Letter Sequence RAI |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML19276D398, ML20014E677, ML20065N277, ML20065N278, ML20065N280, ML20065N281, ML20065N285, ML20071F156, ML20076D696, ML20094G482, ML20099A180, ML20104C015, ML20104C016, ML20104C018, ML20104C019, ML20105A135, ML20105A136, ML20105A137, ML20105A138, ML20105A139, ML20105A173, ML20111A240, ML20115E377, ML20136A049, ML20136A050, ML20136A051, ML20150A300, ML20150A335, ML20150A421, ML20155K741, ML20155K742, ML20155K743, ML20155K744, ML20160A040, ML20161A088, ML20163A702, ML20163A703, ML20163A704, ML20181A211, ML20181A212, ML20192A328, ML20192A329, ML20212L768, ML20212L769, ML20212L878, ML20223A036, ML20224A287, ML20260H376, ML20261H420... further results
|
MONTHYEARML19276D3982019-10-0303 October 2019 Exemption Request to Load and Store Spent Fuel in HI-STORM FW Spent Fuel Casks Utilizing Amendment 1, Revision 1 to CoC No. 1032 Project stage: Other ML20115E3782019-10-0303 October 2019 Independent Spent Fuel Storage Installation Exemption Safety Evaluation Report Project stage: Approval ML20014E6772020-01-0909 January 2020 Fws List of Threatened and Endangered Species That May Occur with Respect to the McGuire Exemption Request Project stage: Other ML20015A3142020-01-14014 January 2020 Package: Exemption Request McGuire Nuclear Facility Project stage: Request ML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20055F3372020-02-20020 February 2020 Conversation Record - Clarification Call (02/20/2020) on RAI 1 for CoC 1040 Umax Amendment 4 Project stage: RAI ML20064F6162020-02-29029 February 2020 January 15, 2020, Summary of Meeting with Holtec International, Inc., to Discuss the Upcoming Submittal of the Application for Renewal of the Storage Certificate of Compliance No. 1014 for the HI-Storm 100 Cask System Project stage: Meeting ML20064E6222020-03-0303 March 2020 U.S. Nuclear Regulatory Commission Approval of NAC International Request for Withholding Information from Public Disclosure for Coc 1025 Renewal (CAC No. 001028) Project stage: Withholding Request Acceptance ML20063M0152020-03-0303 March 2020 HI-STORM 100 Renewal Presubmittal Meeting (Holtec Slides, 1-15-20) Project stage: Meeting ML20071F1562020-03-0505 March 2020 Interim Storage Partners, LLC - Affidavit Project stage: Other ML20065K2162020-03-0505 March 2020 Notice of Meeting with U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20071J0552020-03-0505 March 2020 Notice of Cancelled Meeting with the U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20071F1532020-03-0505 March 2020 Interim Storage Partners, LLC - Supplemental Information in Support of Nrc'S Environmental Review Project stage: Supplement ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information Project stage: RAI ML20066K5782020-03-0606 March 2020 Acceptance Review of Request for Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML20065N2772020-03-0909 March 2020 ISFSI Renewal Cover Letter Project stage: Other ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order Project stage: Other ML20065N2852020-03-0909 March 2020 ISFSI Renewed Technical Specifications Project stage: Other ML20076D6962020-03-11011 March 2020 Interim Storage Partners, LLC - Submittal of Clarifications to Support Nrc'S Continued Review of the Safety Case for the WCS CISF Project stage: Other ML20065N2782020-03-11011 March 2020 ISFSI FRN Notice of Issuance for License Renewal Project stage: Other ML20071D9942020-03-11011 March 2020 Submittal of HI-STAR 100 Updated FSAR, Revision 4 Project stage: Request ML20104C0152020-03-30030 March 2020 International - Amendment No. 4 to the HI-STORM Umax Canister Storage System Project stage: Other ML20104C0202020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20104C0162020-03-30030 March 2020 International - Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages Project stage: Other ML20104C0182020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 FSAR - Changed Pages Project stage: Other ML20104C0192020-03-30030 