ML20235E952

From kanterella
Jump to navigation Jump to search
AO 2-72-3:on 720426,both Diesel Generators Started & Loaded According to Station Procedures.On 720427,diesel Generator Stable & Tripped Manually from Control Room.Caused by Damaged Rectifier in Control Sys
ML20235E952
Person / Time
Site: Quad Cities, 05000000
Issue date: 04/27/1972
From: Stephenson B
COMMONWEALTH EDISON CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20235B311 List: ... further results
References
FOIA-87-111 2-72-3, NUDOCS 8709280343
Download: ML20235E952 (1)


Text

, _ _ _ - - _

e- _

. , ./

+. ^,

^ ' ~.

yne_ Dy,

- k ,.; y

~

)

- 1

" 4 I RB

^

$ e

~~

l

- s ,

TWX NO 4 0 5 g .) $$ gg USAEC HQS GTWN'

%f gan WU WSH TLXB029 PA179 4

, Q NNE168 (SF !!8NN526168)PD WU TSDEPT MOLI 025SP EST04/27/72 .

ZCZC 002 DG PD TDMS CORDOVA ,ILL 27 143P CSTR DIR. DIVN OF REACTOR L LICENSING ATTN DR. P MORRIS-U S ATOMIC ENERGY COMM WASHDC '

BT '

REF- QUAD CITISS NUCLEAR POWER STATION DPR-29 AND DPR-30 APPENDIX A SECTION 6.6.A.! - UNITS ONE AND TWO - THE WATER LEVEL IN THE-UNIT TWO REACTOR VESSEL WAS LOWERED FOR FINAL VISUAL INSPECTION PRIOR TO HEAD INSTALLATION. TO PREVENT AUTO INITI ATION OF THE .

EMERGENCY DIESSL GENERATORS, JUMPERS WERE. AUTHORIZED. IN ERROR THE JUMPERS WERE PLACED ON UNIT ONE PANEL INSTEAD OF UNIT TWO -

PANEL AT 700PM ON 4-26-72. AS A RESULT BOTH DIESEL GENERATORS 2/ ,! !/2 STARTED AT 11:56PM ON 4-26-72 AND WERE LOADED ACCORDING ,

TO STATION PROCEDURES. AT 12:32AM ON 4-27-72 DIESEL GENERATOR (STABLE AND WAS TRIPPED MANUALLY FROM THE CONTROL ROOM.

INVESTIGATION REVEALED A DAMAGED RECTIFIER IN THE CONTROL SYSTEM. THE ERROR IN JUMPER PLACEMENT WAS CORRECTED AT 5AMK ON 4-27-72. THIS ABNORMAL OCCURANCE IS REPORTED AS INCIEENT 2-72-3 COMMONWEALTH EDISON CO QUAD CITY NUCLEAR POWER STATION 1-B B STEPHENSON - .