ML20084S004
| ML20084S004 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 08/31/1975 |
| From: | Kalivianakis N COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20084R997 | List: |
| References | |
| NJK-75-438, NUDOCS 8306160105 | |
| Download: ML20084S004 (1) | |
Text
,
.=,
c e.
_O O
O.wid. Cities Gwetteg Giation/
I ;
Post Office Box 216' Cordova,lEttots61242 ~
Tsiephone M/854-2241 '
75-438-reopy r.
Region III Attention:
Mr. C. Feierabend at 31e 1975 L pplor, Regional Director
.ce of Inspection.and. Enforcement.
.cn.III
- 1. Nuclear-Regulatory-Commission.
Roooovelt Road.
rEllyn,. Illinois.60137 troncat Quud-Cities. Nuclear
- Power Station-, Unit.2
-Docket No. 50-265,. DPR-30 Appendix; A, Sections 1.0. A. 4, 3 5.C 1, 3 5.'C:. 3, 6.6.B.I.a.
- " Me'.. Keppler:
purpcse of thiss letter"ist to provide you with. notification'.of ans armal Occurrence as required by Technical Specification: 6.6 B,1.a.
sin': 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the coeurrence.
Luguct 30, 1975, while. testing.the operability of the HPCI system to a failure of the RCIC: system, it was discovered that.the HPCI eac wac also inoperable..
The auxiliary oil pump. kept tripping th9 HPCI turbine would: not start.
29 tho RCIC syctem was also inoperable...an orderly shutdown. of the.
- .wnc initiated.
5.Cocurrence was discussed by telephonecwith.Mr. Allen.of your>
Lc0 on August-30, 1975 Further information, will be provided by-srmal Occurrence Report AO 50 26.5/75-35mwhich.will be subinitted.
iin(10 days. of the date of' this: occurrence.
r truly yours, 40NWEALTH. EDISON. COMPANY 3-CITIES NUCLEAR: POWER. STATION' Cf f
T.. Kalivianakis.
bion Superintendent
/RAR/cca
~
Office. of Nuclear ReactortRegulation.
G; A..Abrell l
f'306160105 750909 PDR ADOCK 05000265 4
S PDR 1
-