March 2020 International - Affidavit for Kimberly Manzione Project stage: Other ML20091L0642020-03-31031 March 2020 Enclosure 1 - Request for Additional Information - Non-Proprietary Project stage: RAI ML20104C0482020-03-31031 March 2020 International - HI-STORM Umax Amendment 3 Responses to Requests for Additional Information Project stage: Response to RAI ML20091L0632020-03-31031 March 2020 Transmittal Letter - CoC 1042 Amendment Number 2 Request for Additional Information Project stage: RAI ML20105A1352020-03-31031 March 2020 Enclosure 1 - Affidavits Project stage: Other ML20065N2802020-03-31031 March 2020 ISFSI License Renewal SER Project stage: Other ML20101P3992020-03-31031 March 2020 Interim Storage Partners, LLC - Submittal of Draft Responses for Several Rals and Associated Document Markups from First Request for Additional Information, Parts 1, 2 and Clarifications Project stage: Draft Request ML20105A1732020-04-0606 April 2020 Interim Storage Partners, LLC - Affidavits Project stage: Other ML20099A1802020-04-0606 April 2020 Application for Renewal of the Certificate of Compliance No. 1014 for the Hi-Storm 100 Storage Cask System Accepted for Review (Cac/Epid Nos. 001028/L-2020-RNW-0007) Project stage: Other ML20105A1392020-04-0707 April 2020 Enclosure 8 - Referenced Documents Project stage: Other ML20105A1362020-04-0707 April 2020 Enclosure 3 - RAIs and Responses Project stage: Other ML20105A1372020-04-0707 April 2020 Enclosure 5 - La Changed Pages Project stage: Other ML20105A1342020-04-0707 April 2020 Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Parts 2, 3, and 4 Project stage: Request ML20105A1722020-04-0707 April 2020 Interim Storage Partners, LLC - Submittal of Supplemental Information in Support of RAI, Part 3 Project stage: Supplement ML20105A1382020-04-0707 April 2020 Enclosure 7 - SAR Changed Pages Project stage: Other ML20100F2952020-04-0909 April 2020 Tn Americas LLC - Submittal of Renewal Application for the TN-68 Dry Storage Cask - CoC 1027 Project stage: Request ML20104A0402020-04-10010 April 2020 Request for Additional Information for HI-STAR 100 CoC Renewal Application Project stage: RAI ML20111A2402020-04-13013 April 2020 Attachment 2: Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages (non-proprietary) Project stage: Other ML20111A2382020-04-13013 April 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20111A2392020-04-13013 April 2020 Attachment 1: HI-STORM Umax Amendment 4 RAI Supplemental Response (non-proprietary) Project stage: Supplement ML20094G4822020-04-15015 April 2020 GEH-Morris QAP Rev 4 Approval Project stage: Other ML20092L1732020-04-17017 April 2020 Safety Evaluation Report for the Pacific Gas and Electric Company Humboldt Bay Independent Spent Fuel Storage Installation Quality Assurance Plan HBI-L6 Revision 0 Project stage: Approval ML20120A2282020-04-29029 April 2020 Tn Americas LLC, Response to the Request for Additional Information to Application for Certificate of Compliance No. 1042, Amendment No. 2, to NUHOMS Eos System, (Docket No. 72-1042, CAC No. 001028 EPID: L-2019-LLA-0078)- Request for Extens Project stage: Request ML20125A0412020-05-0505 May 2020 Acceptance Review Completed for CoC 1021 (TN-32) Renewal Project stage: Acceptance Review ML20149K4172020-05-13013 May 2020, 28 May 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, Section I.E. for Trojan ISFSI (COVID-19) Project stage: Request 2020-03-06
