SVP-98-364, Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With
ML20198E267
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 11/30/1998
From: Dimmette J, Hamilton L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SVP-98-364, NUDOCS 9812240009
Download: ML20198E267 (11)


Text

. _.

i'*

,4 n>mmonweaioi unon company

, Quad citics Generating Station 22'l0 206th Asenue North

( :ordova. 11.61262 9740 nuo<> 6u22 u

- SVP-98-364 1

December 14,1998

! I U.S. Nuclear Regulatory Commission l Washington, DC 20555 Attention: Document Control Desk

Subject:

Quad Cities Nuclear Power Station, Units 1 and 2 Monthly Performance Report i Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Enclosed for your information is the Monthly Performance Report covering the operation of Quad Cities Nuclear Power Station, Units One and Two, during the month of November 1998.

If you have any questions or comments concerning this letter, please refer them to Mr. Charles Peterson, Regulatory Assurance Manager, at (309) 654-2241, extension 3609.

Sincerely, Joel P. Dimmette, Jr.

Site Vice President

. Quad Cities Station Enclosure cc: Acting Regional Administrator, Region Ill Senior Resident Inspector, Quad Cities

[/

9812240009 981130 7- h@l 1 PDR ADOCK 05000254 R PDR a A Unicum company

.. . ~ . . . . . - . - . . . - . . . - . . - . . . - . . . ~ - . . . . . . . . ~ . . . . - . . . - - . - . . - ~ . .

l i

, QUAD CITIES NUCLEAR POWER STATION l

l' UNITS 1 AND 2 l

l r

l MONTHLY PERFORMANCE REPORT  ;

l.

~

NOVEMBER 1998 i l

l 1

t l

l COMMONWEALTH EDISON COMPANY l l

AND i t-MIDAMERICAN ENERGY COMPANY l

l l 1

l NRC DOCKET NOS. 50-254 AND 50-265 i

LICENSE NOS. DPR-29 AND DPR-30 i

l l

l i

i 4

l- 1 1

TECHOP3\NRC\NOV98 DOC

. . i

'(

r.

TABLE OF CONTENTS i 1.- Introduction l II. Summary of Operating Experience

.A. Unit One 1 B. Unit Two III. Operating Data Statistics - 1 i

A.- Operating Data Report for November- Quad Cities Unit One B. Operating Data Report for November- Quad Cities Unit Two i

~

IV. Unit Shutdowns A. Unit One Shutdowns i B. Unit Two Shutdowns ,

j V. Amendments to Facility License or Technical Specifications VI. Unique Reporting Requirements l

A. Main Steam Relief Valve Operations l

l i

i 2-TECHOP3WRC\NOV98 DOC '

-. _ - . -- .-_ -= . - . . -

l l

I. INTRODUCTION Quad Cities Nuclear Power Station is composed of two Boiling Water Reactors and Steam '

Turbine / Generators, each with a Maximum Dependable Capacity of 769 MWe Net, located in Cordova, Illinois. The Station isjointly owned by Commonwealth Edison Company and 1

MidAmerican Energy Company. The Nuclear Steam Supply Systems are General Electric l Company Boiling Water Reactors. The Architect / Engineer was Sargent & Lundy, Incorporated, and the primary construction contractor was United Engineers & Constructors. The Mississippi River is the condenser cooling water source. The plant is subject to license numbers DPR-29 and DPR-30, issued October 1,1971, and March 21,1972, respectively; pursuant to Docket Numbers 50-254 and 50-265. The date ofinitial Reactor criticalities for Units One and Two, respectively were October 18,1971, and April 26,1972, Commercial generation of power began on February 18,1973 for Unit One and March 10,1973 for Unit Two.

This report was compiled by Lynne Hamilton and Debra Kelley, telephone number 309-654-2241, extensions 3114 and 2240, respectively, ncnormacwows noc

1

11.

