Letter Sequence Other |
---|
TAC:ME4640, Steam Generator Tube Integrity (Approved, Closed) |
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples, L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems., L-11-334, Reply to Request Additional Information for the Review of the License Renewal Application Amendment No. 21, L-12-337, Review of the Safety Evaluation Report with Open Items Related to the License Renewal, L-12-444, Submittal of Contractor Equivalent Margins Assessments for Reactor Vessel Welds (Nonproprietary Versions), L-12-456, Notification of Closure of Commitments Related to the Review of the License Renewal Application, L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45), L-13-330, License Renewal Application Amendment No. 46 - Annual Update, L-13-341, Review of the Safety Evaluation Report Related to the License Renewal of Davis-Besse Nuclear Power Station, L-14-085, License Renewal Application (TAC No. ME4640) Amendment No. 48, L-14-206, License Renewal Application Amendment No. 50 - Annual Update, L-15-120, Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55, L-15-139, License Renewal Reactor Vessel Internals Inspection Plan, L-15-214, License Renewal Application Amendment No. 59 - Annual Update, L-15-309, License Renewal Application Amendment No. 60, L-15-310, C-CSS-099.20-069, Rev 0, Shield Building Laminar Cracking Limits., ML102450565, ML111050091, ML11110A089, ML11110A091, ML11110A092, ML11110A093, ML11110A094, ML11110A095, ML11110A105, ML11110A106, ML11110A107, ML11122A014, ML11126A017, ML11126A018, ML11126A019, ML11126A020, ML11126A021, ML11126A022, ML11126A023, ML11126A024, ML11126A025, ML11126A026, ML11126A032, ML11126A033, ML11126A034, ML11126A035, ML11126A036, ML11126A037, ML11126A038, ML11126A039, ML11126A040, ML11126A041, ML11126A042, ML11126A043... further results
|
MONTHYEARML11126A0882008-01-12012 January 2008 Drawing No. LR-M041B, Revision 1, Piping & Instrument Diagram Primary Service Water System. Job Code 12501 Project stage: Other ML11126A0902008-01-15015 January 2008 Drawing No. LR-OS41A1, Revision 1, Operational Schematic Emergency Diesel Generator Systems. Project stage: Other L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems.2008-01-15015 January 2008 Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems. Project stage: Other ML11126A0682008-05-0505 May 2008 Drawing No. LR-M-037E, Revision 28, Piping & Instrument Diagram Clean Liquid Radioactive Waste System. Project stage: Other ML11126A0652008-08-0606 August 2008 Drawing No. LR-M036B, Revision 1, Piping & Instrument Diagram Component Cooling Water System. Project stage: Other ML11126A0592008-10-0909 October 2008 Drawing No. LR-M033A, Revision 1, Piping & Instrument Diagram High Pressure Injection. Project stage: Other ML11126A0632008-10-10010 October 2008 Drawing No. LR-M033B, Revision 1, Piping & Instrument Diagram Decay Heat Train 1. Project stage: Other ML11126A0702008-10-10010 October 2008 Drawing No. LR-M033C, Revision 1, Piping & Instrument Diagram Decay Heat Train 2. Project stage: Other ML11126A0742008-11-0606 November 2008 Drawing No. LR-M043, Revision 1, Piping & Instrument Diagram Auxiliary Building Chilled Water System. Project stage: Other ML11126A0832008-12-18018 December 2008 Drawing No. LR-M038C, Revision 2, Piping & Instrument Diagram Gaseous Radioactive Waste System. Job Code 12501 Project stage: Other ML11126A0712009-04-0707 April 2009 Drawing No. LR-M034, Revision 1, Piping & Instrument Diagram Emerg. Core Cooling System Ctmt. Spray & Core Flooding Systems. Project stage: Other ML11126A0892009-04-0707 April 2009 Drawing No. LR-OS002, Revision 1, Operational Schematic Makeup and Purification System. Project stage: Other ML1024505652010-08-27027 August 2010 License Renewal Application and Ohio Coastal Management Program Consistency Certification Project stage: Other ML1104500462011-02-17017 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Fire Protection Project stage: RAI ML11126A0792011-02-25025 February 2011 Drawing No. LR-M900A, Revision 0, Instrument Air System Piping Schematic. Project stage: Other ML1104205972011-02-28028 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 2.4 Project stage: RAI ML1106801722011-03-17017 March 2011 Request for Additional Information on the Reactor Vessel Surveillance Aging Management Program, Time-Limited Aging Analyses for Neutron Embrittlement of the Rv and Internals, and Other TLAAs for the Review of the Davis-Besse Nuclear Power S Project stage: RAI ML1107007322011-03-18018 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.2 & 2.3 Project stage: RAI L-11-078, Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 12011-03-18018 March 2011 Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 1 Project stage: Response to RAI ML11068A0002011-03-21021 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 4.7 (TAC Number ME4640) Project stage: RAI L-11-079, Reply to Request for Additional Information for the Review of the License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-11-089, Reply to Request for Additional Information for the Review License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review License Renewal Application Project stage: Response to RAI ML1108206242011-03-30030 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.1 (Tac No. ME4640) Project stage: RAI ML1109002952011-03-31031 March 2011 Safety Evaluation Report Related to the License Renewal of Salem Nuclear Generating Station Project stage: Approval ML1108204902011-04-0505 April 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 1 Project stage: RAI ML11110A0932011-04-15015 April 2011 Drawing No. M-037D, Rev. 21, Clean Liquid Radioactive Waste System Project stage: Other ML11110A1072011-04-15015 April 2011 Drawing No. M-045, Rev. 56, Chemical Addition Systems Project stage: Other ML11110A1062011-04-15015 April 2011 Drawing No. M-042C, Rev. 33, Sampling System Sh. 3 Project stage: Other ML11110A1052011-04-15015 April 2011 Drawing No. M-040A, Rev. 76, Reactor Coolant System Details Project stage: Other ML11110A0952011-04-15015 April 2011 Drawing No. M-039B, Rev. 18, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A0942011-04-15015 April 2011 Drawing No. M-039A, Rev. 33, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A0922011-04-15015 April 2011 Drawing No. M-037C, Rev. 30, Clean Liquid Radioactive Waste System Project stage: Other L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples2011-04-15015 April 2011 Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples Project