Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217A99330 September 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data
SVP-99-204, Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With30 September 1999Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With
ML20217A16922 September 1999Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers
ML20212J05021 September 1999Safety Evaluation Re Licensee Implementation Program to Resolve USI A-46 at Plant,Per GL 87-02,Suppl 1Safe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Earthquake
SVP-99-179, Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With31 August 1999Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With
ML20210L8662 August 1999Safety Evaluation Accepting License 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related MovsStroke time
SVP-99-155, Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With31 July 1999Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With
SVP-99-148, Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With30 June 1999Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
ML20195K14816 June 1999Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & SafetyStroke time
Incorporated by reference
SVP-99-123, Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With31 May 1999Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With
ML20195B25919 May 1999Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood StationsOffsite Dose Calculation Manual
Process Control Program
SVP-99-104, Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With30 April 1999Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With
SVP-99-102, Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with30 April 1999Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. withSafe Shutdown
Unanalyzed Condition
Hydrostatic
Battery sizing
Turbine Missile
Fuel cladding
Fire Protection Program
Flow Induced Vibration
ML20205Q52916 April 1999SER Concluding That Quad Cities Nuclear Power Station,Unit 1,can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be MaintainedWeld Overlay
ML20205J6017 April 1999Safety Evaluation Accepting Proposed Merger of Calenergy Co, Inc & Midamerican Holdings Co for Quad Cities Nuclear Power Station,Units 1 & 2
SVP-99-071, Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With31 March 1999Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.WithSafe Shutdown
ML20205C56719 March 1999Simulator Four-Yr Certification ReptSafe Shutdown
ML20207D2341 March 1999Post Outage (90 Day) Summary Rept, for ISI Exams & Repair/Replacement Activities Conducted 981207-1205Reactor Vessel Water Level
Weld Overlay
Hydrostatic
VT-2
EVT-1
Liquid penetrant
Flow Induced Vibration
ML20204B15728 February 1999Monthly Operating Repts for Feb 1999 for Quad Cities,Units 1 & 2.WithShutdown Margin
SVP-99-021, Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With31 January 1999Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).WithSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Stroke time
Weld Overlay
Internal Flooding
Hydrostatic
Temporary Modification
Feedwater Controller Failure
Turbine Missile
Scaffolding
Flow Induced Vibration
SVP-99-007, Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With31 December 1998Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With
ML20205D13131 December 19981998 Decommissioning Funding Status Rept for Yr Ending 981231 for Quad Cities Nuclear Power Station,Units 1 & 2
ML20205M70631 December 1998Unicom Corp 1998 Summary Annual Rept. with
SVP-98-364, Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With30 November 1998Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With
ML20196G12430 November 1998COLR for Quad Cities Unit 1 Cycle 16
ML20196D96530 November 1998Safety Evaluation Supporting Relief Requests CR-21 & CR-24, Respectively.Relief Request CR-23,proposed Alternative May Be Authorized,Per 10CFR50.55a & Relief Request CR-22 Was Withdrawn by LicenseeVT-2
ML20196C87330 November 1998Rev 0 to GE-NE-B13-01980-30-1, Fracture Mechanics Evaluation on Observed Indications at Two Welds in Recirculation Piping of Quad Cities,Unit 1 StationWeld Overlay