SUMMARY

OF OPERATING EXPERIENCE i

i A. Unit One I

Quad Cities Unit One began the month of November operating at full power. On November 7,1998, at 12:10 a.m., the main turbine was tripped, and at 12:40 a.m., the reactor was manually shutdown for the Q1 R15 retuel outage. Normal outage activities i occurred through the remainder of the month of November. j B. Unit Two Quad Cities Unit Two began the month of November operating at full power. On I November 8,1998, at 3:00 p.m., an operator noted that the EHC reservoir was two and 1 one-halfinches lower than on previous rounds. The leak was found and EHC fluid was )

added to the reservoir. However, the leak continued. It was determined that one of the o-rings on the #4 control valve servo was extruded, and it was necessary to take the turbine off-line to properly fix the leak. On November 8,1998, power was dropped to )

30% and at 11:06 p.m., the main turbine was tripped. The leaking servo valve was 4 replaced and the turbine was back on-line on November 9,1998, at 2:29 a.m. Full  !

power was achieved by 9:20 a.m. For the remainder of the month, the unit operated at full power with minor down power operations for routine maintenance and surveillance testing.  ;

l l

1 l

1 l

l I

l

! l r

TECilOP3;NRC\NOV98 DOC l

l- -

l I

, III. OPERATING DATA STATISTICS l

A. Unit One Operating Data Repolt for November 1998 l

l DOCKET NO.: 50-254 DATE: December 10,1998 COMPLETED BY: Lynne llamilton TELEPIIONE: (309) 654-2241 OPERATING STATUS 0000 110198

1. REPORTING PERIOD: 2400 113098 GROSS !!OURS IN REPORTING PERIOD: 720
2. CURRENTLY AUTilORIZED POWER LEVEL (htWi): 2511 h1AX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789 Tills MONTil YEAR TO DATE CUMULATIVE
3. NUMBER OF llOURS REACTOR WAS CRITICAL 144.70 3752.00 176127.40
4. REACTOR RESERVE SlIUTDOWN IIOURS 0.00 0.00 3421.90 l
5. IlOURS GENERATOR ON LINE 144.20 3658.10 170953.40 1
6. UNIT RESERVE SilUTD0WN IIOURS 0.00 0.00 909.20
7. GROSS TIIERMAL ENERGY GENERATED (MWil) 339245.76 8812619.52 374249862.12 !
8. GROSS ELECTRICAL ENERGY GENERATED (MWil) 109482.00 2813675.00 121067044.00
9. NET ELECTRICAL ENERGY GENERATED (MWil) 99443.00 2675239.00 108830208.00 l
10. REACTOR SERVICE E\CTOR 20.10 46.81 75.43
11. REACTOR AVAILABI'_ITY FACTOR 20.10 46.81 76.90
12. UNIT SERVICE FACTOR 20.03 45.63 73.22
13. UNIT AVAILABILITY FACTOR 20.03 45.63 73.60
14. UNIT CAPACITY FACTOR (Using MDC) 17 96 43.40 60.61
15. UNIT CAPACITY FACTOR (Using Design Mwe) 17.51 42.30 59.07 lb. UNIT FORCED OUTAGE RATE 0.00 0.02 7.11 I

l 5-Tr.Cil0P3iNRC\NOV98 DOC

('

III. OPERATING DATA STATISTICS

B. Unit Two Operating Data Report for November 1998 I

DOCKET NO.: 50-265 DATE: December 10,1998 COMPLETED BY: Lynne Hamilton TELEPHONE: (309) 654-2241 l