stage: Other L-11-107, Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application...2011-04-15015 April 2011 Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application... Project stage: Response to RAI ML11110A0882011-04-15015 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application, Sections 2.2 & 2.3, License Renewal Application Amendment No. 3, and Revised License Renewal Project stage: Response to RAI ML11110A0912011-04-15015 April 2011 Drawing No. M-011, Rev. 61, Domestic Water System Project stage: Other ML11110A0892011-04-15015 April 2011 Drawing No. M-0060, Rev. 52, Auxiliary Feedwater System Project stage: Other ML1110500912011-04-19019 April 2011 Scoping and Screening Audit Report Regarding the Davis-Besse Nuclear Power Station License Renewal Application Project stage: Other L-11-115, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 42011-04-20020 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 4 Project stage: Response to RAI ML1109807182011-04-20020 April 2011 Request for Additional Information for the Review of the Davis-Bessie Nuclear Power Station - Batch 2 Project stage: RAI ML11126A0362011-04-29029 April 2011 Drawing No. LR-M017D, Revision 1 Piping & Instrument Diagram, Steam Blackout Diesel Generator. Project stage: Other ML11126A0352011-04-29029 April 2011 Drawing No. LR-M017C, Revision 2, Piping & Instrument Diagram, Fuel Oil. Project stage: Other ML11126A0342011-04-29029 April 2011 Drawing No. LR-M017B, Revision 1, Piping & Instrument Diagram, Diesel Generators Air Start. Project stage: Other ML11126A0332011-04-29029 April 2011 Drawing No. LR-M016B, Revision 1, Piping & Instrument Diagram Station Fire Protection System Project stage: Other ML11126A0322011-04-29029 April 2011 Drawing No. LR-M016A, Revision 1, Piping & Instrument Diagram Station Fire Protection System Project stage: Other ML11126A0262011-04-29029 April 2011 Drawing No. LR-M010C, Revision 1, Piping & Instrument Diagram Make-up Water Treatment System Project stage: Other ML11126A0252011-04-29029 April 2011 Drawing No. LR-M010A, Revision 1, Piping & Instrument Diagram Make-Up Water Treatment System Project stage: Other ML11126A0242011-04-29029 April 2011 Drawing No. LR-M009B, Revision 1, Piping & Instrument Diagram Cooling Water System Project stage: Other ML11126A0192011-04-29029 April 2011 Drawing No. LR-M003A, Revision 1, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 1 Project stage: Other ML11126A0452011-04-29029 April 2011 Drawing No. LR-M024H, Revision 1, Piping & Instrument Diagram, No. 2 Main and Auxiliary Turbine Driven Feed Pumps. Project stage: Other 2011-02-25
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-059, Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-0022023-03-0909 March 2023 Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-002 L-22-212, CFR 50.55a Request RP-5 Regarding Inservice Pump Testing2023-03-0606 March 2023 CFR 50.55a Request RP-5 Regarding Inservice Pump Testing L-23-048, Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2023-03-0101 March 2023 Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-253, Submittal of Pressure and Temperature Limits Report, Revision 52023-01-10010 January 2023 Submittal of Pressure and Temperature Limits Report, Revision 5 L-22-284, Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS)2022-12-28028 December 2022 Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS) L-22-211, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2022-09-29029 September 2022 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-22-216, Submittal of Pressure and Temperature Limits Report. Revision 42022-09-27027 September 2022 Submittal of Pressure and Temperature Limits Report. Revision 4 L-22-213, Occupational Radiation Exposure Report for Year 2021 - Correction2022-09-23023 September 2022 Occupational Radiation Exposure Report for Year 2021 - Correction L-22-129, Submittal of the Updated Final Safety Analysis Report, Revision 342022-09-20020 September 2022 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-22-194, Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events2022-09-19019 September 2022 Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events L-22-203, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-22-152, Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan2022-07-0505 July 2022 Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan L-22-068, Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report2022-06-30030 June 2022 Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report L-22-037, 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2022-06-30030 June 2022 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-149, Post Accident Monitoring Report2022-06-23023 June 2022 Post Accident Monitoring Report L-22-153, Readiness for NRC Supplemental Inspection Required for a White Finding2022-06-22022 June 2022 Readiness for NRC Supplemental Inspection Required for a White Finding L-22-098, Withdrawal of Proposed Inservice Inspection Alternative RR-A22022-06-22022 June 2022 Withdrawal of Proposed Inservice Inspection Alternative RR-A2 L-22-136, Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage2022-06-0707 June 2022 Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage L-22-102, Report of Facility Changes, Tests, and Experiments2022-05-16016 May 2022 Report of Facility Changes, Tests, and Experiments L-22-092, Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report for the Davis-Besse Nuclear Power Station - 20212022-05-16016 May 2022 Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report for the Davis-Besse Nuclear Power Station - 2021 L-22-124, Response to Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building2022-05-12012 May 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building L-22-047, Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 12022-05-10010 May 2022 Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 1 L-22-127, Readiness for NRC Supplemental Inspection Required for a Greater than Green Finding2022-05-0606 May 2022 Readiness for NRC Supplemental Inspection Required for a Greater than Green Finding L-22-089, Occupational Radiation Exposure Report for Year 20212022-04-12012 April 2022 Occupational Radiation Exposure Report for Year 2021 L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage2022-03-22022 March 2022 Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage L-22-059, Response to Request for Additional Information on Proposed Inservice Test Alternative RP-32022-03-21021 March 2022 Response to Request for Additional Information on Proposed Inservice Test Alternative RP-3 L-22-074, Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-15015 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations L-22-061, Ile Post Exam Letter L-22-0612022-02-24024 February 2022 Ile Post Exam Letter L-22-061 L-22-023, Retrospective Premium Guarantee2022-02-17017 February 2022 Retrospective Premium Guarantee L-21-266, Response to Request for Additional Information on Proposed Inservice Inspection Alternative RR-A22022-01-27027 January 2022 Response to Request for Additional Information on Proposed Inservice Inspection Alternative RR-A2 L-20-289, Emergency Plan Amendment Request2022-01-19019 January 2022 Emergency Plan Amendment Request L-21-290, Response to NRC Inspection Report 05000346/2021091, EA-21-1762021-12-21021 December 2021 Response to NRC Inspection Report 05000346/2021091, EA-21-176 2023-09-12