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24078A3712024-04-0505 April 2024 Transmittal Letter - Request for Additional Information for Review of the Certificate of Compliance for the Model No. Castor Geo69 Storage System - Cost Activity Code/Enterprise Project Identification Number 001028/ L-2021-NEW-0006 ML24078A3722024-04-0505 April 2024 Enclosure 1 (Non-Proprietary) - Request for Additional Information for Review of the Certificate of Compliance for the Model No. Castor Geo69 Storage System - Cost Activity Code/Enterprise Project Identification Number 001028/ L-2021-NEW-00 ML24093A0802024-04-0202 April 2024 Email Dated 4/2/24 from Dbussmann (Gns) to Ngarcia Santos (NRC) Regarding Verification of Redacted Proprietary Information from the Non-Proprietary Version of the Requests for Additonal Information for the Model No. Castor geo69 Storage Sys ML24093A0682024-04-0202 April 2024 Email Dated 4/2/24 from Ngarcia Santos (NRC) to Dbussmann (Gns), Subject: Summary Discussion - Status of the Castor geo69 Storage Application and Schedule Impacts ML24075A2812024-03-11011 March 2024 Email Dated 3/15/24 from D. Bussman (Gns) to N. Garcia Santos (Nrc), Staggered Operations RAIs for the Castor geo69 Storage Application (Docket No. 72-1052) ML24016A0082024-01-16016 January 2024 Attachment (Redacted) - Email Dated 1/15/24 from D. Bussman (Gns) to N. Garcia Santos (Nrc), Staggered RAIs for the Castor geo69 Storage Application - Confinement Evaluation (Docket No. 72-1052) (Public) ML24016A0062024-01-15015 January 2024 Email Dated 1/15/24 from D. Bussman (Gns) to N. Garcia Santos (Nrc), Staggered Confinement RAIs for the Castor geo69 Storage Application (Docket No. 72-1052) ML24012A1942024-01-12012 January 2024 Email Dated 1/12/24 from N. Garcia Santos (NRC) to D. Bussmann (Gns), Staggered Confinement RAIs for the Castor geo69 Storage Application (Docket No. 72-1052) ML24002B1432024-01-0202 January 2024 Attachment (Redacted) - Email Dated 1/2/24 Dbussmann (Gns) to Ngarcia (Nrc), Staggered RAIs Castor geo69 Storage, Applicants Proprietary Review of Staggered RAIs Castor geo69 Storage Application-Shielding Evaluation (Public) ML24002B0982024-01-0202 January 2024 Email Dated 1/2/24 Dbussmann (Gns) to Ngarcia (Nrc), Staggered RAIs Castor geo69 Storage, Applicants Proprietary Review of Staggered RAIs Castor geo69 Storage Application-Shielding Evaluation ML23356A0042023-12-22022 December 2023 Email Dated 12-22-23 to D. Bussmann (Gns) from N. Garcia Santos (Nrc), Staggered RAIs Castor geo69 Storage Application - Shielding Evaluation ML24002B1422023-12-0101 December 2023 Attachment 1 (Redacted) - Email Dated 12/1/23 Dbussmann (Gns) to Ngarcia (Nrc), Applicants Proprietary Review of Staggered RAIs Castor geo69 Storage Application-Material Evaluation (Public) ML24002B1412023-12-0101 December 2023 Attachment 3 (Redacted) - Email Dated 12-1-23 Dbussmann (Gns) to Ngarcia (Nrc), Applicants Proprietary Review of Staggered RAIs Castor geo69 Storage Application - Thermal Evaluations (Public) ML24002B1402023-12-0101 December 2023 Attachment 2 (Redacted) - Email Dated 12/1/23 Dbussmann (Gns) to Ngarcia (Nrc), Applicants Proprietary Review of Staggered RAIs Castor geo69 Storage Application - Structural Evaluation ML21266A2422021-10-18018 October 2021 2. Enclosure 1: Request for Supplemental Information with Observations, Model No. Castor(R) geo69 Storage Cask Design (Non-Proprietary) 2024-04-05
[Table view] |
Text
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
Confinement Review RAIs
9-1 Provide a discussion in chapter 7 of the SAR of how radionu clide releases from the CASTOR geo69 DSS will impact the doses calculated at the owner contro lled area boundary, and how any release might affect the ability of the C ASTOR geo69 DSS to meet the dose limits prescribed in 10 CFR Part 72.104 and 106.
In sections 1.2.1.7 and 2.0.2.4 of the CASTOR geo69 DSS SAR, the geo69 confinement boundaries (i.e., the cask and canister, which are referred to as a double containment system) the application indicates that the confinement boundaries remain leak tight for the duration of storage of spent fuel c ontents. The NRC staff interprets this to mean that there is no credible leakage from either the cask or the canister; however, chapter 7 of the SAR does not specifically d iscuss how leakage from the CASTOR geo69 DSS confinement boundary might impact the doses calculat ed for the owner controlled area boundary, nor does it discuss how the design of the confinement boundary contributes to meeting the requirements fo und in 10 CFR 72.104 or 106.
