff from the State of Ohio and the Ohio counties of Ottawa and Sandusky, and the licensee.

Summary of Presentations:

No formal presentations were made but handouts were available giving an overview of the Reactor Oversight Process (NUREG/BR-0508) and a summary of NRC 2013 inspection activities at Davis-Besse (ADAMS Accession Number ML14218A054). NRC posters describing the NRCs mission and the reactor oversight process complemented NRC staff member one-on-one discussions with the public. The flexible structure encouraged participants to discuss topics of interest to them with different NRC staff members spread around the room. These discussions included how the NRC assessed Davis-Besses 2013 performance and the NRCs oversight of the facility.

Public Participation Themes:

During the one-on-one discussions between NRC staff and the public the NRC staff addressed questions on the following topics:

  • A void found on the inner wall of the Shield Building once concrete forms were removed in the early part of the steam generator replacement outage and repaired later in that outage (see Davis-Besse Inspection Report 2013010, ML14204A317);
  • Rebar that was damaged while cutting an opening in the Shield Building during the steam generator replacement outage and repaired later in that outage (see Inspection Report 2013010);
  • How a reactor operates and generates electricity;
  • The daily life of a resident inspector including how an inspector assesses issues and overall plant performance;
  • The emergency response role of an inspector; and
  • The allegation process and inspection reports.

Action Items/Next Steps:

  • None.

Attachments:

  • List of Principal Meeting Attendees
  • Meeting Attendance Sign-In Sheets

/RA/___________________

Jamnes L. Cameron, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosures:

1. List of Principal Meeting Attendees
2. Meeting Attendance Sign-In Sheets cc w/encls: Distribution via LISTSERV

PUBLIC MEETING PRINCIPAL ATTENDEES August 7, 2014 NRC Attendees M. Shuaibi, Deputy Director, Division of Reactor Safety J. Cameron, Chief, Division of Reactor Projects, Branch 4 D. Hills, Chief, Division of Reactor Safety Engineering Branch 1 D. Kimble, Senior Resident Inspector T. Briley, Resident Inspector A. Shaikh, Senior Reactor Engineer N. Keller, Site Administrative Assistant P. Chandrathil, Public Affairs Officer E. Keyes, Investigator Government Officials Attendees See Enclosure 2 FirstEnergy Nuclear Operating Company Attendees See Enclosure 2 Members of the Public See Enclosure 2 Enclosure 1

Meeting Attendance Sign-In Sheet Enclosure 2

2 Attachments:

  • List of Principal Meeting Attendees
  • Meeting Attendance Sign-In Sheets

/RA/___________________

Jamnes L. Cameron, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosures:

1. List of Principal Meeting Attendees
2. Meeting Attendance Sign-In Sheets cc w/encls: Distribution via LISTSERV DISTRIBUTION w/encls:

Anthony Bowers RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu ROPassessment.Resource@nrc.gov DOCUMENT NAME: Davis-Besse 2013 EOC Meeting Summary Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME JRutkowski:mt JCameron DATE 08/12/14 08/12/14 OFFICIAL RECORD COPY