Rev 2 to COLR for Quad Cities Unit 2 Cycle 15
ML20247N628
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 05/19/1998
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20247N572 List:
References
NUDOCS 9805270195
Download: ML20247N628 (27)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - .

l ATTACHMENT 1 l

Core Operating Limits Report Revision 2 Quad Cities Unit 2 Cycle 15 SVP-98-195 I i

l l

-- ,4 9905270195 990519 1 PDR ADOCK 05000265 P PDR ,

t Core Operating Limit Report May 1998 ISSUANCE OF CHANGES

SUMMARY

Affected - Affected Sechon Pages- Summary of Changes Date All All Originalissue (Cycle 11). 10/89 11/91 All All Original issue (Cycle.12),

Reissue. 2/92 All All Originalissue (Cycle 13). 2/93 2 2 Added Section 2.3 on SLO. 3/93 References, iii,4 & 5 Revised References and Section 4.2 and added 4/94 4.2 & 5- Section 5.0 on Analytical Methods.

All ' All Original Issue (Cycle 14). 6/95 i

All All Latest Date Revised added to each COLR 5/96 page, Added SpecialInstructions and boxed in TSUP References for TSUP Implementation.

Added Control Rod Withdrawal Block Equation for Single Loop Operation.

All All Originalissue (Cycle 15). 5/97 l

All All 1. " Cycle 15' Changed to " Cycle 15 Revision 1" 10/97

2. Added references 10,11 and 12 to support Cycle 15 Revision 1 Core Loading to Reference Section on Page iv
3. .Page Dates Changed All All 1. Changed MCPR Operating Limits for 5/98 ,

ATRIUM-98 and associated wording

2. Changed Revisions of Reload Analysis and Plant Transient Analpis (References 7 and 8)
3. Added Reference 13 to support Cycle 15 Rev 1 CPR and Transient Re-analysis

! 4. Page Dates Changed l

~

Quad Cities Unit 2 Cycle 15 Revision 1 TABLE OF CONTENTS gn a '

+

'i, y[ ,

+w x

Cora Operating Limits RIptrt May 1998 S P EC IA L I N STR U CTI O N S .. .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii REFERENCES..........................................................................................................iv 4 LI ST O F TA B L E S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .v LI ST O F FI G U R E S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi 1.0 C NTROL ROD WITHDRAWAL BLOCK INSTRUMENTATION.... ..... ........1 i l

1.1. TECHNICAL SPECIFICATION

REFERENCE:

... ... ....... . ....................1 l

1.2. DESCRIPTION

(Two Loop Operation) .......... ............... .......................1

1.3 DESCRIPTION

(Single Loop Operation)...... .. ................... .... ........... .1 i I I

l 2.0 AVERAGE PMNAR LINEAR HEAT GENERATION RATE (APLHGR) ......... 2 d

. 2.1 TECHNICAL SPECIFICATION

REFERENCE:

...... . ........ . ....... . ......... 2 2.2 D E SC R I PTIO N : . . . . . . . . . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.3 SINGLE LOOP OPERATION MULTIPLIER:.. ...... . ... .. .. ...... ...... . ... 2

, r LINEAR HEAT GENERATION RATE (LHGR) .... .. ................................3 3.0 3.1 TECHNICAL SPECIFICATION

REFERENCE:

............ ... ............... .... 3 3.2 D E S C R I PTIO N : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 4.0 ' MINIMUM CRITICAL POWER RATIO (MCPR) . .. ...... .. ..... ... . . . ... .......4 4.1 TECHNICAL SPECIFICATI N

REFERENCE:

.. .. ... ... ... ........... .... . 4 4.2 D E SC R I PTI O N : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 5.0 ANALYTICAL METHODS . . . . . . . . . . .....................................5 6.0 ATTAC H M E NTS . . . . . . . . . . . . . . . . . . . . . . . . .. .. . . . . . . . . . . . . . . . . . . .. . . . .. . . .....6 ATTACHMENT 1 (RELOAD ANALYSIS REPORT).............. ..... ......... ... ......A1 ATTACHMENT 2 (PLANT TRANSIENT ANALYSIS REPORT)........... ...........A2 '

I (3

V ii Quad Citias Unit 2 Cycle 15 Revision 1

Core Operating Limits Report May 1998 SPECIAL INSTRUCTIONS

1. This Core Operating Limits Report (COLR) contains the applicable reactor core limits and operational information mandated by Technical Specifications Section 6.9.A.6.

When the COLR is referenced by applicable Technical Specifications or procedures for Technical Specification compliance, a controlled copy of this report shall be used as the official source of the applicable limit or requirement.

