Ao:On 751029,RHR Sys 2 Supply from Emergency Diesel & Core Spray Sys 2 Bus/Logic Power Failure Alarms Received.Caused by Switch 12 in Off Position.Switch Returned to on Position. Addl Info Will Be Submitted in AO 50-265/75-43
ML20084S593
Person / Time
Site: Quad Cities 
Issue date: 10/30/1975
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NJK-75-541, NUDOCS 8306170125
Download: ML20084S593 (1)


Text

.

F C mm:nwnith Edis:n Quad Citi:' Ncicar Power Station

{

% d-Post OfficUd 216 Cordova. Ilknois 61242 Teicphone 309/654 2241 l

NJK-75-541

,. i, _

-..t Telecopy:

Region lit, Attention:

Mr. C. Feie rabend V\\

'b s

ll//l V}j), f \\

No

'1 October 30, 1975

{

l'.

/g 8

y,J _

p r

~

J. Keppler, Regional Director Office of Inspection and Enforcement I :::

IN Region til i

U. S. Nuclear Regulatory Commission 799 Recsevelt Road Glen Ellyn, Illinois 60137,

t h

Reference :

Quad-Cities Nuclear Power Station, Unit 2 Docket No. 50-265, DPR-30 h

Appendix A, Sections 1.0.A.4, 3.5.A.1, 3 5.A.3, 6.6.B.I.a

Dear Mr. Keppler:

l 2

The purpose of this letter is to provide you with notification of an Abnormal Occurrence as required by Technical Specification 6.6.B.I.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

On October 29, 1975, immediately following the return of the Unit 2 diesel to service, the Uni t Two operator received the RHR SYSTEM 2 SUPPLY FROM EMERGENCY DIESEL and the CORE SPRAY SYSTEM 2 BUS / LOGIC POWE A subsequent investigation lead to the discovery that SW #12 of 125 VDC Bus 2B was in the OFF position, making the automatic initiation logic of tha Core Spray and RHR "B" systems both inoperable.

The swltch was returned to the ON position and did not trip.

The unit was in the cold shutdown condition at the time of this occurrence.

This occurrence was discussed by telephone with Mr.

30, 1975 Knop of your office on October Report A0 50-265/75-43Further information will be provided by Abnormal Occurrence this occurrence.

-which will be submitted within 10 days of the date of Vary truly yours, T

COMMONWEALTH EDISON COMPANY QUAD-CITIES NUCLEAR POWER STATION

/ // /

'f

/ [/S% d ds?

N. J. Kalivianakis %

Station Superintendent NJK/RAR/lk cc: Office.of Nuclear Reactor Regulation G. A. Abrell