UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 21, 2012 LICENSEE:

FirstEnergy Nuclear Operating Company FACILITY:

Davis-Besse Nuclear Power Station

SUBJECT:

SUMMARY

OF THE AUGUST 15, 2012, PUBLIC MEETING TO DISCUSS THE DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 15, 2012, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Energy Education Center in Oak Harbor, OH. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company management to discuss the NRC=s assessment of the safety performance of Davis-Besse Nuclear Power Station, Unit 1, for the period from January 1 through December 31, 2011. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML12199A207 and ML12227A417, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Davis-Besse Nuclear Power Station, Unit 1, in calendar year 2011, which was documented in the March 4, 2011, End-of-Cycle assessment letter, as ML12065A117. As part of this regulatory performance meeting, FirstEnergy briefly responded to the NRC=s assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-346 License Nos. NPF-3

Enclosure:

As Stated cc w/encl: Distribution via ListServ TM

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 21, 2012 LICENSEE:

FirstEnergy Nuclear Operating Company FACILITY:

Davis-Besse Nuclear Power Station

SUBJECT:

SUMMARY

OF THE AUGUST 15, 2012, PUBLIC MEETING TO DISCUSS THE DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 15, 2012, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Energy Education Center in Oak Harbor, OH. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company management to discuss the NRC=s assessment of the safety performance of Davis-Besse Nuclear Power Station, Unit 1, for the period from January 1 through December 31, 2011. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML12199A207 and ML12227A417, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Davis-Besse Nuclear Power Station, Unit 1, in calendar year 2011, which was documented in the March 4, 2011, End-of-Cycle assessment letter, as ML12065A117. As part of this regulatory performance meeting, FirstEnergy briefly responded to the NRC=s assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-346 License Nos. NPF-3

Enclosure:

As Stated cc w/encl: Distribution via ListServ TM DOCUMENT NAME: G:\\DRPIII\\1-Secy\\1-Work In Progress\\EOC CY 2011 (Issued 2012)

Meeting Summary & Slides\\Davis-Besse 2011 EOC Public Meeting Summary.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME PSmagacz:dtp JCameron DATE 08/21/12 08/21/12 OFFICIAL RECORD COPY

Letter to FirstEnergy Nuclear Operating Company from J. Cameron dated August 21, 2012.

SUBJECT:

SUMMARY

OF THE AUGUST 15, 2012, PUBLIC MEETING TO DISCUSS THE DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:

Silas Kennedy RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov

Enclosure Meeting Participants NRC J. Cameron, Chief, Branch 6, Division of Reactor Projects, Region III D. Kimble, Senior Resident Inspector, Davis-Besse A. Wilson, Resident Inspector, Davis-Besse L. Uselding, Public Affairs Officer, Region IV FirstEnergy Nuclear Operating Company B. Boles, Director of Site Operations, Davis-Besse D. Imlay, Director of Performance Improvement, Davis-Besse E. Burnworth, Security Supervisor, Davis-Besse G. Wolf, Regulatory Compliance Supervisor, Davis-Besse U.S. Congress A. Longsworth Orr, Regional Representative for U.S. Senator Sherron Brown M. Patterson, Congressional Aide for U.S. Congressman Dennis Kucinich Ohio Emergency Management Agency B. Martin, Radiological Analyst Ohio Department of Health P. Hintz, Senior Health Physicist Ottawa County D. Jensen, Ottawa County Administrator J. Sass, Ottawa County Commissioner S. Arnold, Ottawa County Commissioner M. Stahl, Ottawa County Commissioner F. Peterson, Director, Ottawa County EMA S. Levorchick, Ottawa County Sheriff