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML22277A6012022-10-14014 October 2022 Issuance of Amendment No. 304 Revising the Design Basis for the Shield Building Containment Structure L-20-163, License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Facility Technical Specifications2020-07-27027 July 2020 License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Facility Technical Specifications L-20-188, ISFSI, Davis-Besse Unit 1, and ISFSI, Perry, Unit 1, and ISFSI, Decommissioning Trust: Amendments to Decommissioning Trust Agreements to Update Company Names2020-06-26026 June 2020 ISFSI, Davis-Besse Unit 1, and ISFSI, Perry, Unit 1, and ISFSI, Decommissioning Trust: Amendments to Decommissioning Trust Agreements to Update Company Names L-19-233, License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b2019-11-14014 November 2019 License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b L-19-219, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2019-09-25025 September 2019 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-19-200, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI - Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2019-08-29029 August 2019 ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI - Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML19130A1952019-05-0808 May 2019 Letter - FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition L-19-073, ISFSI, Davis-Besse, Unit 1, ISFSI, and Perry, Unit 1, ISFSI - Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2019-04-26026 April 2019 ISFSI, Davis-Besse, Unit 1, ISFSI, and Perry, Unit 1, ISFSI - Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-19-062, Supplement to License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1. Definitions, 5.0., Administrative Controls. for Permanently Defueled Condition2019-02-27027 February 2019 Supplement to License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1. Definitions, 5.0., Administrative Controls. for Permanently Defueled Condition L-18-271, License Amendment Request - Proposed Post-Shutdown Emergency Plan2019-02-0505 February 2019 License Amendment Request - Proposed Post-Shutdown Emergency Plan L-18-242, License Amendment Request - Proposed License and Associated Technical Specification Changes for Permanently Defueled Condition2019-02-0505 February 2019 License Amendment Request - Proposed License and Associated Technical Specification Changes for Permanently Defueled Condition L-18-249, Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 8052018-11-20020 November 2018 Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 L-18-254, License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled Condition2018-10-22022 October 2018 License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled Condition L-18-203, Supplemental Information Regarding a Pending Administrative License Amendment Request to Reflect a Change in the Entity Providing a $400 Million Support Agreement2018-08-23023 August 2018 Supplemental Information Regarding a Pending Administrative License Amendment Request to Reflect a Change in the Entity Providing a $400 Million Support Agreement L-17-159, Administrative License Amendment Request to Reflect a Change in the Entity Providing a $400 Million Support Agreement2017-05-18018 May 2017 Administrative License Amendment Request to Reflect a Change in the Entity Providing a $400 Million Support Agreement L-17-026, Regarding MRP-227-A Applicant Action Item 8: Time-Limited Aging Analysis (TLAA) Regarding Reactor Vessel Internals Loss of Ductility at 60 Years2017-01-23023 January 2017 Regarding MRP-227-A Applicant Action Item 8: Time-Limited Aging Analysis (TLAA) Regarding Reactor Vessel Internals Loss of Ductility at 60 Years L-16-304, Supplement to Request for License Amendment Approval Delay2016-10-25025 October 2016 Supplement to Request for License Amendment Approval Delay L-16-020, Request for Licensing Action to Revise the Emergency Plan2016-02-17017 February 2016 Request for Licensing Action to Revise the Emergency Plan L-16-030, Request for an Amendment to Revise Technical Specification 5.5.3, Radioactive Effluents Controls Program.2016-02-0909 February 2016 Request for an Amendment to Revise Technical Specification 5.5.3, Radioactive Effluents Controls Program. L-15-341, License Amendment Request to Modify Technical Specifications 5.3.12015-11-19019 November 2015 License Amendment Request to Modify Technical Specifications 5.3.1 L-15-309, License Renewal Application Amendment No. 602015-10-0606 October 2015 License Renewal Application Amendment No. 60 L-15-214, License Renewal Application Amendment No. 59 - Annual Update2015-06-29029 June 2015 License Renewal Application Amendment No. 59 - Annual Update L-15-192, Supplemental Information for the Review of the License Renewal Application (TAC No. ME4640) and License Renewal Application Amendment No. 582015-06-12012 June 2015 Supplemental Information for the Review of the License Renewal Application (TAC No. ME4640) and License Renewal Application Amendment No. 58 L-15-166, Supplemental Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, Reactor Vessel Internals Inspection Plan (TAC No. ME4640) and License Renewal Application Amendment No. 562015-05-20020 May 2015 Supplemental Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, Reactor Vessel Internals Inspection Plan (TAC No. ME4640) and License Renewal Application Amendment No. 56 L-15-120, Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 552015-04-0808 April 2015 Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55 L-15-117, License Amendment Request to