3 9

1 1

O iii Quad Cities Unit 2 Cycle 15 Revision 1

Core Opercting Limits R; port l May 1998 i

REFERENCES

1. Commonwealth Edison Company and lowa-Illinois Gas and Electric Company Docket No. 50-265, Quad Cities Station, Unit 2 Facility Operating License, License No. DPR-30.

l 2. Letter from D. M. Crutchfield to All Power Reactor Licensees and Applicants, Generic Letter 88-16; Concerning the Removal of Cycle-Specific Parameter Limits from Technical Specifications.

3. Quad Cities Nuclear Power Station, Units 1 and 2, SAFER /GESTR - LOCA Loss-of-Coolant Accident Analysis. NEDC-31345P, Revision 2, July 1989 (as amended).
4. Lattice Dependent MAPLHGR Report for Quad Cities Nuclear Power Station, Unit 2, Reload 13 Cycle 14,24A5161-AA Revision 0, December,1994.
5. SPC Document, EMF-96-185(P) Rev.1 " Quad Cities LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-98 Fuel", March,1997.
6. SPC Document EMF-96-037(P) Rev.1 " Quad Cities Extended Operating Domain (EOD) and Equipment Out of Service (EOOS) Safety Analysis for ATRIUM-9B Fuel",

September,1996.

7. SPC Document, EMF-96-177 Rev. 3, NDIT970069, " Quad Cities Unit 2 Cycle 15 Reload i Analysis", April,1998 (COLR Attachment).
8. SPC Document EMF-96-180 Rev. 2 NDIT970068 " Quad Cities Unit 2 Cycle 15 Plant Transient Analysis", April,1998 (COLR Attachment)
9. SPC Letter JHR:97:203, " Analysis to Support Operation with Reactor Pressure Less than the Design Pressure at Quad Cities", May 27,1997.
10. SPC Letter DEG 97:156, " Quad Cities Unit 2 Cycle 15 Assessment of Licensing Analyses After Replacement of Failed Fuel Assembly (Revision)", September 30,1997.
11. NDIT 970159 Revision 0, " Quad Cities 2 Cycle 15A Design Basis Loading Plan (DBLP)",

September 29,1997.

12. BNDQ:97-062, "QC2 C15 Licensing Analysis Application to C15A (Assuming YJ8327 is the Leaker and LYU336 is Reinserted)", September 30,1997.
13. BNDQ:98-010, "QC2 C15A Neutronics Licensing Reruns with Revised 1998 ATRIUM-9B Additive Constants and MICROBURN uaug97", April 27,1998.

)

av '

Quad Cities Unit 2 Cycle 15 Revision 1

Cers Operating Limits R2 port

. May 1998 LIST.OF TABLES Table' Title Page 2-1 Maximum Average Planar Linear Heat Generatum 2-1 Rate (MAPLHGR) vs. Average Planar Exposure for GE9B-P8DWB310-9GZ-80M-145-T.

2-2 Maximum Average Planar Linear Heat Generation 2-2 Rate (MAPLHGR) vs. Average Planar Exposure for GE9B-P8DWB299-11GZ-80M-145-T.

2-3 Maximum Average Planar Linear Heat Generation 2-3 Rate (MAPLHGR) vs. Average Planar Exposure for GE9B-P8DWB286-7G3.0-80M-145-T.

2-4 Maximum Average Planar Linear Heat Generation 2-4 l Rate (MAPLHGR) vs. Average Planar Exposure for GE9B-P8DWB286-9GZ-80M-145-T.

.2-5 Maximum Average Planar Linear Heat Generation 2-5 Rate (MAPLHGR) vs. Average Planar Exposure for GE9B-P8DWB310-7G3.0-80M-145-T.

2-6 Maximum Average Planar Linear Heat Generation 2-6 Rate (MAPLHGR) vs. Average Planar Exposure for GE9B P8DWB308-10GZ1-80M-145-T.

2-7 Maximum Average Planar Linear Heat Generation 2-7 Rate (MAPLHGR) vs. Average Planar Exposure for

. GE10-P8HXB316-8GZ-100M-145-T.

2-8 Maximum Average Planar Linear Heat Generation 2-8 Rate (MAPLHGR) vs. Average Planar Exposure for GE10-P8HXB312-7GZ-100M-145-T.

2-9 Maximum Average Planar Linear Heat Generation 2-9 Rate (MAPLHGR) vs. Average Planar Exposure for SPCA9-3728-11GZH-ADV.

2-10_ Maximum Average Planar Linear Heat Generation 2-9

, ' Rate (MAPLHGR) vs. Average Planar Exposure for SPCA9-3588-11GZL-ADV.

4-1 Automatic Flow Control MCPRr Results, Base Case 4-3 and EOOS/EOD.

v Quad Cities Unit 2 Cycle 15 Revision 1 4

l- _ _ _ - - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ .

I

Cora Operating Limits R: port May 1998 LIST OF FIGURES Figure Title Page 3-1 Protection Against Power Transient LHGR Limit 3-1 for ATRIUM-9B Offset 4-1 MCPRr, Manual Flow Control 4-2 1

1 I

i i

l l l L

I i

vi- '

Quad Cities Unit 2 Cycle 15 Revision 1 -

Core Operating Limits Rrport

. May 1998 1.0 CONTROL ROD WITHDRAWAL BLOCK INSTRUMENTATION 1.1. TECHNICAL SPECIFICATION

REFERENCE:

Technical Specification: Table 3.2.E-1 [COLR 1.2], 3.6.A.1.c [COLR 1.3)

1.2. DESCRIPTION

The Rod Withdrawal Block Monitor Upscale Instrumentation Trip Setpoint for Two Recirculation Loop Operation is determined from the following relationship:

$_ (0.65)Wd + 43% "

1.3. DESCRIP. TION:

The Rod Withdrawal Block Monitor Upscale Instrumentation Trip Setpoint for Single Recirculation Loop Operation (SLO) is determined from the following relationship, s < (0.65)Wd + 39% "

" Clamped, with an allowable value not to exceed the allowable value for recirculation loop drive flow (Wd) of 100%.

Wd is the percent of drive flow required to produce a rated core flow of 98 million Ib/hr. Trip level setting is in percent of rated power (2511 MWth).

I i

l Page1 Quad Cities Unit 2 Cycle 15 Revision 1

Cors Oper ting Limits Report May 1998 2.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (.APLHGR) i 2.1 TECHNICAL SPECIFICATION

REFERENCE:

l Technical Specification 3.11.Al

2.2 DESCRIPTION

MAPLHGR versus Average Planar Exposure for GE9B-P8DWB310-9GZ-80M-145-T is determined from Table 2-1.

I MAPLHGR versus Average Planar Exposure for GE9B-P8DWB299-11GZ-80M-145-T is determined from Table 2-2.

MAPLHGR versus Average Planar Exposure for GE9B-P8DWB286-7G3.0-80M-145-T is determined from Table 2-3.

MAPLHGR versus Average Planar Exposure for GE9B-P8DWB286-9GZ-80M-145-T is determined ffom Table 2-4.

MAPLHGR versus Average Planar Enosure for GE98-P8DWB310-7G3.0-80M- l

,Q 145-T is determined from Table 2-5.

i V

MAPLHGR versus Average Planar Exposure for GE9B-P8DWB308-10GZ1-l 80M-145-T is determined from Table 2-6.

MAPLHGR versus Average Planar Exposure for GE10-P8HXB316-8GZ-100M-145-T is determined from Table 2-7.

MAPLHGR versus Average Planar Exposure for GE10-P8HXB312-7GZ-100M-

'145-T is determined from Table 2-8.

MAPLHGR versus Average Planar Exposure for SPCA9-3728-11GZH-ADV is determined from Table 2-9.

MAPLHGR versus Average Planar Exposure for SPCA9-3588-11GZL-ADV is determined from Table 2-10.

2.3 SINGLE LOOP OPERATION MULTIPLIER:

The tabulated values are multiplied by 0.85 for GE fuel and 0.90 for SPC fuel whenever Quad Cities enters Single Loop Operation.

Page 2  !

v Quad Cities Unit 2 Cycle 15 Revision 1

Core Operating Limits R: port May 1998 l r TABLE 2-1 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE : GE98-P8DWB310-9GZ-80M-145-T l LATTICE 731 : P8DWLO71-NOG-80M-T LATTICE 847 : P8DWL334-7G3.0-80M-T )

I LATTICE 848 : P8DWL350-7G3.0-80M-T LATTICE 849 : P8DWL350-2G4.0/7G3.0-80M-T LATTICE 846 : P8DWLO71-9GE1-80M-T l

AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 731 847 848 849 846 (GWd/ST) 0.00 11.64 12.25 11.78 11.31 11.64 0.20 11.57 1?.32 11.85 11.39 11.57 1.00 11.38 12.46 11.99 11.55 11.38 2.00 11.36 12.62 12.19 11.78 11.36 3.00 11.41 12.79 12.36 12.02 11.41 1 4.00 11.49 12.96 12.52 12.22 11.49 O- 5.00 11.56 13.14 12.69 12.44 11.56 6.00 11.63 13.23 12.81 12.60 11.63 l 7.00 11.69 13.30 12.93 12.77 11.69  ;

8.00 11.74 13.38 13.04 12.93 11.74 9.00 11.78 13.43 13,14 13.08' 11.78 10.00 11.81 13.46 13.21 13.20 11.81 12.50 11.54 13.41 13.21 13.21 11.54 ,

15.00 11.16 13.02 12.94 12.93 11.16  !