ML20196C83930 November 1998Rev 0 to GE-NE-B13-01980-030-2, Assessment of Crack Growth Rates Applicable to Induction Heating Stress Improvement (IHSI) Recirculation Piping in Quad Cities Unit 1
ML20196A97620 November 1998Safety Evaluation Re Licensee 180-day Response to GL 95-07, Thermal Binding of Safety-Related Power-operated Gate ValvesPower-Operated Valves
Backfit
ML20196A41919 November 1998Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB
SVP-98-346, Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With31 October 1998Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.WithUltimate heat sink
SVP-98-358, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.With31 October 1998Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.WithHot Short
Safe Shutdown
High Radiation Area
Stroke time
Time to boil
Hydrostatic
Operating Basis Earthquake
Temporary Modification
Emergency Lighting
Test box
Scram Discharge Volume
Hardened vent
SVP-98-326, Monthly Operating Repts for Sept 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With30 September 1998Monthly Operating Repts for Sept 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With
ML20153D01918 September 1998Part 21 Rept Re Defect in Gap Conductance Analyses for co- Resident BWR Fuel.Initially Reported on 980917.Corrective Analyses Performed Demonstrating That Current Operating Limits Bounding from BOC to Cycle Exposure of 8 Gwd/MtuFuel cladding
ML20153C67717 September 1998Part 21 Rept Re Defect Relative to MCPR Operating Limits as Impacted by Gap Conductance of co-resident BWR Fuel at Facilities.Operating Limit for LaSalle Unit 2 & Quad Cities Unit 2 Will Be Revised as Listed
ML20151T2714 September 1998Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002Coatings
Foreign Material Exclusion
ML20151Y72631 August 1998Monthly Operating Repts for Aug 1998 for Quad Cities Nuclear Power Station
ML20237E23321 August 1998Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical ReptOffsite Dose Calculation Manual
Process Control Program
Fire Protection Program
ML20237A62531 July 1998Monthly Operating Repts for July 1998 for Quad Cities Nuclear Power Station,Unit 1 & 2Scram Discharge Volume
ML20151Y73031 July 1998Revised MOR for Jul 1998 for Quad Cities Nuclear Power Station,Units 1 & 2
SVP-98-328, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With15 July 1998Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).WithHot Short
Safe Shutdown
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Internal Flooding
Hydrostatic
Operator Manual Action
Temporary Modification
Zebra Mussel
Emergency Lighting
Test box
Battery sizing
Earthquake
Biofouling
Pressure Boundary Leakage
Fire Protection Program
Scaffolding
SVP-98-249, Monthly Operating Repts for June 1998 for Quad Cities Nuclear Power Station,Units 1 & 230 June 1998Monthly Operating Repts for June 1998 for Quad Cities Nuclear Power Station,Units 1 & 2Scram Discharge Volume
SVP-98-215, Monthly Operating Repts for May 1998 for Quad Cities Nuclear Power Station Units 1 & 231 May 1998Monthly Operating Repts for May 1998 for Quad Cities Nuclear Power Station Units 1 & 2Stroke time
Scram Discharge Volume
ML20247N62819 May 1998Rev 2 to COLR for Quad Cities Unit 2 Cycle 15Feedwater Controller Failure
ML20216C05630 April 1998Safe Shutdown Rept for Quad Cities Station,Units 1 & 2, Vols 1 & 2.W/22 Oversize FiguresHot Short
Safe Shutdown
Fire Barrier
Emergency Lighting
Exemption Request
Fire Protection Program
SVP-98-176, Monthly Operating Repts for Apr 1998 for Quad Cities Nuclear Power Station,Units 1 & 230 April 1998Monthly Operating Repts for Apr 1998 for Quad Cities Nuclear Power Station,Units 1 & 2Safe Shutdown
Operator Manual Action
Scram Discharge Volume
ML20217D02822 April 1998Part 21 Rept Re Additive Constants Used in MCPR Determination for Siemens ATRIUM-9B Fuel by Core Monitoring Sys Were Found to Be non-conservative.SPC Personnel Notified All Customers w/ATRIUM-9B Lead Test AssembliesFitness for Duty
ML20217G3958 April 1998TS 3/4.8.F Snubber Functional Testing Scope Quad Cities Unit 2 TS (Safety-Related) Snubber Population 129 Snubbers
SVP-98-128, Monthly Operating Repts for Mar 1998 for Quad Cities Nuclear Station Units 1 & 231 March 1998Monthly Operating Repts for Mar 1998 for Quad Cities Nuclear Station Units 1 & 2Scram Discharge Volume