Revise Emergency Diesel Generator Minimum Voltage and Frequency Surveillance Requirements2015-04-0101 April 2015 License Amendment Request to Revise Emergency Diesel Generator Minimum Voltage and Frequency Surveillance Requirements L-14-407, Request to Amend Technical Specification 5.5.15, Containment Leakage Rate Testing Program2014-12-19019 December 2014 Request to Amend Technical Specification 5.5.15, Containment Leakage Rate Testing Program L-14-297, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640) and License Renewal Application Amendment No. 532014-09-16016 September 2014 Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640) and License Renewal Application Amendment No. 53 L-14-206, License Renewal Application Amendment No. 50 - Annual Update2014-06-23023 June 2014 License Renewal Application Amendment No. 50 - Annual Update L-14-085, License Renewal Application (TAC No. ME4640) Amendment No. 482014-02-19019 February 2014 License Renewal Application (TAC No. ME4640) Amendment No. 48 L-13-330, License Renewal Application Amendment No. 46 - Annual Update2013-09-20020 September 2013 License Renewal Application Amendment No. 46 - Annual Update L-12-397, Request to Amend the Price-Anderson Indemnities and Notification of a Name Change to Documents of Regulatory Interest2013-02-19019 February 2013 Request to Amend the Price-Anderson Indemnities and Notification of a Name Change to Documents of Regulatory Interest L-13-040, License Amendment Request for Proposed Revision of Technical Specification (TS) 3.4.17, Steam Generator (SG) Tube Integrity; TS 3.7.18, Steam Generator Level; TS 5.5.8, Steam Generator Program; and TS 5.6.6..2013-01-18018 January 2013 License Amendment Request for Proposed Revision of Technical Specification (TS) 3.4.17, Steam Generator (SG) Tube Integrity; TS 3.7.18, Steam Generator Level; TS 5.5.8, Steam Generator Program; and TS 5.6.6.. ML12229A1392012-08-0909 August 2012 License Renewal Application Amendment 30 - Annual Update L-12-070, License Amendment Request to Revise Emergency Diesel Generator Minimum Voltage Surveillance Requirements, and Add Figure Axis Labels2012-05-23023 May 2012 License Amendment Request to Revise Emergency Diesel Generator Minimum Voltage Surveillance Requirements, and Add Figure Axis Labels ML1126402462011-09-20020 September 2011 License Amendment Request to Change the Name of an Owner Licensee to Firstenergy Nuclear Generation, LLC L-11-097, License Amendment Request to Modify the Special Visual Inspection Requirements of Technical Specification 5.5.8, Steam Generator (SG) Program.2011-05-20020 May 2011 License Amendment Request to Modify the Special Visual Inspection Requirements of Technical Specification 5.5.8, Steam Generator (SG) Program. ML1024505632010-08-31031 August 2010 Enclosures to Davis-Besse, Unit 1, Letter L-10-221, License Renewal Application, Section 3.5 Through Appendix E, References 2.3-1 L-10-221, Enclosures to Davis-Besse, Unit 1, Letter L-10-221, License Renewal Application, Appendix E, Section 2.4 Through References E.112010-08-31031 August 2010 Enclosures to Davis-Besse, Unit 1, Letter L-10-221, License Renewal Application, Appendix E, Section 2.4 Through References E.11 L-09-143, License Amendment Request to Exclude Source Range Neutron Flux Instrument Channel Preamplifier from Channel Calibration Requirements of Technical Specification 3.3.9, Source Range Neutron Flux, & TS 3.9.2, Nuclear Instrumentation.2009-06-0202 June 2009 License Amendment Request to Exclude Source Range Neutron Flux Instrument Channel Preamplifier from Channel Calibration Requirements of Technical Specification 3.3.9, Source Range Neutron Flux, & TS 3.9.2, Nuclear Instrumentation. L-09-072, License Amendment Request to Incorporate the Use of Alternate Methodologies for Development of Reactor Pressure Vessel Pressure-Temperature Limit Curves and Request for Exemption from Certain Requirements Contained in 10 Cfr.2009-04-15015 April 2009 License Amendment Request to Incorporate the Use of Alternate Methodologies for Development of Reactor Pressure Vessel Pressure-Temperature Limit Curves and Request for Exemption from Certain Requirements Contained in 10 Cfr. L-09-025, ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-03-25025 March 2009 ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. L-08-159, Supplement to License Amendment Request: Conversion of Current Technical Specifications (CTS) to Improved Technical Specifications (ITS) - Volumes 5, 6, 7, 9, 11, and 15, TAC No. MD63982008-05-16016 May 2008 Supplement to License Amendment Request: Conversion of Current Technical Specifications (CTS) to Improved Technical Specifications (ITS) - Volumes 5, 6, 7, 9, 11, and 15, TAC No. MD6398 ML0814804712008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 15, (Revision 1), Chapter 4.0 - Design Features ML0814804692008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 11, (Revision 1), Section 3.6 - Containment Systems ML0814804682008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 9, (Revision 1), Section 3.4 - Reactor Coolant System (RCS) ML0814804672008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 7, (Revision 1), Section 3.2 - Power Distribution Limits ML0814804662008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 6, (Revision 1), Section 3.1 - Reactivity Control Systems 2023-09-12
[Table view] |
Text
FENOC' 5501 North State Route 2
'- Oak Harbor, Ohio 43449 FirstEnergy Nuclear Operating Company Brian D. Boles 419-321-7676 Vice President, Fax: 419-321-7582 Nuclear October 6, 2015 L-15-309 10 CFR 54 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License Number NPF-3 License Renewal Application Amendment No. 60 (TAC No. ME4640)
By letter dated August 27, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102450565), FirstEnergy Nuclear Operating Company (FENOC) submitted an application pursuant to Title 10 of the Code of Federal Regulations, Part 54 for renewal of Operating License NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse). Based on the results of the Shield Building monitoring activities performed in 2015, and discussions during the Advisory Committee on Reactor Safeguards License Renewal Subcommittee Meeting held September 23, 2015, the License Renewal Shield Building Monitoring Program is revised to include additional actions.
The Enclosure provides Amendment No. 60 to the Davis-Besse LRA.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.
I declare under penalty of perjury that the foregoing is true and correct. Executed on October _fE__, 2015.
