Summary of Telephone Conference Call Held on December 12, 2011 Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Request for Additional Information
ML11363A171
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/23/2012
From: Cuadradodejesus S
License Renewal Projects Branch 1
To:
CuadradoDeJesus S
References
TAC ME4640
Download: ML11363A171 (10)


Text

~"R REGu~ UNITED STATES

~~c.." "'01' NUCLEAR REGULATORY COMMISSION

~ ~ WASHINGTON, D.C. 20555-0001

<t 0 Iii

~ ~

1 January 23, 2012

~..., of!?

'} ~

        • i<

LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 12, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on December 12,2011, to discuss and clarify the applicant's response to the staff's request for additional information (RAI) concerning the Davis-Besse Nuclear Power Station, license renewal application.

Enclosure 1 provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant. A brief description of the status of the items is also included.

I!il \

The applicant had an opportunity to comment on this summary.

1

/'"'

J(YI)/I

1 /'1

~el(cuadrado j~sus, Projects Branch 1 e Project Manager Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosures:

1. List of Participants
2. Summary of Telephone Conference Call cc w/encls: Listserv

SUMMARY

OF TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS DECEMBER 12, 2011 PARTICIPANTS AFFILIATIONS Samuel Cuadrado de Jesus U.S. Nuclear Regulatory Commission (NRC)

Christopher Hunt NRC Seung Min NRC Kenneth Karwoski NRC Andrew Johnson NRC Cliff Custer FirstEnergy Nuclear Operating Company (FENOC)

Allen McAllister FENOC Larry Hinkle FENOC Luke Twarek FENOC Enclosure 1

SUMMARY

OF TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION DECEMBER 12, 2011 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on December 12, 2011, to discuss and clarify the applicant's November 23,2011, response to request for additional information (RAls) 3.1.2.2.16-2 and the staffs potential follow-up RAI 3.1.2.2.16-3 concerning the Davis-Besse license renewal application (LRA).

Discussion:

The staff and the applicant discussed the applicant's response to NRC RAI 3.1.2.2.16-2 regarding the inspections to manage cracking due to primary water stress corrosion cracking of the steam generator tube-to-tubesheet welds, submitted by FENOC letter dated November 23, 2011. This discussion included the extent and method of the visual inspections.

In the discussion to clarify the extent of the visual inspections, the applicant indicated the gross visual inspection will be conducted on each of the welds on both hot legs and cold legs. The applicant also indicated that the extent of the visual inspections is 100 percent for both the hot leg tube-to-tubesheet welds and the cold leg tube-to-tubesheet welds.

In the discussion to clarify the method of the visual inspection, the applicant indicated that the visual inspection will consist of a remote-visual examination using a camera manipulator to obtain a straight on view of the weld from the primary side. The applicant also indicated that the visual inspections will be performed by personnel who are trained and knowledgeable in the steam generator tube-to-tubesheet welds and degradation of these welds. In addition, the applicant indicated that the eddy-current inspections are qualified to detect cracking in the tubing (e.g, when a crack propagates into a tube).

The staff stated that a follow-up RAI (RAI 3.1.2.2.16-3) will be issued to obtain information that clarifies the extent and method of the visual inspections.

There was no further discussion, and the call was concluded.

ACTION: The staff will issue RAI 3.1.2.2.16-3 to address the extent and method of the visual inspections.

Enclosure 2

'.. ML11363a171 OFFICE LADLR PM:RPB1 :DLR BC:RPB1 :DLR PM:RPB1 :DLR NAME YEmonds S Cuadrado de Jesus D Morey S Cuadrado de Jesus DATE 01/10/12 01/13/12 01/13/12 01/23/12

Memorandum to FirstEnergy Nuclear Operating Company from S. Cuadrado de Jesus dated January 23, 2012

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 12, 2011 BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)