20.00 10.37 12.28 12.30 12.29 10.37 2'5.00 9.58 11.57 11.61 '11.60 9.58 35.00 8.01 10.27 10.29 10.27 8.01 43.70 4.71 - - -

4.71 45.00 -

9.02 8.98 8.92 -

51.10 - - -

5.90 -

51.20 - 5.96 5.90 - -

I Page 2-1 Quad Cities Unit 2 Cycle 15 Revision 1

[ .

Cera Operating Limits Raport May 1998 I-

!O l TABLE 2-2 MAPLHGR vs. AVERAGE PL.ANAR EXPOSURE FOR BUNDLE TYPE : GE98-P8DWB299-11GZ-80M-145-T LATTICE 731 : P8DWLO71-NOG-80M-T

~

LA1TICE 850 : P8DWL322-9G3.0-80M-T

' LATTICE 851 : P8DWL337-9G3.0-80M-T LATTICE 852 : P8DWL337-2G4.0/9G3.0-80M-T LATTICE 853 : P8DWLO71-11GE-80M-T l

AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 731 850 851 852 853 (GWd/ST) 0.00 11.64 11.49 11.31 10.87 11.64 0.20 11.57 11.52 11.38 10.96 11.57 1.00 11.38 11.62 11.56 11.14 11.38 2.00 11.36 11.87 11.84 11.44 11.36 3.00 11.41 12.19 12.05 11.70 11.41 O- 4.00 11.49 12.57 12.21 11.88 11.49 5.00 11.56 12.94 12.37 12.07 11.56 6.00 11.63 13.04 12.54 12.27 11.63 7.00 11.69 13.14 12.73 12.50 11.69

. 8.00 11.74 13.21 12.90 12.72 11.74 9.00 11.78 13.26 13.03 12.92 11.78 10.00 11.81 13.28 13.11 13.07 11.81 12.50 11.54 13.21 13.07 13.06 11.54 15.00 11.16 12.82 12.81- 12.81 11.16 20.00 10.37 12.07' 12.30 12.30 10.37 25.00 9.58 11.36 11.66 11.64 9.58 35.00 8.01 10.07 10.29 10.27 8.01 43.70 4.71 - - -

4.71 45.00 - 8.61 8.85 8.82 -

50.60 - 5.89 - - -

51.00 - - -

5.84 -

51.20 - - 5.81 - -

Page 2-2 Quad Cities Unit 2 Cycle 15 Revision 1

_____-1-___ - - _ - _ _ -___--_--__:------_z--

Cera Oper: ting Limits Rcport May 1998 TABLE 2-3 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE : GE98-P80WB286-7G3.0-80M-145-T LATTICE 731 : P8DWLO71-NOG-80M-T LATTICE 1059 : P8DWL306-7G3.0-80M-T LATTICE 1060 : P8DWL324-7G3.0-80M-T LATTICE 1061 : P8DWLO71-7GE1-80M-T 4

AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 731 1059 1060 1061 (GWd/ST) 0.00 11.64 12.38 11.95 11.64 0.20 11.57 12.45 12.03 11.57 1.00 11.38 12.54 12.11 11.38 2.00 11.36 12.65 12.30 11.36 3.00 11.41 12.75 12.57 11.41

'f% 4.00 5.00 11.49 11.56 12.85 12.94 12.88 12.97 11.49 11.56 6.00 11.63 12.95 13.01 11.63 7.00 11.69 12.97 13.09 11.69 8.00 11.74 13.01 13.17 11.74 9.00 11.78 13.05 13.21 11.78 10.00 11.81 13.09 13.23 11.81 12.50 11.54 13.04 13.16 11.54 15.00 11.16 12.71 12.79 11.16 20.00 10.37 12.06 12.06 10.37 25.00 9.58 11.43 11.37 9.58 35.00 8.01 10.04 10.12 8.01 43.66 4.71 - -

4.71 45.00 -

8.60 8.68 -

50.66 -

5.84 - -

50.75 - - 0.91 -

Page 2-3 Quad Cities Unit 2 Cycle 15 Revision 1

Cera Opercting Limits Riport May 1998 O TABLE 2 4 l

MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE GE9B-P8DWB286-9GZ-80M-145-T LATTICE 731 : P80WLO71-NOG-80M-T l '