Sincerely, Brian D. Boles
Davis-Besse Nuclear Power Station, Unit No. 1 L-15-309 Page 2
Enclosure:
Amendment No. 60 to the Davis-Besse License Renewal Application cc: NRC DLR Project Manager NRC Region Ill Administrator cc: w/o Enclosure NRC DLR Director NRR DORL Project Manager NRC Resident Inspector Utility Radiological Safety Board
Enclosure Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse)
Letter L-15-309 Amendment No. 60 to the Davis-Besse License Renewal Application Page 1 of 14 License Renewal Application Sections Affected Section A.1 .43 Section B.2.43 The Enclosure identifies the change to the License Renewal Application (LRA) by Affected LRA Section, LRA Page No., and Affected Paragraph and Sentence. The count for the affected paragraph, sentence, bullet, etc. starts at the beginning of the affected Section or at the top of the affected page, as appropriate. Below each section the reason for the change is identified, and the sentence affected is printed in italics with deleted text Jinod 01:1t and added text underlined.
Enclosure L-15-309 Page 2of14 Affected LRA Section LRA Page No. Affected Paragraph and Sentence A.1.43 Page A-25 2 new Paragraphs Based on the results of the Shield Building monitoring activities performed in 2015, and discussions during the Advisory Committee on Reactor Safeguards License Renewal Subcommittee Meeting held September 23, 2015, LRA Section A.1.43, "Shield Building Monitoring Program," is revised to read as follows:
A.1.43 Shield Building Monitoring Program The Shield Building Monitoring Program is a prevention and condition-monitoring program for Davis-Besse. The program consists of inspections of the Shield Building Wall concrete and reinforcing steel (rebar). The inspections conducted as part of the Shield Building Monitoring Program supplement the inspections conducted as part of the Structures Monitoring Program.
The program monitors for cracking, change of material properties and loss of material of concrete. The program also monitors for corrosion of the concrete rebar. As a preventive action of this program, the Shield Building Wall, Shield Building Dome and Shield Building Emergency Air Lock Enclosure wall exterior concrete coatings are inspected at a five-year interval for evidence of loss of effectiveness. Also, the Shield Building Wall, Shield Building Dome and Shield Building Emergency Air Lock Enclosure wall exterior concrete coatings will be reapplied at a fifteen-year interval.
Visual inspections are performed on rebar (when exposed), coatings, core bore and core bore sample surfaces in accordance with an implementing procedure by inspectors qualified as described in Chapter 7 of American Concrete Institute (ACI) Report ACI 349.3R, "Evaluation of Existing Nuclear Safety-Related Concrete Structures." The quantitative acceptance criteria for coatings from Chapter 5, Sections 5.1.4 and 5.2.4, of ACI Report 349.3R are used.
The core bore visual inspections are performed on a representative sample of Shield Building Wall structural subcomponents by inspection of the internal surfaces of core bores. The locations for the inspections are chosen from the core bores that have been installed in the subcomponents of the Shield Building Wall, including new core bores installed to identify changes in the limits of cracking in areas with previously identified crack propagation. The representative sample size includes a minimum of 2328 core bore inspection locations in the subcomponent population (defined as Shield Building Wall subcomponents
Enclosure L-15-309 Page 3of14 having the same material, environment, and aging effect combination). The 2328 core bore location distribution has been chosen to include core bore inspections in 8~ of the 10 flute shoulders with a high pre valance of event-driven laminar cracking. This distribution also covers shell sections above elevation 780 feet with 4 core bores (2 pairs), and each Main Steam Line penetration area with one core bore. In addition, past evidence of crack propagation is considered in choosing future inspection locations.
The Shield Building Monitoring Program includes periodic scheduled inspections to ensure that the existing environmental conditions are not causing material degradation that could result in loss of Shield Building intended functions during the period of extended operation.
The Shield Building Monitoring Program also includes the performance of Impulse Response (JR) mapping. IR mapping will be performed on eight 100 square foot areas; four areas will be performed in 2016. and four areas in 2018.
Two of these grids will be in areas awav from existing core bores. but in known crack areas to monitor anv changes in the leading edges. Two of these grids will be in areas not currently known to contain laminar cracking and away from existing core bores to establish cracking has not expanded into these areas. The locations for inspection by IR will be chosen based on a sample of the exposed exterior of the Shield Building and will be conducted to identify changes in the limits of cracking outside the areas inspected by core bores.
Additionally, IR mapping is used to supplement visual inspections at areas of identified propagation in leading edge core bores. In these cases. IR mapping is completed on a minimum area of 100 square feet in the vicinity of the core bore to provide a relative indication of the extent of cracking propagation for condition monitoring. JR mapping is performed in accordance with vendor procedures.
Implementation of this program ensures that the intended functions of the Shield Building and Shield Building Emergency Air Lock Enclosure are maintained during the period of extended operation.
Enclosure L-15-309 Page 4of14 Affected LRA Section LRA Page No. Affected Paragraph and Sentence 8.2.43 Page B-166 Program Description; Detection of Aging Effects; Monitoring and Trending; Acceptance Criteria; and Operating Experience (paragraphs 1 & 2)
Based on the results of the Shield Building monitoring activities performed in 2015 and discussions during a recent Advisory Committee on Reactor Safeguards License Renewal Subcommittee Meeting, LRA Section B.2.43, "Shield Building Monitoring Program," is revised to read as follows:
8.2.43 SHIELD BUILDING MONITORING PROGRAM Program Description The Shield Building Monitoring Program is a new plant-specific prevention and condition-monitoring program for Davis-Besse. The program will consist of inspections of the Shield Building concrete and reinforcing steel (rebar). The inspections, conducted as part of the Shield Building Monitoring Program will supplement the inspections conducted as part of the Structures Monitoring Program.
The program will monitor for cracking, change of material properties and loss of material of concrete. The program also will monitor for corrosion of the concrete rebar. As a preventive action of this program, the Shield Building Wall, Shield Building Dome and Shield Building Emergency Air Lock Enclosure wall exterior concrete coatings will be inspected at a five-year interval for evidence of loss of effectiveness. Also, the Shield Building Wall, Shield Building Dome and Shield Building Emergency Air Lock Enclosure wall exterior concrete coatings will be reapplied at a fifteen-year interval.