This information is needed to determine compliance with 10 CFR 72.236(d).
9-2 Clarify the maximum absolute pressure values for off-normal and accident conditions and provide the correct references for the filling gas temper atures cited in SAR sections 7.2.2, 7.3.2, and 7.4.3.
The pressures and fill gas temperatures cited for the off-norma l and accident-fire conditions appear to be the same [withheld per 10 CFR 2.390], in SAR sections 7.3.2 and 7.4.3, respectively. It is not clear if this is correct. Fu rther, the citations for the filling gas temperatures stated in SAR sections 7.2.2, 7.3.2. and 7.4. 3 include the following thermal review section citations: sections 4.4, 4.5, and 4.6, r espectively. It is not clear where the temperature values cited in the sections of chapter 7 above, appear in the sections of chapter 4 cited from the SAR.
This information is needed to determine compliance with 10 CFR 72.236(l).
9-3 Revise the appropriate sections of the CASTOR geo69 DSS SAR to properly address the terms leak-tight and leak tight and the use of the phra ses leak-tightness and leak tightness considering the definition for leaktight pro vided in ANSI N14.5-2014, which is included in the list of references for chapters 7 - 10 of the SAR. The response provided to RAI 9-1, above, should be considered in the develop ment of the response to this RAI, as they are related.
Chapter 7 of the SAR references ANSI N14.5 - 2014, American National Standard for Radioactive Materials - Leakage Tests on Packages for Shipment, as the standard for leakage testing for the CASTOR geo69 DSS inner and outer confinement boundaries (i.e., the cask and the canister). The ANSI N14.5 - 2014 st andard defines the term leaktight as:
The degree of package containment that, in a practical sense, p recludes any significant release of radioactive materials. This degree of co ntainment is achieved by demonstration of a leakage rate less than or equal to 1 x 10-7 ref cm3/s, of air at an upstream pressure of 1 atmosphere (atm) absolu te (abs),
and a downstream pressure of 0.01 atm abs or less.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION
The ANSI N14.5 - 2014 standard provides the only definition of the term leaktight, as it relates to radioactive material package leakage testing, that i s recognized by the NRC.
Therefore, any use of the term (or similar terms such as leak-tight, leak tight, or leak tightness) must be in reference to the definition provided in the ANSI N14.5 - 2014 standard.
Sections 1.2.1.7 and 2.0.2.4 of the CASTOR geo69 DSS SAR describe that both the geo69 confinement boundaries (i.e., the cask and canister, which are referred to as a double containment system in the SAR) remain leak tight for the duration of storage of spent fuel contents. The staff understands this to mean that there is no credible leakage from either the cask or the canister; however, the term s leak-tight and leak tight should only refer, by definition, to the specific DSS co mponents that have been demonstrated to be leaktight by leak testing performed in acc ordance with ANSI N14.5 and meeting the leaktight criteria found in ANSI N14.5 - 2014.
This information is needed to determine compliance with 10 CFR 72.236(e), (j) and (l).
9-4 Provide additional justification for the request for the ap proval of a significant departure from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) code Section III, Division 3, WC-6120 and subsequent lea k testing according to WC-6224, as indicated in table 2.0-5 of the SAR.
Table 2.0-5 List of BPVC Alternatives for DSS (on page 2.0-8 of the SAR), provides a justification for an alternative to ASME B&PV code Section III, Division 3, WC-6120, for pressure testing of the storage cask and canister of the CASTOR geo69 DSS. The justification provided includes the following statement:
[withheld per 10 CFR 2.390]
This exception, if granted by the NRC as requested, would provi de relief from the ASME code requirement for any pressure testing and subsequent leak t esting of each of the CASTOR geo69 DSS storage containments in the course of serial product ion of both the cask and canister, based solely on the structural analy sis of the CASTOR geo69 DSS presented in chapter 3 of the SAR. The alternative proposed represents a significant departure from the ASME code requirements, one that NRC staff has not previously granted to any applicant for a storage design; there fore, the alternative requested would need additional justification in order for the staff to further consider the request. In addition, refer to section 7.3 and table 1 of ANSI N14.5 - 2014 that describes fabrication leakage rate testing.
This information is needed to determine compliance with 10 CFR 72.236(l).
OFFICIAL USE ONLY - PROPRIETARY INFORMATION