Site: Quad Cities  Constellation icon.png
Issue date: 07/31/1999
From: Dimmette J, Hamilton L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SVP-99-155, NUDOCS 9908180147
Download: ML20210S625 (11)


Text

F .

  • Osmmonw cahh 1dimo O>mpans
  • ~ *

, Quad Glies Generadng Statunt 22710 3 Kith Asenue Nonh O rrdin a, 11.61212 9'40 rei Mru,su24 i t a August 13,1999 SVP-99-155 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Monthly Operating Report in accordance with Generic Letter 97-02 and Technical Specification 6.9.5,

" Monthly Operating Reports," we are submitting the Monthly Operating Report for Quad Cities Nuclear Power Station, Units 1 and 2. This report covers the period July 1,1999, to July 31,1999.

Should you have any questions concerning this letter, please contact Mr. C.C.

Peterson at (309) 654-2241, extension 3609.

Resp tfully, 0,

ptl) pid oel P. Dimmette, Jr.

ite Vice President Quad Cities Nuclear Power Station Attachment 1

cc: Regional Administrator- NRC Region ill NRC Senior Resident inspector- Quad Cities Nuclear Power Station 9908180147 990731 PDR ADOCK 05000254

/ y-f,N(

by ! g R PDR j j A !!nicum Onnpan)

ATTACHMENT QUAD CITIES NUCLEAR POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT COMMONWEALTH EDISON COMPANY AND MIDAMERICAN ENERGY COMPANY FACILITY OPERATING LICENSE NOS. DPR-29 AND DPR-30 NRC DOCKET NOS 50-254 AND 50-265 l

l TECHOPENROJULY99.IX)C L

r; o- . .

I s' b TABLE OF CONTENTS l

1. Introduction
11. Summary of Operating Experience l A. Unit One B. - Unit Two Ill. ~ Operating Data Statistics A. Operating Data Report for July - Quad Cities Unit One B. Operating Data Report for July - Quad Cities Unit Two IV, Unit Shutdowns

! A. Unit One Shutdowns I

B. Unit Two Shutdowns l V. Amendments to Facility License or Technical Specifications VI. ' Unique Reporting Requirements ,

A. Main Steam Relief Valve Operations l l

l i

I i

2-

' TECliOP3WRCJULY99. DOC

-f ...

i i-

,' i

1. INTRODUCTION L

Quad Cities Nuclear Power Station is composed of two Boiling Water Reactors and l - Steam Turbine / Generators, each 'with a Maximum Dependable Capacity of 769 MWe Net, located in Cordova, Illinois. The Station is jointly owned by Commonwealth Edison I

L Company and MidAmerican Energy Company. The Nuclear Steam Supply Systems are General Electric Company Boiling Water Reactors. The Architect / Engineer was Sargent

& Lundy, incorporated, and the primary construction contractor was United Engineers &

l Constructors. The Mississippi River is the condenser cooling water source. The plant is i

subject to license numbers DPR-29 and DPR-30, issued October 1,1971, and March 21, -l 1

1972, respectively; pursuant to Docket Numbers 50-254 and 50-265. The date of initial l l.

Reactor criticalities for Units One and Two, respectively were October 18,1971, and  ;

April 26,1972. Commercial generation of power began on February 18,1973 for Unit  !

One and March 10,1973 for Unit Two.

This report was compiled by Lynne Hamilton and Debra Kelley, telephone number l

309-654-2241, extensions 3114 and 2240, respectively.

i

_TECHOP)\NRCVULY99. DOC

n .

h  :

i l

11.

SUMMARY

OF OPERATING EXPERIENCE A. . Unit One Quad Cities Unit One began the month of July operating at full power. Unit One operated throughout the remainder of the month at full power with minor down power operations for routine maintenance and surveillance testing.

B. Unit Two Quad Cities Unit Two began the month of July operating at full power. Unit Two l

operated throughout the month at full power with minor down power operations for routine maintenance and surveillance testing.

l

)

l l

4 TEcuorswacWLY99.txx-

j

' ' I Ill. OPERATING DATA STATISTICS

]

A. Unit One Operating Data Report for July 1999 DOCKET NO.: 50-254 DATE: August 13,1999 COMPLETED BY: _ Lynne Hamilton TELEPHONE: (309) 654-2241 l OPERATING STATUS 0000 070199