Visual inspections will be performed on rebar (when exposed), core bore and core bore sample (concrete core) surfaces in accordance with an implementing procedure by inspectors qualified as described in Chapter 7 of American Concrete Institute (ACI) Report ACI 349.3R, "Evaluation of Existing Nuclear Safety-Related Concrete Structures." The quantitative acceptance criteria for coatings from Chapter 5, Sections 5.1.4 and 5.2.4, of ACI Report 349.3R will be used.
Enclosure L-15-309 Page 5of14 The Shield Building Monitoring Program will include periodic scheduled inspections to ensure that the existing environmental conditions are not causing material degradation that could result in loss of Shield Building intended functions during the period of extended operation.
The Shield Building Monitoring Program will also include the performance of Impulse Response (JR) mapping. JR mapping will be performed on eight 100 square foot areas; four areas will be performed in 2016, and four areas in 2018.
Two of these grids will be in areas awav from existing core bores, but in known crack areas to monitor any changes in the leading edges. Two of these grids will be in areas not currently known to contain laminar cracking and away from existing core bores to establish cracking has not expanded into these areas. The locations for inspection by JR will be chosen based on a sample of the exposed exterior of the Shield Building and will be conducted to identify changes in the limits of cracking outside the areas inspected by core bores.
Additionallv. JR mapping will be used to supplement visual inspections at areas of identified propagation in leading edge core bores. In these cases, JR mapping will be completed on a minimum area of 100 square feet in the vicinity of the core bore to provide a relative indication of the extent of cracking propagation for condition monitoring. JR mapping will be performed in accordance with vendor procedures.
Implementation of this program will ensure that the intended functions of the Shield Building and Shield Building Emergency Air Lock Enclosure are maintained during the period of extended operation.
NUREG-1801 Consistency The Shield Building Monitoring Program is a new plant-specific Davis-Besse program for license renewal. While NUREG-1801 includes a Structures Monitoring Program (Xl.S6), the Davis-Besse Shield Building Monitoring Program is considered plant-specific, and is evaluated against the ten elements described in Appendix A of the Standard Review Plan of License Renewal Applications for Nuclear Power Plants, NUREG-1800.
Aging Management Program Elements The results of an evaluation of each program element are provided below.
Enclosure L-15-309 Page 6of14 coatings on the Shield Building Wall, the Shield Building Dome and the Shield Building Emergency Air Lock Enclosure walls.
The program will include periodic inspections to ensure that the existing environmental conditions are not causing material degradation that could result in a loss of any of the intended functions of the Shield Building or the Shield Building Emergency Air Lock Enclosure during the period of extended operation.
- Preventive Actions As part of the Shield Building Monitoring Program, the coatings on the exterior concrete Shield Building Wall, Shield Building Dome and Shield Building Emergency Air Lock Enclosure walls will be inspected at a five-year interval to verify continuing effectiveness during the period of extended operation. The inspections will be conducted in accordance with the implementing procedure by inspectors qualified as described in Chapter 7 of ACI Report 349.3R.
Also, the Shield Building Wall, Shield Building Dome and Shield Building Emergency Air Lock Enclosure wall exterior concrete coatings will be reapplied at a fifteen-year interval.
- Parameters Monitored or Inspected The Shield Building Monitoring Program will inspect parameters directly related to potential degradation of the components under review, including visual evidence of cracking, change of material properties, loss of material and corrosion. Also, the Shield Building Wall, Shield Building Dome and Shield Building Emergency Air Lock Enclosure walls exterior concrete coatings will be inspected for loss of effectiveness in accordance with the implementing procedure by inspectors qualified as described in Chapter 7 of ACI Report 349.3R.
The parameters to be inspected will include visual evidence of surface degradation, such as cracking, change in material properties, loss of material and corrosion. Observed conditions may indicate a need to conduct augmented inspections, testing or analyses. American Concrete Institute (ACI) Report 349.3R, "Evaluation of Existing Nuclear Safety-Related Concrete Structures," and ANSl/ASCE 11 90, "Guideline for Structural Condition Assessments of Existing Buildings," provide guidance for the selection of parameters to be monitored or inspected.
Enclosure L-15-309 Page 7of14 Parameters Monitored or Inspected and Potential Aging Effects Potential Aging Potential Aging Parameters Inspection and Testing Effect Mechanisms Monitored Methods Freezing of water that Surface condition of core bores Cracking has permeated the and core bore samples, and Visual (Concrete) concrete change in crack conditions Change of Leaching of calcium Surface condition of core Material Visual hydroxide from concrete bores and core bore samples Properties Freezing of water that Loss of Material Surface condition of core has permeated the Visual (Concrete) bores and core bore samples concrete Loss of Material Surface condition of rebar, Corrosion Visual (Rebar) when exposed Loss of Coating Loss of ability to perform Condition of the coatings Visual Effectiveness its protective action
- Detection of Aging Effects The Shield Building Monitoring Program provides for detection of aging effects prior to the loss of Shield Building intended functions. The inspections, testing and analyses of the Shield Building concrete and rebar that was done to support the root cause evaluation report, "Concrete Crack within Shield Building Temporary Access Opening", and the followup report, "Shield Building Laminar Crack Propagation", provide a baseline for future Shield Building Monitoring Program activities.
Periodic visual inspections will be performed in accordance with an implementing procedure by inspectors qualified as described in Chapter 7 of ACI Report 349.3R. The visual inspections will be performed on a representative sample of Shield Building Wall structural subcomponents by inspection of the internal surfaces of core bores. The locations of the inspections will be chosen from the core bores that have been installed in the subcomponents of the Shield Building Wall, including new core bores installed to identify changes in the limits of cracking in areas with previously identified crack propagation. The representative sample size includes 2328 core bore inspection locations in the subcomponent population (defined as Shield Building Wall subcomponents having the same material, environment, and aging effect combination). A minimum of 10 of the core bores at inspection locations are currently uncracked; however, are adjacent to areas of known cracking. This strategic location, and selection of core bores provides FENOC with the ability to monitor for crack propagation. The 2328 core bore location distribution has been chosen to include core bore
Enclosure L-15-309 Page 8 of 14 inspections in 8~ of the 10 flute shoulders with a high prevalence of event-driven laminar cracking. This distribution also covers shell sections above elevatiori 780 feet with 4 core bores (2 pairs), and each Main Steam Line penetration area with one core bore. In addition, past evidence of crack propagation will be considered in choosing future inspection locations. Visual inspections wut be supplemented by other estab!ished nondestructive 8*amination (l\IDE) techniques and testing, as appropriate.