LATTICE 1059 : P8DWL306-7G3.0-80M-T LATTICE 1060 : P8DWL324-7G3.0-80M-T LATTICE 1000 : P8DWL324-2G4.0/7G3.0-80M-T LATTICE 1001 : P8DWLO71-9GE-80M-T AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 731 1059 1060 1000 1001 (GWd/ST) 0.00 11.64 12.38 11.95 11.42 11.64 0.20- 11.57 12.45 12.03 11.51 11.57 1.00 11.38 12.54 12.11 11.59 11.38 2.00 11.36 12.65 12.30 11.82 11.36 3.00 11.41 12.75 12.57 12.13 11.41 O- 4.00 11.49 12.85 12.88 12.51 11.49 5.00 11.56 12.94 12.97 12.69 11.56 6.00 11.63 12.95 13.01 12.80 11.63 7.00 11.69 12.97 13.09 12.92 11.69 8.00 11.74 13.01 13.17 13.04 11.74 9.00 11.78 13.05 13.21 13.14 11.78 10.00 11.81 13.09 13.23 13.20 11.81

.12.50 11.54 13.04 13.16 13.14 11.54 15.00 11.16 12.71 12.79 12.77 11.16 20.'00 10.37- 12.06 12.06 12.04 10.37 25.00 9.58 11.43 11.37 11.36 9.58 35.00 8.01 '10.04 10.12 10.11 8.01 43.66 4.71 - - -

4.71 45.00 -

8.60 8.68 8.65 -

50.66 - 5.84 -

5.92 -

50.75 - - 5.91 - -

Pa9e 2-4 Quad Cities Unit 2 Cycle 15 Revision 1 1

f Core Operating Limits R:: port May 1998

(

TABLE 2-5 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE : GE98-P8DWB310-7G3.0-80M-145-T LATTICE 731 : P8DWLO71 NOG-80M-T LATTICE 1644 : P8DWL334-7.G3.0-80M-T LATTICE 1645 : P8DWL350-7G3.0-80M-T LATTICE 1004 : P8DWLO71-7GE-80M-T l

l AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 731 1644 1645 1004 (GWd/ST) 0.00 11.64 12.25 11.78 11.64 0.20 11.57 12.32 11.85 11.57 i 1.00 11.38 12.46 11.99 11.38 2.00 11.36 12.62 12.19 11.36 3.00 11.41 12.79 12.36 11.41 4.00 11.49 12.96 12.52 11.49 O 5.00 11.56 13.14 12.69 11.56 U 6.00 11.63 13.23 12.81 11.63 7.00 11.69 13.30 12.93 11.69 8.00 11.74 13.38 13.04 11.74 9.00 11.78 13.43 13.14 11.78 10.00 11.81 13.46 13.21 11.81 12.50 11.54 13.41 13.22 11.54 15.00 11.16 13.03 12.95 11.16 20.00 10.37 12.29 12.31 10.37 25.00 9.58 11.58 11.62 9.58 35.00 8.01 10.28 10.31 8.01 43.66 4.71 - -

4.71 45.00 -

9.04 9.01 -

51.41 - -

5.88 -

51.43 -

5.94 - -

r~

' Page 2-5 Quad Cities Unit 2 Cycle 15 Revision 1

Coro Operating Limits Rrport May 1998

~

TABLE 2-6 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE : GE9B-P8DWB308-10GZ1-80M-145-T LATTICE 731 : P8DWLO71-NOG-80M-T LATTICE 1642 : P8DWL332-8G4.0/2G3.0-80M-T LATTICE 1669 : P8DWL348-8G4.0/2G3.0-80M-T LATTICE 1188 : P8DWLO71-10GE-80M-T AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 731 1642 1669 1188 (GWd/ST) 0.00 11.64 11.63 11.24 11.64 0.20 11.57 11.69 11.31 11.57 1.00 11.38 11.83 11.44 11.38 2.00 11.36 12.04 11.62 11.36 3.00 11.41 12.25 11.82 11.41 O 4.00 11.49 12.48 12.02 11.49 5.00 11.56 12.58 12.24 11.56 6.00 11.63 12.69 12.44 11.63 7.00 11.69 12.86 12.62 11.69 8.00 11.74 13.04 12.75 11.74 9.00 11.78 13.19 12.90 11.78 10.00 11.81 13.31 13.05 11.81 12.50 11.54 13.32 13.14 11.54 15.00 11.16 12.96 12.92 11.16 20.00 10.37 12.22 12.25 10.37

- 25.00 9.58 11.53 11.57 9.58 35.00 8.01 10.24 10.26 8.01 43.66 4.71 - - 4.71 45.00 -

8.93 8.93 -

51.09 - 5.96 - -

51.15 - -

5.90 -

Page 2-6 i

Quad Cities Unit 2 Cycle 15 Revision 1 i

I Cora Operating Limits R:; port f May 1998 TABLE 2-7 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE : GE10-P8HXB316-8GZ-100M-145-T LATTICE 7400 : P8HXLO71-NOG-100M LATTICE 7467 : P8HXL341-6G4.0/2G3.0-100M LATTICE 7469 : P8HXL357-6G4.0/2O3.0-100M LATTICE 7468 : P8HXL341-8G3.0-100M LATTICE 7404 : P8HXLO71-8GE-100M I

AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 7400 7467 7469 7468 7404 (GWd/ST) 0.00 11.85 12.00 11.11 12.08 11.85 0.20 11.78 12.06 11.14 12.15 11.78 1.00 11.59 12.18 11.24 12.30 11.59 2.00 11.57 12.36 11.44 12.53 11.57 3.00 11.61 12.50 11.70 12.68 11.61 4.00 11.68 12.60 11.99 12.82 11.68 )

5.00 11.75 12.71 12.26 12.96 11.75 l O- 6.00 11.81 12.84 12.37 13.12 11.81 7.00 11.86 13.01 12.51 13.29 11.86 8.00 11.91 13.20 12.68 13.44 11.91 9.00 11.94 13.39 12.86 13.53 11.94 10.00 11.97 13.52 13.01 13.55 11.97 12.50 11.75 13.44 13.09 13.44 11.75 15.00 11.38 13.06 12.84 13.07 11.38 20.00 10.59 12.32 12.21 12.33 10.59 25.00 9.81 11.60 .11 54 11.61 9.81 35.00 8.26 -10.21 10.25 10.22 8.26 44.89 4.93 - - -

4.93 45.00 -

8.72 8.82 8.72 -

50.76 - - - 5.87 -

50.78 -

5.86 - - -

50.88 - -

5.90 - -

l .Page 2-7 Quad Cities Unit 2 Cycle 15 Revision 1

)

Cora Opercting Limits R; port May 1998 TABLE 2-8 O MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE : GE10-P8HXB312-7GZ-100M-145-T

. LATTICE 7400 : P8HXLO71-NOG-100M LATTICE 7405 : P8HXL330-3G4.0/4G3.0-100M LATTICE 7406 : P8HXL354-1G4.0/6G3.0-100M LATTICE 7407 : P8HXL336-7G3.0-100M LATTICE 7408 : P8HXLO71-7GE-100M AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 7400 7405 7406 7407 7408 (GWd/ST) 0.00 11.85 12.01 11.27 12.04 11.85 0.20 11.78 12.08 11.31 12.11 11.78 1 1.00 11.59 12.23 11.42 12.27 11.59 )

2.00 11.57 12.43 11.65 12.49 11.57 11.61 I 3.00 11.61 12.65 11.93 12.72

/ 4.00 11.88 12.88 12.24 12.96 11.68 5.00 11.75 13.09 12.58 13.15 11.75 6.00 11.81 13.22 12.94 13.30 ~ 11.81 7.00 11.86 13.32 13.15 13.41 11.86  ;

8.00 11.91 13.40 13.32 13.46 11.91

. 9.00 11.94 13.45 13.43 13.47 11.94 10.00 11.97 13.47 13.50 13.45 11.97 12.50 11.75 13.35 13.45 13.35 11.75 15.00 11.38 12.97. 13.10 12.97 11.38 20.00 10.59 12.23 12.41 12.24 10.59 25.00 9.81 11.51 11.74 11.52 9.81 35.00 8.26 10.14 10.41 10.15 8.26 44.89 4.93 - - -

4.93 45.00 -

8.61 9.01 8.60 -

50.55 - - - 5.85 -

50.59 - 5.85 - - -

51.56 - -

5.86 - -

)

i Page 2-8 L Quad Cities Unit 2 Cycle 15 Revision 1

Cora Oper: ting Limits R: port May 1998 O

TABLE 2-9 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE : SPCA9-372B-11GZH-ADV l

Average Planar ATRIUM-98

Exposure MAPLHGR (kW/ft) l (GWd/MTU)

G.0 13.5 20.0 13.5 60.0 8.7 TABLE 2-10 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE : SPCA9-3588-11G2.L-ADV l

Average Planar ATRIUM-98 Exposure MAPLHGR (kW/ft) ,

(GWd/MTU) 0.0 13.5 20.0 13.5

. 60.0 8.7 l

l 1

Page 2-9 Quad Cities Unit 2 Cycle 15 Revision 1

Core Operating Limits Report May 1998 3.0 LINEAR HEAT GENERATION RATE (LHGR) ,

3.1 TECHNICAL SPECIFICATION

REFERENCE:

l Technical Specification 3.11.D]

