Summary of June 21, 2016, Public Meeting with Firstenergy Nuclear Operating Company to Discuss the 2015 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Station
ML16197A052
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/14/2016
From: Jamnes Cameron
Reactor Projects Region 3 Branch 4
To:
FirstEnergy Nuclear Operating Co
References
Download: ML16197A052 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 July 14, 2016 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Station, Unit 1

SUBJECT:

SUMMARY

OF JUNE 21, 2016, PUBLIC MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY TO DISCUSS THE 2015 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF DAVIS-BESSE NUCLEAR STATION On June 21, 2016, from 6:00 p.m. to 7:30 p.m. (EDT), a public outreach/open house was held by representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the open house was to provide the public with information on the 2015 End-of-Cycle plant performance assessment of the Davis-Besse Nuclear Station and with general information on the NRC. The outreach was held at the Carroll Township Service Complex in Oak Harbor, OH.

The NRC meeting notice for this open house can be found in the Agencywide Documents Access and Management System (ADAMS) as ML16152A837.

The NRC personnel provided discussions related to the NRCs assessment of the Davis-Besse Nuclear Station performance, which was documented in the March 2, 2016, End-of-Cycle Assessment letter, ML16060A258. As part of the open house, both NRC and FirstEnergy representatives were available to address questions and concerns. Slides used to describe the NRCs Reactor Oversight Process and Davis-Besse Nuclear Station 2015 performance can be found in ADAMS under ML16174A315. In addition to the slides, members of the NRC made available a brochure on the Reactor Oversight Process, NUREG/Br-0508, ML16119A045, and the August 2015 edition of the NRC Information Digest, NUREG-1350, Volume 27, ML15254A321. During the open house, members of the public discussed with NRC personnel

topics including the status of the fire protection program (NFPA 805 implementation time frame) and inspections of tubes in the steam generator (results of the last refueling outage and inspection process - that is, eddy current tube testing and the associated interpretation of the inspection results).

/RA Bruce Bartlett Acting for/

Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

List of Attendees cc: Distribution via LISTSERV

LIST OF ATTENDEES JUNE 21, 2016, NRC PUBLIC MEETING TO DISCUSS THE 2015 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF DAVIS-BESSE NUCLEAR STATION U.S. Nuclear Regulatory Commission, Region III, Division of Reactor Projects Division Name Title REGION III Division of Jamnes Cameron Chief Branch 4 Reactor Projects (DRP) and Division Reactor Safety (DRS)

Daniel Kimble Senior Resident Inspector Thomas Briley Resident Inspector James Neurauter Senior Reactor Inspector FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Station Mack Helle Shift Manager Joe Sturdavant Senior Compliance Specialist Hans Rosebrock Manager Steve Hall Communications Jennifer Young Communications Patrick McCloskey Manager Regulatory Affairs Members of the Public News Herald/N-M Jessica L. Denton Reporter N/A Eric Noreder Public N/A Vicky Clemons Public Ottawa County Mark Stahl Commissioner Ohio Department of Health Pam Hinte H.P.

(ODH)

Enclosure

topics including the status of the fire protection program (NFPA 805 implementation time frame) and inspections of tubes in the steam generator (results of the last refueling outage and inspection process - that is, eddy current tube testing and the associated interpretation of the inspection results).

/RA Bruce Bartlett Acting for/

Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

List of Attendees cc: Distribution via LISTSERV DISTRIBUTION:

Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML16197A052 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME LAlavarado:bw JCameron DATE 07/14/16 07/14/16 OFFICIAL RECORD COPY