The initial frequency of visual inspection of core bores and core bore samples will be based on the results of inspections conducted before the period of extended operation. The first inspection conducted during the period of extended operation is scheduled for 2017 and the next inspection is scheduled for 2018. If no aging effects are identified by the one-year interval visual inspections (defined as no discernable change in crack width or the confirmation that no visible cracks have developed in core bores that previously had no visible cracks), then the frequency of visual inspections may be changed to at least once every two years through 2026. If no aging effects are identified by the two-year interval visual inspections, then the frequency of visual inspections may be changed to at least once every four years. Any evidence of degradation will be documented and evaluated through the FENOC Corrective Action Program. The evaluation will include a determination of the need for any required change to the inspection schedule or parameters that need to be inspected.
Visual inspections will be supplemented by other established nondestructive examination (NOE) techniques and testing. The Shield Building Monitoring Program includes the performance of JR mapping. JR mapping will be performed on eight 100 square foot areas: four areas will be performed in 2016. and four areas in 2018. Two of these grids will be in areas away from existing core bores. but in known crack areas to monitor any changes in the leading edges. Two of these grids will be in areas not currently known to contain laminar cracking and away from existing core bores to establish cracking has not expanded into these areas. The locations for inspection bv IR will be chosen based on a sample of the exposed exterior of the Shield Building and will be conducted to identify changes in the limits of cracking outside the areas inspected by core bores.
Additionallv. IR mapping will be used to supplement visual inspections at areas of identified propagation in leading edge core bores. In these cases. JR mapping will be completed on a minimum area of 100 square feet in the vicinity of the core bore to provide a relative indication of the extent of cracking propagation for condition monitoring. JR mapping will be performed
Enclosure L-15-309 Page 9of14 in accordance with vendor procedures. If crack growth is determined to have occurred. it will be entered into the FENOC Corrective Action Program.
The exterior concrete coatings of the Shield Building Wall, Shield Building Dome, and Shield Building Emergency Air Lock walls, will be inspected at least once every five years in accordance with the implementing procedure.
The coatings inspectors will be qualified as described in Chapter 7 of ACI Report 349.3R, "Evaluation of Existing Nuclear Safety-Related Concrete Structures." The frequency of the coatings inspections may be adjusted based on observed coating conditions, any required reapplication of a coating, or on the recommendations of a coating manufacturer.
- Monitoring and Trending The Shield Building Monitoring Program will include a baseline inspection, followed by periodic inspections. Visual inspections will be performed in accordance with the implementing procedure by personnel qualified as described in Chapter 7 of ACI Report 349.3R. The representative sample size includes a minimum of 2328 core bore inspection locations in the Shield Building Wall subcomponent population having the same material, environment, and aging effect combination. A minimum of ::/-014 of the core bores at inspection locations are currently uncracked; however, are adjacent to areas of known cracking. This strategic location, and selection of core bores provides FENOC with the ability to monitor for crack propagation. The 2328 core bore location distribution has been chosen to include core bore inspections in 8~ of the 10 flute shoulders with a high prevalence of event-driven laminar cracking. This distribution also covers shell sections above elevation 780 feet with 4 core bores (2 pairs), and each Main Steam Line penetration area with one core bore. In addition, past evidence of crack propagation will be considered in choosing inspection locations. In areas of identified laminar crack planer propagation. JR mapping will be completed on a minimum area of 100 square feet in the vicinity of the core bore to provide a relative indication of the extent of cracking propagation for condition monitoring. Inspection findings will be documented and evaluated by assigned engineering personnel such that the results can be trended.
Inspection findings that do not meet acceptance criteria will be evaluated and tracked using the FENOC Corrective Action Program.
- Acceptance Criteria Indications of relevant conditions of degradation detected during the inspections will be evaluated and compared to pre-determined acceptance criteria. The acceptance criteria will be defined to ensure that the need for corrective actions is identified before loss of structure or component intended
Enclosure L-15-309 Page 10of14 functions. If the acceptance criteria are not met, then the indications or conditions will be evaluated under the FENOC Corrective Action Program.
Engineering evaluation by qualified personnel will be used for disposition of inspection findings that do not meet the acceptance criteria.
For core bore inspections, unacceptable inspection findings will include any indication of new cracking or a "discernable change" in previously identified cracks. Any indication of new cracking is defined as a visual inspection finding that visible cracks have developed in core bores that previously had no visible cracks. A discernable change in a previously identified crack is defined as a visual inspection finding that there has been a discernable change in general appearance or in crack width as identified by crack comparator measurement.
Conditions to be evaluated following each inspection cycle for determination of "acceptable results" include conformance with the plant design and licensing basis, as well as with previously determined crack propagation rates. Comparison with previously determined propagation rates will be to identify any potential changes in the driving force of the condition.
The acceptance criteria for any identified loss of material or change of material properties will be as described in Chapter 5 of ACI Report 349.3R.
The acceptance criteria for core bore inspections will be a maximum crack width of 0.013 inch, and maximum circumferential laminar crack planar limits (in percent, rounded to the nearest whole number) identified by region (elevation) of the structure, as follows:
1 801.0 - 812.75 0 2 774.5 - 801.0 70 3 643.0 - 774.5 20 4 565.0 - 643.0 0 The acceptance criteria for rebar corrosion found during visual inspections will be that there is no evidence of corrosion indicated by loose, flaky rust or reinforcement section loss. Given the inherent variability of reinforcement cross section, and the encompassing concrete, no measurement technique is employed.