1. REPORTING PERIOD: 2400 073199 GROSS HOURS IN REPORTING PERIOD: 744 l
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 l DESIGN ELECTRICAL RATING (MWe-NET): 789 THIS MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00 4572.60 181369.30 4, REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 3421.90
5. HOURS GENERATOR ON LINE 744.00 4537.20 176132.60
6. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 909.20
7. GROSS THERMAL ENERGY GENERATED (MWH) 1851225.60 11263240.56 387011735.16
8. GROSS ELECTRICAL ENERGY GENERATED (MWH) 596451.00 3666988.00 125224331.00
9. NET ELECTRICAL ENERGY GENERATED (MWH) 568018.00 3494699.00 112792552.00
10. REACTOR SERVICE FACTOR 100.00 89.89 75.78
11. REACTOR AVAILABILITY FACTOR 100.00 89.89 77.21
12. UNIT SERVICE FACTOR 100.00 89.19 73.60
13. UNIT AVAILABILITY FACTOR 100.00 89.19 73.98
14. UNIT CAPACITY FACTOR (Using MDC) 99.28 89.34 61.29
15. UNIT CAPACITY FACTOR (Using Design Mwe) 96.76 87.07 59.73 i
16. UNIT FORCED OUTAGE RATE 0.00 0.00 6.92 TECH 0P3WRC\lULY99 DOC l

111. OPERATING DATA STATISTICS

' B. Unit Two Operating Data Report for July 1999 DOCKET NO.: 50-265 DATE: August 13,- 1999 COMPLETED BY: Lynne Hamilton '

TELEPHONE: (309)654-2241 OPERATING STATUS 0000 070199

1. REPORTING PERIOD: 2400 073199 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 <

DESIGN ELECTRICAL RATING (MWe-NET): 789 THIS MONTH YEAR TO DATE CUMULATIVE

3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00 4888.80 174485.90
4. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 2985.80
5. HOURS GENERATOR ON LINE 744.00 4864.30 169931.05
6. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 702.90
7. GROSS THERMAL ENERGY GENERATED (MWH) 1862113.44 12141897.84 372981980.70
8. GROSS ELECTRICAL ENERGY GENERATED (MWH) 592406.00 3918451.00 119667581.00
9. NET ELECTRICAL ENERGY GENERATED (MWH) 568677.00 3768919.00 113535963.00
10. REACTOR SERVICE FACTOR 100.00 96,10 73.39
11. REACTOR AVAILABILITY FACTOR 100.00 96.10 74.64
12. UNIT SERVICE FACTOR 100.00 95.62 71.47
13. UNIT AVAILABILITY FACTOR 100.00 95.62 71.77
14. UNIT CAPACITY FACTOR (Using MDC) 99.40 96.34 62.10
15. UNIT CAPACITY FACTOR (Using Design Mwe) 96.88 93.90 60.52
16. UNIT FORCED OUTAGE RATE 0.00 0.00 10.69 l

a i

l

' TECilOP3iNRCVULY99. DOC l

fl , .

IV. UNIT SHUTDOWNS i s l A. Unit One Shutdowns for July 1999 l

l l DOCKET NO.: 50-254 DATE: August 13,1999 COMPLETED BY: Lynne Hamilton TELEPHONE: (309) 654-2241 No. DATE TYPE DURATION REASON METHOD OF CORRECTIVE F OR (HOURS) SHUTTING ACTIONS / COMMENTS l 8 DOWN i l REACTOR None for the Month of July.

i l

l l

l l

l I Legend:

(1) Reason A- Equipment Failure (Explain)

B - Maintenance or Test I C - Refueling l D- Regulatory Restriction

! E - Operator Training / License Examination

! F - Administrative l G - Operational Error (Explain) l H - Other (Explain) l (2) Method 1 - Manual

, 2 - Manual Trip / Scram 3 - Automatic Trip / Scram 4 - Continuation 5- Other (Explain) l l

t l

TliCilOP3\NRCVULY99. DOC

1

, . 1 4

IV. UNIT SHUTDOWNS B. Unit Two Shutdowns for July 1999 DOCKET NO.: 50-265 DATE: August 13,1999 COMPLETED BY: Lynne Hamilton TELEPHONE: (309) 654-2241 ,

No. DATE TYPE DURATION REASON METHOD OF CORRECTIVE F OR S (HOURS) SHUTTING ACTIONS / COMMENTS DOWN REACTOR None for the Month of July.

Legend:

(1) Reason A- Equipment Failure (Explain) l B - Maintenance or Test C- Refueling D - Regulatory Restriction E - Operator Training / License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip / Scram 3 - Automatic Trip / Scram 4 - Continuation 5 - Other (Explain) j 1

J 1

TECllOP3\NRCNJULY99.!XX7

- V. AMENDMENTS TO FACILITY LICENSE OR TECHNICAL SPECIFICATIONS There were no Amendments to the Facility License or Technical Specifications for the reporting period.

1 I

I t

1 l

l l

I I

'9-nciionxacuutxnnoe

i

/ t VI. UNIQUE REPORTING REQUIREMENTS The following items are included in this report based on the requirements set forth in Technical Specification 6.9.A.5.

A. Main Steam Relief Valve Operations There were no Relief Valve Operations during the reporting period.

)