Telecopy Ao:On 750725,during Completion of Inerting,Primary Containment Oxygen Concentration Was Not within Tech Spec Limits.Further Info to Be Provided in AO 50-265/75-26
ML20084S264
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 07/25/1975
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084S261 List:
References
NJK-75-381, NUDOCS 8306160386
Download: ML20084S264 (1)


Text

__

~s C:mmor^1alth Edison et

^-N Ouart Cit /

bclear Power Station C4 Pott OthchD$x 21G

//

Cordova, ilhnois 61242 QDf-Tetephonc 309/054-7241

.NJK-75-381

~

Telecopy:

Region 111, Attention:

Mr. C. 'Telerabend July 25, 1975 i

J. Keppler, Regional Di rector Di rectorate of Regulatory Operations Region til U. S. Nuclear Regulatory Commission 793 Roosevelt Road Glen Ellyn, Illinois 60137 Re ference : Quad-Cities Nuclear Power Station Docket No. 50-265, DPR-30 Appendix A, Sections 1.0.A.2, 3 7.A.S.b, 6.6.B.I.a

Dear fir. Keppier:

The purpose of this letter is to provide you with notification of an Abnormal Occurrence as requi red by Techni cal Speci fication 6.6.B. i.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

On July 25, 1975 the Unit Two primary containment oxygen concentration was not within Technical Specification limi ts 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> subsequent to a start up f rom a shutdown condi tion.

Difficulties were encountered with operation

.of the !!2 vaporizing equipment.

Completion of inerting was in progress at the -time of the occurrence.

This occurrence was discussed by telephone with Mr. Knop of your office on July 25, 1975 Further information will be provided by Abnormal Occurrence Report No. 50-265/75-26 which will be submitted within 10 days of the date

.of this occurrence.

Very truly yours, COMMONWEALTH EDISON COMPANY QUAD-CITIES NUCLEAR POWER STA 10N

'k ork

/

N. J. Kall vianakis Station Superintendent NJK/lk.

Director of Office of Nuclear Reactor Regulation cc:

J. S. Abel 8306160386 750814