JR mapping is a technique that is used to identify cracked and uncracked concrete. and. as such. there is no acceptance criteria for JR mapping.
Concrete determined to be cracked during JR mapping will be compared to
Enclosure L-15-309 Page 11of14 the building baseline inspection. If crack growth is determined to have occurred. it will be entered into the FENOC Corrective Action Program.
The acceptance criteria for Shield Building Wall, Shield Building Dome and Shield Building Emergency Air Lock Enclosure wall coatings will be based on the ability of the coatings to continue to be effective. The acceptance criteria will include the quantitative acceptance criteria for coatings in Chapter 5, Sections 5.1.4 and 5.2.4, of ACI Report 349.3R.
- Corrective Actions This element is common to Davis-Besse programs and activities that are credited with aging management during the period of extended operation and is discussed in Section B.1.3.
- Confirmation Process This element is common to Davis-Besse programs and activities that are credited with aging management during the period of extended operation and is discussed in Section B.1.3.
- Administrative Controls This element is common to Davis-Besse programs and activities that are credited with aging management during the period of extended operation and is discussed in Section B.1.3.
- Operating Experience Review of Davis-Besse operating experience identified degradation of the Shield Building concrete wall (above grade) due to internal laminar cracking.
The degradation had not been identified by the existing maintenance rule structural inspections which are based on visual inspection of the external surfaces of structures. The Shield Building Monitoring Program is designed to identify and evaluate potential aging effects within the Shield Building walls.
The program is also designed to identify and evaluate any loss of preventive action effectiveness of the exterior Shield Building concrete coatings, which were applied in 2012.
Industry operating experience regarding similar structures was evaluated for applicability at Davis-Besse. The only other similar instance of concrete delamination discovery was associated with creating a temporary access opening in the post-tensioned containment structure at Crystal River Unit 3.
The root cause of the Crystal River containment concrete delamination was
Enclosure L-15-309 Page 12of14 the design of the structure, in combination with the type of concrete used , and the acts of detensioning and opening the containment structure. As part of the root cause analysis of the Davis-Besse Shield Building laminar cracking, FENOC concluded that the subject Crystal River operating experience was not applicable to the Davis-Besse Shield Building.
The existing long-term corrective actions for Shield Building laminar cracking include inspections of the Shield Building concrete, rebar and coatings. The results of those activities has provided OE relevant to the Shield Building Monitoring Program.
Inspections of 12 core bores were completed in 2013 under the "Design Guidelines for Maintenance Rule Evaluation of Structures" Procedure EN-DP-01511. During that cycle of inspections, a newly identified crack was observed in one of the core bores. This finding, upon a review of records, was determined to be a pre-existing crack given that the extracted concrete core was cracked at the location identified. Given this finding, all available core bores were re-inspected. This re-inspection identified a total of 7 core bores with similar conditions of newly identified cracking that were determined to be pre-existing. This re-inspection also identified 8 conditions where the laminar cracking conditions were determined to have undergone a discernable change.
This total of 8 core bores did not represent 8 individual crack leading edges.
The findings of discernable change were a combination of:
- previously uncracked core bores now being cracked,
- multiple core bores intersecting advancement in the same crack plane, and
- previously cracked core bores now intersecting multiple crack planes (evidence of new cracking offshoot planes in previously cracked core bores).
The cracking propagation was determined to be a result of ice-wedging (freezing water at a pre-existing crack leading edge). This condition requires water, freezing temperatures and pre-existing cracks. Because the Shield Building has been coated it contains a finite amount of water. It is not practical to remove the water in an accelerated manner given the cumulative magnitude of leading crack edges, and transportability of water. It is also not practical to remove the existing cracks or prevent freezing temperatures. The rate of cracking propagation is estimated at 0.4 to 0.7 inches per freezing cycle based on laboratory simulation. By application of the evaluation criteria
Enclosure L-15-309 Page 13of14 hierarchy of ACI 349.3R, "Evaluation of Existing Nuclear Safety-Related Concrete Structures," Figure 5.1, the condition was acceptable through evaluation. The condition was not passive; however, it was bounded by design basis documentation. The Shield Building Monitoring Program was changed to ensure conformance with the design requirements and to maintain the USAR functions.
Inspections of 23 core bores were completed in 2015 under procedure EN-DP-01511. "Design Guidelines for Maintenance Rule Evaluation of Structures." During that cvcle of inspections. cracking propagation was observed in two of the locations where propagation was identified in 2013. as well as in one additional location.
The Shield Building laminar cracking condition has been evaluated with respect to the design basis functions of the Shield Building. The condition is documented in FENOC Calculation C-CSS-099.20-063 and Calculation C-CSS-099.20-069. as supported by Bechtel Report "Effect of Laminar Cracks on Splice Capacity of No. 11 Bars based on Testing Conducted at Purdue University and University of Kansas for Davis-Besse Shield Building,"
that the Shield Building "... meets all design requirements specified in USAR and will perform its USAR described design functions." This analysis bounds the identified changes in the laminar cracking condition from the conditions identified in 2011. 2013 and 2015.
Referencing the Evaluation criteria hierarchy of AC/ 349.3R, Figure 5.1, the 2013 condition and the 2015 condition waswere determined to be acceptable through evaluation. The condition§. waswere not passive; however, it v;asthev were bounded by design basis documentation. The laminar cracking condition will therefore be subjected to increased monitoring to ensure conformance with the design requirements and USAR functions.
The elements that comprise the Shield Building Monitoring Program inspections will be consistent with industry practice. Industry and plant-specific operating experience will be considered in the implementation of this program. As additional operating experience is obtained, lessons learned will be incorporated, as appropriate.
Enclosure L-15-309 Page 14of14 Enhancements None.
Conclusion Implementation of the Shield Building Monitoring Program will provide reasonable assurance that the existing environmental conditions will not cause aging effects that could result in a loss of component intended function. Aging effects that are discovered will be managed such that the Shield Building intended functions will be maintained consistent with the current licensing basis during the period of extended operation.