- OPERATING STATUS IXX)0 110198

1. REPORTING PERIOD: 2400 113098 GROSS IIOURS IN REPORTING PERIOD: 720
2. CURRENTLY AUTIIORIZED POWER LEVEL (MWt): 2511 . MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL g RATING (MWe-NET): 789 Tills MONTil YEAR TO DATE CUMULATIVE
3. NUMBER OF IlOURS liEACTOR WAS CRITICAL 720.00 4486.05 168853.10 i
4. REACTOR RESERVE SIIUTDOWN IIOURS 0.00 0.00 2985.80 ,
l. 5. IIOURS GENERATOR ON LINE 716.60 4352.90 164322.75 l t
6. UNIT RESERVE SIIUTDOWN IIOURS 0.00 0.00 702.90 7.- GROSS TIIERMAL ENERGY GENERATED (MWil) 1794162.24 10616172.24 358972428.56 l 8. GROSS ELECTRICAL ENERGY GENERATED (MWil) 583537.00 3378677.00 115141221.00 4 i  ;
9. NET ELECTRICAL ENE!tGY GENERATED (MWil) 561663.00 3234598.00 109182056.00 j 10. REACTOR SERVICE FACTOR 100.00 55 96 72.80
11. REACTOR AVAILABILTY FACTOR 100.00 55.96 74.09 l
12. UNIT SERVICF FACTOR 99.53 54.30 70.85 I 1
13. UNIT AVAILABILITY FACTOR 99.53 54.30 71.15 l 1
14. UNIT CAPACITY FACTC ((Using MDC) 101.44 52.47 61.22 1

! 15. UNIT CAPACITY FACTOR (Using Design Mwe) . 98.87 51.14 59.66

16. UNIT FORCED OLTTAGli RATE 0.47 4.00 11.01 l

I i

l 1

i 6-t TLCllOP3sNRC\NOV98. DOC I l

i. .

l

. l l

~IV. UNIT SHUTDOWNS A. Unit One Shutdowns for November 1998 DOCKET NO,: 254-DATE: December 10,1998 COMPLETED BY: Lynne Hamilton TELEPHONE: (309) 654-2241 l

l No. DATE TYPE DURATION REASON METHOD OF CORRECTIVE FOR (llOURS) SIIUTTING ACTIONS / COMMENTS S DOWN REACTOR I 93-09 C 981107 S 575.8 1 Q1R15 Refuel 0"' age l

l l

l l

Legend:

(1) Reason l A - Equipment Failure (Explain)

[ B - Maintenance or Test C - Refueling l

j D - Regulatory Restriction j l E - Operator Training /Liceme Examination I l F - Administrative l G - Operational Error (Explain)

.11 - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip / Scram 3 - Automatic Trip / Scram 4 - Contmuation 5 - Other (Explain) 4

-7 TECH 0H\NRC\NOV98. DOC

(.

l l

l l IV. UNIT SHUTDOWNS ,

1 i B. Unit Two Shutdowns for November 1998 l

- DOCKET NO.: 50-265 DATE: December 10,1998 i COMPLETED BY: Lynne Hamilton TELEPHONE: (309) 654-2241 No. DATE . TYPE DURATION REASON METilOD OF CORRECTIVE j FORS (llOURS) SilUTTING ACTIONS /CONIMENTS 1 I

DOWN I

REACTOR 98-08 981108 F 3.4 A 5 Main Turbine Tripped Reactor Remained Critical #4 Control j _

Valve Servo Replaced ,

l I

Legend:

(1) Reason ,

A - Equipment Failure (Explain)  !

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training / License Examinatiur F - Admmistratae .

G - Operational Error (Explain) 11 - Other (Explain)

(2) Methal 1 - Manual 2 - Manual Trip / Scram 3 - Automatic Trip / Scram 4 - Continuation 5 - Other (Expl*N l

l l

l-TECilOl%NRC\NOV98 DOC l

m . - _ _ . - - ,- . - , . . - + , . . - , - _ . . . . - - - - . - . .

i l i

l 1

I

- - V. Amendments to Facility License or Technical Specifications  ;

l i

! 1 There were no Amendments to the Facility License or Technical Specifications for the l

! reporting period.

l i

i i

l I

l l

i l

l t

9 i

TLCllOP3WRC\NOV98. DOC

,. ,

  • 1 1

i l l

~ '

VI. UNIQUE REPORTING REQUIREMENTS .l

'l The following items are included in this report based on the requirements set forth in Technical j Specification 6.9.A.5,

)

l  !

! A. Main Steam Relief Valve Operations I i.

l 1

There were no Relief Valve Operations during the reporting period.