3.2 DESCRIPTION

A. The LHGR limit is 14.4 Kwift for all GE fuel types:

1. GE98-P8DWB310-9GZ-80M-145-T
2. GE98-P8DWB299-11GZ-80M-145-T
3. GE98-P8DWB286-7G3.0-80M-145-T
4. GE9B-P8DWB286-9GZ-80M-145-T
5. GE98-P8DWB310-7G3.0-80M-145-T
6. GE98-P8DWB308-10GZ1-80M-145-T
7. GE10-P8HXB316-8GZ-100M-145-T
8. GE10-P8HXB312-7GZ-100M-145-T G B. The LHGR limits are provided in the table below for all of the SPC fuel types:
1. SPCA9-372B-11GZH-ADV
2. SPCA9-358B-11GZL-ADV Average Planar ATRIUM-9B LHGR Exposure (kW/ft)

(GWd/MTU) 0.0 14.4 15.0 -14.4 61.1 8.32 The Protection Against Power Transient LHGR Limit for ATRIUM-98 Offset fuelis provided in Figure 3-1.

Page 3 Quad Cities Unit 2 Cycle 15 Revision 1

Cora Operating Umits Report

. May 1998 O

22 (0,19.4) -

(15,19.4) 20 .

18 .-

g 16 -

!!: 14 -

h 12 -  %

i 10 - (61.1,11.R O 8-z

' 6-4-

2- i O 0 . . . . . . . . . . . .

0 5 10 15 20 25 30 35 40 45 50 55 60 65 Average Planar Exposure, GWdMRJ l

OUAD CITIES UNIT 2 CYCLE 15 REVISION 1 PROTECTION AGAINST POWER TRANSIENT LHGR LIMIT FOR ATRIUM 9B OFFSET FIGURE 3-1 l

V Page 3-1 Quad Cities Unit 2 Cycle 15 Revision 1

Cens Opercting Limits Report May 1998 i

4.0 MINIMUM CRITICAL POWER RATIO (MCPR) 4.1 TECHNICAL SPECIFICATION

REFERENCE:

l Technical Specification 3.11.Cl 4.2 . DESCRIPTION:

1-During steady-state operation at rated core flow, the Operating Limit MCPR (OLMCPR) shall be greater than or equal to:

i

-1.58 fc 3E9B fuel

-1.53 for GE10 fuel

-1.47 for ATRIUM-9B fuel for:

5% insertion tave 5 0.375 seconds 20% insertion tave 5 0.90 seconds 50% insertion tave 5 2.00 seconds 90% insertion tave 5 3.50 seconds where tave = Technical Specification scram insertion times for all surveillance data from Technical Specification 3/4.3.E which has been generated in the current cycle. Where t is less than or equal to the Technical Specification Scram Speed.

For core flows less than rated, reduced flow MCPR, curves for Manual Flow Control are provided in Figure 4-1. MCPR, values for Automatic Flow Control are provided in Table 4-1.

The OLMCPR limits stated above are valid for all planned Operational modes, including Increased Core Flow (ICF) and Final Feedwater Temperature

. Reduction (FFTR). The value corresponds to the cycle specific determination of

~

.the bounding event. For Unit 2 Cycle 15 Re. vision 1 this event is the Feedwater Controller Failure (FWCF) Ev'ent for GE9 and 10 fuel and the FWCF Event and the Load Rejection with No Bypass Event for Atrium-9B fuel with the above Operational modes incorporated. This value was determined to be 1.47 for the ATRIUM-98 bundles,1.53 for the GE10 bundles, and 1.58 for the GE98 bundles, for the Technical Specification Scram Speeds. This limit is increased by 0.04 for any and all combinations of Quad Cities Equipment Out-Of-Service /

Extended Operating Domain analysis (Reference 6) excluding Single Loop Operation (SLO), For SLO, the OLMCPR is increased by 0.01. The above OLMCPR values include a 0.01 adder to permit operation with reactor steam dome pressure up to 15 psi below rated pressure from 90% to 100% CTP.

Below 90% CTP, the 15 psi band requirement is not required (Reference 9).

Unit Two has been approved for operating up to 15% (Reference 6) above Page 4 Quad Cities Unit 2 Cycle 15 Revision 1

Cora Operating Limits Rzport May 1998 equilibrium coastdown power level with allowance for multiple control rods inserted. At End of Full Power Capability (EFPC) the generic EOOS/EOD MCPR operating limit MCPR penalty of 0.04 must be added to the operating limit MCPR in order to exceed equilibrium xenon coastdown power, i

l O 1 l

l l

l l

i i

I Page 4-1 i r\

tg Quad Cities Unit 2 Cycle 15 Revision 1 ,

i

L*

i.

Core Operating Limits R2 port

{- M y 1998

[.

O 1.s , , , ,

' ~

. GE9 MCPR(f) Umit '

GE10 McPR(f) Umit ATauu-se offset .

. . WCPR(f) Umit '

+ GES Results

~

t x E10 Results $ -

+ AT10UW-98 Offset

-h -

Results g 2.0 ,

M  : -  :

a 1.8 -

.2 -

' + ". i l T 1.s - e ,

m M., .

o .

E 1,4 -

8 -

l

. s .

~

'2 ~ ~

e i,o

'O 20 40 60 80 100 120 l

. Total Core Flow (% Roted)

Recirculation Flow GE9 GE 10 ATRIUM-98 Offset  !

MCPR, Limit MCPR, Limit MCPR, Limit

(%'ofrated 110 1.10 1.10 1.10 30 1.95 1.94 1.96 I

2.50 2.49 2.49 O

QUAD CITIES UNIT 2 CYCLE 15 REVISION 1 MCPR, CURVE FOR MANUAL FLOW CONTROL FIGURE 4.1  ;

l

,rm \

t a- Page 4-2

</

- Quad Cities Unit 2 Cycle 15 Revision 1 l

Cora Operating Limits Rsport May 1998 Automatic Flow Control MCPR, Results Base Case OLMCPR EOD/EOOS OLMCPR Core Flow

(% rated) QE2 GE10 ATRIUM-98 ggg GE1Q ATRIUM-98 108 1.58 1.53 1.47 1.82 1.57 1.51 30' 2.95 2.85 2.77 3.02 2.92 2.85 0 3.85 3.72 3.59 3.95 3.82 3.72 O

I 1

Page 4-3 l 5.0 Analytical Methods l "O  !

Quad Cities Unit 2 Cycle 15 Revision 1

e Core Operating Limits Rsport May 1998 The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC in the latest approved revision or

. supplement of the topical reports describing the methodology. For Quad Cities' Unit 2, the topical reports are:

(1) GE Document, NEDE-24011-P-A " Gene"al Electric Standard Application for

. Reactor Fuel," (latest approved revision).

(2) Commonwealth Edison Topical Report NFSR-0091, " Benchmark of BWR .

Nuclear Design Methods," (latest approved r.evision).

(3) Commonwealth Edison Topical Repost NFSR-0091 Supplement 1, " Benchmark of CASMO/MICROBURN BWR Nuclear Design Methods", (As Supplemented)

(4) SPC document," Application of the ANFB Critical Power Correlation to Coresident GE Fuel for Quad Cities Unit 2 Cycle 15", EMF-96-051(P), May, 1996.

O Page 5 6.0 Attachments Quad Cities Unit 2 Cycle 15 Revision 1

Core Opercting Limits Report

(. May 1998 Attachment 1. Quad Cities Unit 2 Cycle 15 Reload Analysis O Attachment 2. Quad Cities Unit 2 Cycle 15 Plant Transient Analysis O

Page6 O

Quad Cities Unit 2 Cycle 15 Revision 1

i NUCLEAR FUEL SERVICES DEPARTMENT NUCLEAR DESIGN INFORMATION TRANSMITTAL

@ SAFETYRELATED Originating Organizauon NDIT No. 970069 0 NON-SAFETY RELATED E Nuclear Fuct Services Rev.No. Sea 04 O REGULATORY RELATED O OtherIspecify) Pese1ofI l

l Stanon Ouad Cities Unit 2 Cycle 15A Generic To, Mike Ford l

I Subject Ouad Citics Unit 2 Cvele 16 Reload Analvses. EMF.%I77. Revisen 3 Nancy J. Iluck N Preparer Prepd s Signatu T Dane John M Freeman jj 4 /w w /(

Reviewer viewer s hagnature ' Date' Edward A McVev 0 $b f=&&$

.)

NI S hupervesor NFS Supervisor s b'agnature Date Status of informanon' Venfied Unverifed O Engmeerms Judgement O Method and Schedule of Verificanon for Unvenf.ed NDITs:

Desenpuon ofInformation: EMF-96-177 Rev. 2 was provided as part of the 02Cl5 Reload Licensmg Documents per SPC letter JHR 97-160 EMF 06-177. Rev. 2 supports 02Cl5 operauon This NDIT revises EMF-%I77 Rev, I, NDIT970n9 due to a change to the MCPR$L.

NDIT97009 shoud be labeled as " SUPERSEDED" 1.MF 46177 Rev. J was provihd due to modifications associated with changes to the ATRIUM 9B additive constants and changes tor operanon w nh reactor pressures less than the design pressures. This NDIT supercedes NDIT970069 Seq 00.

Purpose ofInformauon: Suppon QC2 C15:evi st'artup Source ofInformanon Siemens Power Coporanon. Richland WA Supplemental Distribution: OC Central file R. A. Canalas/ Mike Ford w/o attachment N J. Buck w/o attachment J. K. Wheeler w/o attachment DG Central File A